Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC MAIN ROAD NAWANAGAR DISTT SINGRAULI MP 486884 | NAWANAGAR | SINGRAULI | MADHYA PRADESH | 486884 | L1 | Accepted-AOC AS PER TC DELIBERATION | |
| 2 | L2₹1.0 Cr+₹2,484 (0.02%)Rejected-Finance MAJAN KHURD MAJAN MORE P O KACHANI DIST SINGRAULI M P | KACHANI | SINGRAULI | MADHYA PRADESH | L2 | Rejected-Finance NOT L1 BIDDER | |
| 3 | Rejected-Technical KOTA BASTI PO SHAKTINAGAR DISTT SONBHADRA U P PIN 231222 | KOTA BASTI | SONBHADRA | UTTAR PRADESH | 231222 | - | Rejected-Technical AS PER TC DELIBERATION |
Tender Value
₹1.2 Cr
EMD Value
₹1.5 L
Closing Date
23 Jan 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM(EnM), Nigahi Area
office of the GM(EnM), Nigahi Area, NCL, Singrauli, M.P., 486884
Operation of pumps and regulation of controlling valves of pumps installed for dewatering of mine water in East and West section of Nigahi Project during Non-Monsoon and Monsoon for period of 455 Days.
2023_NCL_266551_1
NGH/EM/e-Tender/22-23/24 dtd. 04.01.2023
Open Tender
Miscellaneous Works
Item Rate
455 days
NCL Nigahi Project
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.5 L
24 Mar 2023
4 Jan 2023
24 Jan 2023
4 Jan 2023
23 Jan 2023
5 Jan 2023
4 Jan 2023 - 10 Jan 2023
Amount
Operation of Pumps and regulating of Controlling valves of pumps installed for dewatering of mine water in East and West section of Nigahi Project during Non- Monsoon period at Nigahi Project by deploying 09 nos. semi-skilled manpower per shift i.e. 27 nos. semi-skilled manpower daily for 332 days at required site i.e., east turra, west turra, east purewa & west purewa etc. (It wil be sole responsibility of the contractor to transport manpower at required site).(rate inclusive of CMPF, CMPS, Contractor profit)
Operation of Pumps and regulating of Controlling valves of pumps installed for dewatering of mine water in East and West section of Nigahi Project during Monsoon period at Nigahi Project by deploying 12 nos. semi-skilled manpower per shift i.e. 36 nos. semi-skilled manpower daily for 123 days at required site i.e., east turra, west turra, east purewa & west purewa etc.(It wil be sole responsibility of the contractor to transport manpower at required site).(rate inclusive of CMPF, CMPS, Contractor profit)
Total impact of GST for the purpose of CTC
M/S I.P. ASSOCIATES
stage.html
html • 0.05 MB
technical_275760.pdf
PDF • 0.37 MB
techsummary_275760.pdf
PDF • 0.20 MB
finance_275760.pdf
PDF • 0.20 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_275760.pdf
PDF • 0.21 MB
loi29.pdf
PDF • 1.40 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .