| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.4 L+₹33,338.24 (4.15%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Documents Incompleted | |
| 4 | Rejected-Technical | - | Rejected-Technical Documents Incompleted | |
| 5 | Rejected-Technical | - | Rejected-Technical Documents Incompleted |
Tender Value
₹9.1 L
EMD Value
₹18,000
Closing Date
13 Dec 2022, 11:00 amClosed
E.E. M.G.C.C.D-5, Bijnor
E.E. M.G.C.C.D-5, Bijnor
Construction of V.R.B. at km. 10.715 of Kundarki Dy. Under Madhya Ganga Canal Stage-II.
2022_UPIDC_756419_11
04/EE/2022-23
Open Tender
Civil Works - Bridges
Item Wise
90 days
kundarki
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹18,000
27 Apr 2023
7 Dec 2022
13 Dec 2022
7 Dec 2022
13 Dec 2022
7 Dec 2022
Amount
Earth work in excavation of foundation in ordinary soil with 30m lead and1.5m lift with proper disposal and back filling i/c all labour , T&P etc. complete.
Providing centering and shuttering for CC i/c all cost of material, laobur etc. complete.
Supplying & Laying Cement concrete 1:3:6 (M-10)in foundation including cost of all material, labour T &P etc complete.
Ist Class (M-100) brick work in 1:4 cement & c.sand mortar including cost of all material ,labour and T&P etc. complete.
Ordinary centering and shuttering for R.C.C work i/c all cost of material, laobur etc. complete.
Laying R.C.C. 1:1.5:3(M-20) including all cost of material, labour T&P etc.complete.
Laying R.C.C. 1:1:2 (M-25) for Wearing coat including all cost of material, labour T&P etc.complete.
Supply & placing steel Reinforcement i/c cost of all maerial , cutting ,Bending, Binding,welding etc all completion of work.
Cement Struck deep pointing in 1:2 C.M. including cost of all Material, Labour and T&P etc Complete.
Supplying and Laying of two coat tarfelt painting as required including all cost of Labour and T&P, Material etc. complete required for proper complition of work. As directed by engineer in charge.
Supplying and Fixing Sign board (1.50X1.00M) i/c cost of all materials , labour, T&P etc. required for proper completion of work.
Supplying and laying 100mm dia G.I. spout pipe for drainage as per approved drawing including all cost of material , labour and T&P. etc required for proper completion of work.
Earth work in filling in all type of soil including average lead upto 600M and lift upto 1.50M i/c ramming ,dressing ,all cost of material ,labour and T&P etc. complete.
Earth work in excavation For Removing diversion including lead upto 30 m and lift upto 1.50 m i/c cost of labour, T&P, ramming , dressing , etc. complete as per direction of Engineer-in -Charge.
Supplying and Laying of R.B.M.i/c cost of all materials, labour, T&P etc. required for proper completion of work.
Supply and Laying of Brick on Edge .i/c cost of all materials, labour, T&P etc. required for proper completion of work.
Supply and fixing wheel guard including all cost of material, labour and T&P etc. complete.
JS cONSTRUCTIONS
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .