| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.4 LAccepted-Finance | ₹10.4 L | 1 | Accepted-Finance Admitted |
| 2 | 2₹10.5 LAccepted-Finance | ₹10.5 L | 2 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | M M Engineers L2 | M/s AADRIKA ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.01 | Disconnecting of HT supply from main panel after switching off 11 KV VCB discharging the supply. Complete drain out of transformer oil from transformer into empty oil drum by oil machine, dismantling of conservator tank and all protection relays, cable end boxes, vent pipes and other items as required. | 1 | Jobs | 35,700 ₹42,126 | 35,700 ₹42,126 |
| 1.02 | Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and reinsulation of weak point with the help of HT insulation material and proper taping etc. | 1 | Jobs | 2,55,000 ₹3,00,900 | 2,55,000 ₹3,00,900 |
| 1.03 | Replacement of top cover gasket vertical vent gasket & missing hardware to stop the oil leakage. | 1 | Jobs | 59,700 ₹70,446 | 59,500 ₹70,210 |
| 1.04 | Replacement of HV bushing with the help of skilled and trained labor with all tools and tackles etc as per site requirement. | 1 | Set | 65,700 ₹77,526 | 65,500 ₹77,290 |
| 1.05 | Replacement of silica gel. | 1 | Jobs | 8,500 ₹10,030 | 8,500 ₹10,030 |
| 1.06 | Checking & matching of control wiring of all protection relays and calibration of buchholz relay and protection relays testing the same. | 1 | Jobs | 44,500 ₹52,510 | 43,500 ₹51,330 |
| 1.07 | Complete assembling of transformer cleaning of complete transformer tightening of all connections of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides HI pot machine. | 1 | Jobs | 95,000 ₹1,12,100 | 95,000 ₹1,12,100 |
| 1.08 | Replacement of transformer oil to up to top up level as required., Make - Transpower | 1,260 | Ltr. | 1,71,864 ₹2,02,799.52 | 1,71,738 ₹2,02,650.84 |
| 1.09 | Repair of cooling fins for stopping the leakage. | 4 | Jobs | 55,000 ₹64,900 | 55,000 ₹64,900 |
| 1.10 | Dehydration & filtration of complete transformer oil and checking the die electric strength up to 50 KV at site. | 1 | Jobs | 55,800 ₹65,844 | 55,600 ₹65,608 |
Tender Value
Refer Docs
EMD Value
₹20,900
Closing Date
12 Mar 2026, 3:30 pmClosed
EE(EnM)M-12
D-Block Saket
Repairing - Overhauling - Servicing of Voltamp Make Transformer No. 1 installed at ESI BPS under Tughlakabad Constituency AC-52. (Re-Invite)
2026_DJB_288208_6
NIT No. 36/EE(EnM)M-12/2025-26
Open Tender
Miscellaneous Works
30 days
EE(EnM)M-12
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
EE(EnM)WSS-II
₹20,900
20 Mar 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
Disconnecting of HT supply from main panel after switching off 11 KV VCB discharging the supply. Complete drain out of transformer oil from transformer into empty oil drum by oil machine, dismantling of conservator tank and all protection relays, cable end boxes, vent pipes and other items as required.
Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and reinsulation of weak point with the help of HT insulation material and proper taping etc.
Replacement of top cover gasket vertical vent gasket & missing hardware to stop the oil leakage.
Replacement of HV bushing with the help of skilled and trained labor with all tools and tackles etc as per site requirement.
Replacement of silica gel.
Checking & matching of control wiring of all protection relays and calibration of buchholz relay and protection relays testing the same.
Complete assembling of transformer cleaning of complete transformer tightening of all connections of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides HI pot machine.
Replacement of transformer oil to up to top up level as required., Make - Transpower
Repair of cooling fins for stopping the leakage.
Dehydration & filtration of complete transformer oil and checking the die electric strength up to 50 KV at site.
Complete cleaning and chemically washing of oily and muddy transformer body and painting of transformer with enamel paint.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_382155.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid