Loading…
Loading…
Tender Value
₹42.8 L
EMD Value
₹85,700
Closing Date
18 May 2026, 10:30 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Revenue
HQ
6 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
As per Part I Offer Letter, Part II General Instructions to tenderer and Tender Conditions & Annexures-Attached
Need Based Maintenance of Secondary Fume Extraction System and PC Bay Wheel Cutting Machines.
RWF-EL-OT-WSC-2026-27-4
RWF-EL-OT-WSC-2026-27-4
Open
Works - General
24 Months
Bengaluru Urban, Karnataka
₹0
₹85,700
18 May 2026
25 Apr 2026
4 May 2026
42 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 27,21,618.08 | ||
| — | 1.00 | — | — | ||
| ID fan motor replacement. 1. Shifting of good motor from EMMS to wheel shop. 2. Dismantling of coupling foundation of defective motor. 3. Releasing and lowering of Defective motor. 4. Raising and replacing of Good motor to fume plant. 5. Checking tightness of foundation bolts and alignment motor properly according the requirement for proper working. 6. Welding has to be done wherever required. 7. Shifting of released defective motor from wheel shop to EMMS. | — | — | — | 45,184.56 | |
| — | 1.00 | — | — | ||
| Compressor motor replacement. 1. Shifting of good motor from EMMS to wheel shop. 2. Dismantling of coupling foundation of defective motor. 3. Releasing and lowering of defective motor from fume motor. 4. Raising and replacing of good motor. 5. Fixing coupling joint, motor alignment etc. under the guidance of mechanical staff. 6. Checking tightness of foundation bolts and alignment motor properly according to the requirement for proper working. 7. Welding has to be done wherever required. 8. Shifting of released defective motor from wheel shop to EMMS | — | — | — | 30,123.04 | |
| — | 104.00 | — | — | ||
| Visual inspection & cleaning 1. Compressor motor. 2. ID fan motor. 3. MCC panel. 4. Drive panels of ID fan motors . 5. 2000KVA transformer. 6. VCB panels. 7. ACB panels. 8. PLC panel. 9. Drive panels of compressor motors. 10. Screw conveyor motors. 11. Rotary feeder motors. 12. Pulsing System. 13. Air Conditioners. Note: Any breakdown in SFES in the week contractor must deploy staffs for attention. | — | — | — | 15,85,296.96 | |
| — | 8.00 | — | — | ||
| MCC panel. 1. Cleaning of panel. 2. Tightening of fasteners. 3. Checking & tightening of all control wiring & power wiring. 4. Checking of push buttons, relays, contactors, MCB's & MPCB's | — | — | — | 37,911.04 | |
| — | 8.00 | — | — | ||
| Drives of compressor and ID fan motors 1. Cleaning of panel. 2. Tightening of fasteners. 3. Checking of control wiring & power wiring. 4. Checking of push buttons. | — | — | — | 48,247.84 | |
| — | 2.00 | — | — | ||
| 2000 KVA Transformers. 1. Clean the terminal bushings & check for any crack. 2. Check the dielectric strength of transformer oil (BDV). If value below 30KV, filtration of oil to be carried out for improving the transformer oil BDV value. 3. Check the transformer oil level in the conservator tank; fill up to the required level with filtered oil. 4. Check the condition of silica gel is dehydrating breather, if color is not dark blue dehydrates or replace silica gel. 5. Replace the oil in the breather cup. 6 . Clean the air passage. 7. Check the insulation resistance value of the transformer winding. | — | — | — | 1,51,719.68 | |
| — | 4.00 | — | — | ||
| — | 4.00 | — | — | ||
| — | 8.00 | — | — | ||
| — | 8.00 | — | — | ||
| — | — | — | 1,82,918.88 | ||
| — | 8.00 | — | — | ||
| — | — | — | 60,972.96 | ||
| — | 8.00 | — | — | ||
| Damper motors 1. Cleaning of motors of motors. 2. Checking of damper open /close limit switch. 3. Checking of motor mounting & terminal connections. | — | — | — | 1,82,918.88 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
PartIOfferletter.pdf
ATTACHMENT
PartIIInstructionstoTenderers.pdf
ATTACHMENT
PartIIISpecialconditions.pdf
ATTACHMENT
PartIVPricesandpayments.pdf
ATTACHMENT
PartVIAnnexures.pdf
ATTACHMENT
PartVIINITfore-tender.pdf
ATTACHMENT
Part VIII GCC doc
ATTACHMENT
PartVBreakupofratesandschedule_1.pdf Part V Breakup of rates and schedul
ATTACHMENT
GCC_April-2022_merged_compressed.pdf
ATTACHMENT
PartVBreakupofratesandschedule_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .