| Sl No | Description | Qty | Unit | SRI SPS ASSOCIATES L1 | N S P ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and cleaning and levelling the site etc.,complete | 677 | M3 | 203 ₹1,37,431 Lowest | 204 ₹1,38,108 |
| 2.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates andeight coarse aggregates) using 40mmsize |SS HBG metal including cost and conveyanceof all materials to site and including for themixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 50 | M3 | 5,338 ₹2,66,900 Lowest | 5,339 ₹2,66,950 |
| 3.00 | Centering with steel centering for revetment,drain and culvert Above1.20m depth using MS sheet of size0.90X0.60m10 gauge thick and stiffened with MS ‘L' angle wood runners of size 0.075X0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr (above 4 Feet) | 1,538 | M2 | 337 ₹5,18,306 Lowest | 338 ₹5,19,844 |
| 4.00 | Supply and erecting centering for sides and soffits including supports and strutting upto 3 29m high for plane surfaces such as RCC silabs,Rectangular beems,Tee (or) ECC Beam, Lintel,Bed Block,Staircase waist and landing slabs landing beams,canopy etc., in all floor with all cross bracings using mild steel sheets of size 90cmxX60cm and BG10 stiffened with welded milds teel angles of size25mMmmMmxXx25X3mmMm for boarding laid over country wood joinsts of size1O0cmxX6.50cm space data bou t90cmC/C and supports by Causrina props of 10cm to 13cm dia spaced at 75cm C/C etc., completed as | 8 | M2 | 1,154 ₹9,232 Lowest | 1,156 ₹9,248 |
| 5.00 | Supplying and fabricating and placing in postion M Sor RTS Bar reinforcement to all RCC Works as per the design given including cost of steel and bending wire also all floors.as directed by departmental officer etc., complete. | 128 | M3 | 9,152 ₹11,71,456 Lowest | 9,153 ₹11,71,584 |
| 6.00 | Reinforced Cement concretet 1:1.5 :3 (one cement, one and half MS and & three course aggregate) using 20 mm gauge hand broken /and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever | 258 | M3 | 9,181 ₹23,68,698 Lowest | 9,183 ₹23,69,214 |
| 7.00 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBGmetal including cost and conveyanceof all materials to site and including for themixing, laying and labour charges etc., complete as per standard specification | 1 | M3 | 6,680 ₹6,680 Lowest | 6,690 ₹6,690 |
| 8.00 | Plastering in Cement Mortar 1:5 mix 12mm thick thick for all internal/external surfaces like super structure, rainwater, ducts, elevation in all floors complying with standard specifications. | 288 | M2 | 290 ₹83,520 Lowest | 292 ₹84,096 |
| 9.00 | Supplying and fixing of 600mm diameter SFRA (218KGS) Heavy duty Man hole cover etc., | 1 | Nos | 2,701 ₹2,701 Lowest | 2,702 ₹2,702 |
| 10.00 | Conveyance of surpluss earth from works it eto city outer with average lead of 15km including loading and unloading etc., complete | 677 | M3 | 166 ₹1,12,382 Lowest | 168 ₹1,13,736 |
Tender Value
₹56 L
EMD Value
₹56,000
Closing Date
17 Jul 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Storm water Drain and Culvert from Lakshmi Nagar to 80 Road canal in ward no.5,East Zone.
2025_MAWS_578304_14
e36/2025 -Two Cover
Open Tender
Civil Works
Works
60 days
Coimbatore corporation
As Per Tender Document
4 documents required · 4 mandatory
₹0
₹56,000
1 Nov 2025
5 Jul 2025
18 Jul 2025
5 Jul 2025
17 Jul 2025
5 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .