| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 CrAdmitted-Finance | +8.40% | ₹5.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.0 CrAdmitted-Finance | +9.75% | ₹6.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹6.1 CrAdmitted-Finance | +11.27% | ₹6.1 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical As per ACE Zone Jaipur Order No 3129 dated 21.08.2026. |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical As per ACE Zone Jaipur Order No 3129 dated 21.08.2026. |
Tender Value
₹5.4 Cr
EMD Value
₹10.9 L
Closing Date
24 Jul 2026, 3:00 pmClosed
ACE WR ZONE JAIPUR
ACE WR ZONE JAIPUR
Restoration of Madhyha Pushkar Sarovar Village Nedaliya Gram Panchayat Kanas and Restoration of drainage System for IDSMT Colony Pushkar Tehsil Pushkar District Ajmer
2026_WRDAS_572320_3
ACE Nit No 03/2026-27/WRD-II AJMER
Open Tender
Civil Works
Percentage
455 days
Under Jurisdiction of WRD II AJMER
Please refer tender document
3 documents required · 3 mandatory
₹10,000
EE WRD II AJMER/MD RISL JAIPUR
₹10.9 L
Yes
ACE WR ZONE JAIPUR
25 Aug 2026
1 Jul 2026
27 Jul 2026
1 Jul 2026
24 Jul 2026
1 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary | - | Sqm | 1.45 | - |
| 2 | Dismantling cement concrete including disposal of material within 50 m lead, inclusive of de-watering wherever required.
The rates given are for dismantling of good quality work.For dismantling poor quality or weathered; weakened work the rates will be reduced by 30 percent | - | Cum | 452.2 | - |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil | - | Cum | 79 | - |
| 4 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum | 1 | Cum | 98 | ₹97.9 |
| 5 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Soft / Disintegrated rock | 1 | Cum | 134 | ₹133.87 |
| 6 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Hard rock not requiring blasting | 1 | Cum | 201 | ₹200.8 |
| 7 | Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required | - | cum | 8.5 | - |
| 8 | Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5 m or part there of including loading and un- loading wherever required For 3rd Lift | 1 | Cum | 17 | ₹16.98 |
| 9 | Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5 m or part there of including loading and un- loading wherever required For 3rd Lift | 1 | Cum | 25.5 | ₹25.47 |
| 10 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | - | Sqm | 220 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_1018234.xls
BOQ • 0.28 MB
TECH_BID.pdf
Tender Documents • 5.64 MB
AddendumCorrigendum_3.pdf
PDF • 0.21 MB
Addendum_condition.pdf
PDF • 0.52 MB
timeextended.pdf
PDF • 0.13 MB
AddendumCorrigendum.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].