| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.2 CrAccepted-AOC GRAM DEVRADA TARABGANJ DISTRICT GONDA UTTAR PRADESH | GONDA | UTTAR PRADESH | 271001 | ₹40.2 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹41.3 Cr+₹1.1 Cr (2.63%)Rejected-Finance | ₹41.3 Cr+₹1.1 Cr (2.63%) | L2 | Rejected-Finance L2 |
| 3 | L3₹43.2 Cr+₹3.0 Cr (7.34%)Rejected-Finance NAWABGANJ GONDA UTTAR PRADESH 271303 | GONDA | GONDA | UTTAR PRADESH | 271303 | ₹43.2 Cr+₹3.0 Cr (7.34%) | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/s Alok Construction L1 | M/S SRI JAN CONSTRUCTION L3 | M/s Chopra Traders L2 |
|---|---|---|---|---|---|---|
| 1.00 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres. | 36,333 | Cum | 3.45 ₹1,25,348.85 Lowest | 3.6 ₹1,30,798.8 | 3.5 ₹1,27,165.5 |
| 2.00 | Excavation for trench of roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.as per clause 301(3.1) | 11,639 | Cum | 55 ₹6,40,145 Lowest | 58 ₹6,75,062 | 57 ₹6,63,423 |
| 3.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m ,spreading, grading to required slope and compacting to meet requirement of table 300.2 | 1,80,710 | Cum | 144 ₹2,60,22,240 Lowest | 152 ₹2,74,67,920 | 150 ₹2,71,06,500 |
| 4.00 | Construction of subgrade with earthen soulders with approved material obtained from borrow pits with a lift upto 1.5m , transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2 | 27,406 | Cum | 247 ₹67,69,282 Lowest | 260 ₹71,25,560 | 250 ₹68,51,500 |
| 5.00 | Construction of Subgrade and earthen soulder,s deposited from roadway (Compaction only) | 11,639 | Cum | 68 ₹7,91,452 Lowest | 72 ₹8,38,008 | 72 ₹8,38,008 |
| 6.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 12,389 | Cum | 4,650 ₹5,76,08,850 | 4,900 ₹6,07,06,100 | 4,460 ₹5,52,54,940 Lowest |
| 7.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 21,937 | Cum | 5,800 ₹12,72,34,600 Lowest | 6,120 ₹13,42,54,440 | 6,000 ₹13,16,22,000 |
| 8.00 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 | 1,03,089 | Sqm | 40.2 ₹41,44,177.8 Lowest | 42.8 ₹44,12,209.2 | 42 ₹43,29,738 |
| 9.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.. | 6,185 | Cum | 12,500 ₹7,73,12,500 Lowest | 13,300 ₹8,22,60,500 | 13,000 ₹8,04,05,000 |
| 10.00 | Providing and applying tack coat with bitumen using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 1,03,089 | Sqm | 11 ₹11,33,979 Lowest | 12 ₹12,37,068 | 12 ₹12,37,068 |
Tender Value
₹43.5 Cr
EMD Value
₹50 L
Closing Date
6 Mar 2026, 12:00 pmClosed
SE GONDA CIRCLE PWD GONDA
SE GONDA CIRCLE PWD GONDA
Widening and Strenthening of Bhawaniyapur Laxmanpur Hindunagar Ramavapur Nayak Road
2026_CEDPW_1119933_1
827/98Com/Gonda Circle/25-26 DT 17.02.26
Open Tender
Civil Works
Item Wise
450 days
GONDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Yes
₹50 L
Yes
GONDA
30 May 2026
25 Feb 2026
6 Mar 2026
25 Feb 2026
6 Mar 2026
25 Feb 2026
26 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres. | 36,333 | Cum | 3.68 | ₹1,33,705.44 |
| 2 | Excavation for trench of roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.as per clause 301(3.1) | 11,639 | Cum | 58.8 | ₹6,84,373.2 |
| 3 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m ,spreading, grading to required slope and compacting to meet requirement of table 300.2 | 1,80,710 | Cum | 153.6 | ₹2,77,57,056 |
| 4 | Construction of subgrade with earthen soulders with approved material obtained from borrow pits with a lift upto 1.5m , transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2 | 27,406 | Cum | 263.1 | ₹72,10,518.6 |
| 5 | Construction of Subgrade and earthen soulder,s deposited from roadway (Compaction only) | 11,639 | Cum | 72.6 | ₹8,44,991.4 |
| 6 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 12,389 | Cum | 4,988 | ₹6,17,96,332 |
| 7 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 21,937 | Cum | 6,190 | ₹13,57,90,030 |
| 8 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 | 1,03,089 | Sqm | 42.8 | ₹44,12,209.2 |
| 9 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.. | 6,185 | Cum | 13,347 | ₹8,25,51,195 |
| 10 | Providing and applying tack coat with bitumen using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 1,03,089 | Sqm | 12.2 | ₹12,57,685.8 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.46 MB
BOQ_2083068.xls
BOQ • 0.31 MB
SBD.pdf
Tender Documents • 1.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .