| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹12.9 L+₹77,425 (6.37%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹13.0 L+₹87,434 (7.19%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹13.9 L+₹1.8 L (14.5%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹18.9 L
EMD Value
₹37,760
Closing Date
14 Feb 2026, 6:00 pmClosed
E.E. PWD City Dn - II,Jaipur
E.E. PWD City Dn - II,Jaipur
Day to Day and Urgent Emergency Repair and Maintenance work SMS Hospital II, Jaipur. (Additional Civil work)
2026_CEPWD_536237_7
ST Nit No 56 of 2025-26 C-2
Open Tender
Civil Works - Buildings
Percentage
75 days
Under Jurisdiction of City Dn - II
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Through E-Grass Challan City Dn-II Office ID 9084
₹37,760
Yes
17 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
14 Feb 2026
9 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of Material Building Rubbish Stone metal (Grit and ballast etc.) including loading and unloading with all lead | 212 | Cum | 240 | ₹50,880 |
| 2 | Grading roof for water proofing treatment with water proffing compound Cement concretee 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 10 | Cum | 4,483 | ₹44,830 |
| 3 | Providing gola 75x75 mm in cement concretee 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10mm and down gauge) including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : | 100 | Mtr. | 111 | ₹11,100 |
| 4 | Providing & fixing UV stabilised fiberglass reinforced plastic sheet roofing upto any pitch including fixing with polymer coated ‘J’ or ‘L’ hooks, bolts & nuts 8mm dia. G.I plain/bitumen washers complete but excluding the cost of purlins, rafters, trusses etc. The sheets shall be manufactured out of 2400 TEX panel rovigs incorporating minimum 0.3% Ultra-voilet stabiliser in resin system under approximately 2400 psi and hot cured. They shall be of uniform pigmentation and thickness without air pockets and shall confoim to IS 10192 and IS 12866.The sheets shall be opaque or translucent, clear or pigmented, textured or smooth as specified. 5.0mm thick (Wt. 8.4 Kg./Mtr. Sq.) | 4 | Sqm | 1,872 | ₹7,488 |
| 5 | Kota stone slab flooring 25 mm thick over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) For area of each slab from 2001 to 5000 Sq.Cm | 100 | Sqm | 1,023 | ₹1,02,300 |
| 6 | Providing and fixing designer cement concretee polished tiles over 20mm average thick base of CM 1 :4 (1 Cement : 4 sand) jointing with cement mortar 1 :2 ( 1cement : 2 sand) with pigment to match the shade of the tiles having minimum thickness of 25mm complete with all respect. ( as per IS 1237:2012) | 100 | Sqm | 1,180 | ₹1,18,000 |
| 7 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish : 20mm thick. | 500 | Sqm | 190 | ₹95,000 |
| 8 | Providing and fixing double scaffolding system on the exterior side, upto five story made with 4" wooden member 1.5 m c/c horizontal and vertical direction joining with rassi, clamps, challies. The scaffolding system shall be stiffened with bracing, runner, connection of building if necessary with all essential safty features for the workmen etc complete as per direction of EI.The lavation area of the scaffolding shall be measured for payment. The payment will be made once irrespective of duration of scaffolding.
Note : This item to be used for maintence work judicially | 600 | Sqm. | 162 | ₹97,200 |
| 9 | Repair of existing steel glazed doors, windows and ventilator, MS sheet door, garge doors, compound wall gates etc. by welding drilling complete include. Cost of welding rods and hire charge of welding meachine and TP etc complete | 150 | Sqm. | 332 | ₹49,800 |
| 10 | Repair to damaged RCC slabs, beams and columns etc for strengthening with cement mortar 1 : 2 in following steps :-
i) Choping losse and cracked concretee to required depth, cleaning the exposed surface of steel and concretee with wire brush and sand papering , cleaning of concretee surface with water as necessary and getting dried.
ii) Applying Epoxy primer on the exposed steel bars.
iii) Applying Epoxy hardener and resin mix (as per manufectured's specification) on concretee and steel bars with brush.
iv) Spreading dry cement mortar 1 : 2 mix over epoxy treated wet surface and allow it to dry for one day.
v) Plastering the surface with cement sand mortar 1 : 3 upto depth of 30mm complete.
vi) Cure the plastered surface for 15 days, All work including scaffolding etc. complete in all respect. | 100 | Sqm | 1,568 | ₹1,56,800 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.32 MB
Tendernotice_2.pdf
PDF • 3.22 MB
Tender_Document_56_07.pdf
Tender Documents • 7.65 MB
BOQ_955185.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .