| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC | L1 | Accepted-AOC Lowest Amount Quoted | |
| 2 | L2₹10.0 L+₹19,358 (1.97%)Rejected-AOC VADIVELAYYANAYAM | L2 | Rejected-AOC Highest Amount Quoted |
| Sl No | Description | Qty | Unit | Murugesan L2 | M/s Sri Kumaran Borewells L1 |
|---|---|---|---|---|---|
| 1.00Extension of Pipeline from Seengupathy Sadimalai to Pottapathy and Vellapathy area H/o Madvarayapuram Panchayat | |||||
| 2.00Supply and delivery of HDPE(PN6) Pipes for potable water supply with necessary couplers (or) bell ended pipes as specified in ISI, the required quantity of solvent cement and having the following working pressure. The cost of pipes should include loading. freight, transit insurance, incidental charges, packing. taxes and transportation charges upto stack yard in good condition etc., complete (the cost excluding unloading from lorries at stack yard and stacking which will be paid separately) | |||||
| 3.00 | 75 MM HDPE PIPE(PN 6) | 1,930 | M | 178 ₹3,43,540 | 176.3 ₹3,40,259 Lowest |
| 4.00Earth work excavation and depositng on bank within an initial lead of 10 m and initial lift 0 to 2 m in Hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders for laying pipeline in respect of following size of pipe with standard trench width and required depth including shoring, struting, balling out water wherever necessary and all other incidental works such as barricading, providing danger lights, labour for watch and ward,as oer standard specifications | |||||
| 5.00 | 75 MM HDPE PIPE(PN 6) | 1,930 | M | 210 ₹4,05,300 | 207.1 ₹3,99,703 Lowest |
| 6.00Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste as per standard specifications | |||||
| 7.00 | 75 MM HDPE PIPE(PN 6) | 1,930 | M | 22 ₹42,460 | 20 ₹38,600 Lowest |
| 8.00Refilling with excavated earth (other than sand) in respect of following sizes of pipes watered well rammed and consolidated etc. complete complying with standard specification for filling the trenches after the pipes and specials are laid, jointed and tested | |||||
| 9.00 | 75 MM HDPE PIPE(PN 6) | 1,930 | M | 30 ₹57,900 | 28.1 ₹54,233 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,52,856 ₹1,52,856 | 1,49,903 ₹1,49,903 Lowest |
Tender Value
₹10.2 L
EMD Value
₹10,160
Closing Date
13 Feb 2026, 3:00 pmClosed
Special Officer, Madvarayapuram
Panchayat Office, Madvarayapuram Panchayat
Extension of Pipeline from Seengupathy Sadimalai to Pottapathy and Vellapathy area H/o Madvarayapuram Panchayat
2026_RDTN_654508_1
1/2025/FRA EPL MP
Open Tender
Civil Works
Item Rate
Seengupathy
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,160
Yes
Panchayat Office, Madvarayapuram Panchayat
18 Feb 2026
10 Feb 2026
13 Feb 2026
10 Feb 2026
13 Feb 2026
10 Feb 2026
12 Feb 2026
Extension of Pipeline from Seengupathy Sadimalai to Pottapathy and Vellapathy area H/o Madvarayapuram Panchayat
Supply and delivery of HDPE(PN6) Pipes for potable water supply with necessary couplers (or) bell ended pipes as specified in ISI, the required quantity of solvent cement and having the following working pressure. The cost of pipes should include loading. freight, transit insurance, incidental charges, packing. taxes and transportation charges upto stack yard in good condition etc., complete (the cost excluding unloading from lorries at stack yard and stacking which will be paid separately)
75 MM HDPE PIPE(PN 6)
Earth work excavation and depositng on bank within an initial lead of 10 m and initial lift 0 to 2 m in Hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders for laying pipeline in respect of following size of pipe with standard trench width and required depth including shoring, struting, balling out water wherever necessary and all other incidental works such as barricading, providing danger lights, labour for watch and ward,as oer standard specifications
75 MM HDPE PIPE(PN 6)
Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste as per standard specifications
75 MM HDPE PIPE(PN 6)
Refilling with excavated earth (other than sand) in respect of following sizes of pipes watered well rammed and consolidated etc. complete complying with standard specification for filling the trenches after the pipes and specials are laid, jointed and tested
75 MM HDPE PIPE(PN 6)
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
PBEPLMP.pdf
Tender Documents • 0.34 MB
TBEPLMP.pdf
Tender Documents • 0.38 MB
BOQ_784805.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .