Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.7 LAccepted-AOC | ₹9.7 L | 1 | Accepted-AOC 1 |
| 2 | 2₹9.7 LRejected-AOC | ₹9.7 L | 2 | Rejected-AOC 2 |
| Sl No | Description | Qty | Unit | HATHIKA CONSTRUCTION L2 | TSR Builder L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 36 | cum | 158.06 ₹5,690.16 | 153.8 ₹5,536.8 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying water carrying with all leads of good water compacting and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 9 | cum | 5,108.26 ₹45,974.34 | 5,104 ₹45,936 Lowest |
| 3.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation | 180 | cum | 310.13 ₹55,823.4 | 305.87 ₹55,056.6 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 27.6 | cum | 6,481.46 ₹1,78,888.3 | 6,477.2 ₹1,78,770.72 Lowest |
| 5.00 | Providing and laying Tack Coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 665 | sqm | 21.3 ₹14,164.5 | 17.04 ₹11,331.6 Lowest |
| 6.00 | Providing and laying 50 mm compacted thick Dense Bituminous Macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications. | 33.25 | cum | 9,403.36 ₹3,12,661.72 | 9,399.1 ₹3,12,520.08 Lowest |
| 7.00 | Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 / VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 19.95 | cum | 10,476.06 ₹2,08,997.4 | 10,471.8 ₹2,08,912.41 Lowest |
| 49.00Sub Total | |||||
| 50.00 | GST 18% | 1 | No | 1,47,996 ₹1,47,996 | 1,47,252 ₹1,47,252 Lowest |
Tender Value
₹9.8 L
EMD Value
₹9,800
Closing Date
23 Sept 2025, 3:00 pmClosed
Commissioner
Tiruvannamalai City Municipal Corporation
Providing BT Surface and construction of Strom water drain at Ammaniamman street 040013R267 in tiruvannamalai City Municipal Corporation.
2025_MAWS_605423_1
1331/2025/E1
Open Tender
Civil Works
Works
30 days
Tiruvannamalai City Municipal Corporation
Places Refer Tender Notices
2 documents required · 2 mandatory
₹0
₹9,800
30 Jun 2026
18 Sept 2025
23 Sept 2025
18 Sept 2025
23 Sept 2025
18 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].