Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC LASKARBANDH NATUNDANGA BURDWAN BARDHAMAN 713381 WEST BENGAL INDIA | BARDHAMAN | BURDWAN | WEST BENGAL | 713381 | ₹4.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.9 L+₹7,307.90 (1.52%)Rejected-Finance 121004 | ₹4.9 L+₹7,307.90 (1.52%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.0 L+₹23,181.55 (4.83%)Rejected-Finance P O PANDESWAR DANNYA BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713346 | ₹5.0 L+₹23,181.55 (4.83%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | GHOSH ENTERPRISE L2 | SAILEN DAS L1 | AZAM ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Construction of 06 (SIX) no. of Ventilation Stoppings at 5 no. pit (Laskarbandh unit) Madhaipur Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Site cleaning | 20.3 | Cubic Meter | 675 ₹13,702.5 | 655.35 ₹13,303.61 Lowest | 680 ₹13,804 |
| 1.02 | Recess cutting in floor hard stone | 1.86 | Cubic Meter | 4,750 ₹8,835 Lowest | 5,822.48 ₹10,829.81 | 6,500 ₹12,090 |
| 1.03 | Recess cutting in coal(roof) | 4.02 | Cubic Meter | 1,625 ₹6,532.5 | 1,621.45 ₹6,518.23 Lowest | 1,700 ₹6,834 |
| 1.04 | Recess cutting in coal(side) | 1.97 | Cubic Meter | 1,625 ₹3,201.25 | 1,621.45 ₹3,194.26 Lowest | 1,700 ₹3,349 |
| 1.05 | Cement Brick work(1:8) | 41.03 | Cubic Meter | 6,975 ₹2,86,184.25 | 6,852.59 ₹2,81,161.77 Lowest | 7,200 ₹2,95,416 |
| 1.06 | Cement plaster(1:6) both side | 82.95 | Cubic Meter | 385 ₹31,935.75 | 378.23 ₹31,374.18 Lowest | 390 ₹32,350.5 |
| 1.07 | Loading unloading into Tub | 83 | Tubs | 750 ₹62,250 | 723.69 ₹60,066.27 Lowest | 750 ₹62,250 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹4.8 L
EMD Value
₹6,000
Closing Date
10 Jan 2026, 6:00 pmClosed
Area Survey Officer
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Construction of 06 (SIX) no. of Ventilation Stoppings at 5 no. pit (Laskarbandh unit) Madhaipur Colliery, Pandaveswar Area
2025_ECL_350335_1
GM/PND/Sur/Ten/25-26/118/294 Dated 29.12.2025
Open Tender
Civil Works - Others
Item Rate
30 days
Madhaipur Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,000
10 Sept 2026
31 Dec 2025
12 Jan 2026
31 Dec 2025
10 Jan 2026
31 Dec 2025
31 Dec 2025 - 3 Jan 2026
Construction of 06 (SIX) no. of Ventilation Stoppings at 5 no. pit (Laskarbandh unit) Madhaipur Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF)
Site cleaning
Recess cutting in floor hard stone
Recess cutting in coal(roof)
Recess cutting in coal(side)
Cement Brick work(1:8)
Cement plaster(1:6) both side
Loading unloading into Tub
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.61 MB
BOQ_363088.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .