Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹1.9 L+₹3,922 (2.07%)Rejected-Finance | L2 | Rejected-Finance HIGH |
| Sl No | Description | Qty | Unit | R. Elumalai L1 | SAI SURYAA CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Repair of Potholes for Perumbulimedu Road KM 0/0 - 1/807 (R-61) | |||||
| 1.01 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 600 | Sqm | 6 ₹3,600 Lowest | 6.5 ₹3,900 |
| 1.02 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 135 | Cum | 140 ₹18,900 Lowest | 141 ₹19,035 |
| 1.03 | Collection and supply of Gritty gravel for side berms and labour charges for filling etc complete | 18 | Cum | 344 ₹6,192 Lowest | 344 ₹6,192 Lowest |
| 1.04 | Applying Tack coat over BT surface( not treated with primer) using 3Kg of bitumen emulsion for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., 0/0-1/000 | 220.31 | Sqm | 38 ₹8,371.78 Lowest | 38 ₹8,371.78 Lowest |
| 1.05 | Applying Tack coat over BT surface( not treated with primer) using 3Kg of bitumen emulsion for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., 1/0-1/807 | 164.6 | Sqm | 38 ₹6,254.8 Lowest | 38 ₹6,254.8 Lowest |
| 1.06 | BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete 0/0 - 1/000 | 5.51 | Cum | 12,200 ₹67,222 Lowest | 12,500 ₹68,875 |
| 1.07 | BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete 1/0 - 1/807 | 4.12 | Cum | 12,200 ₹50,264 Lowest | 12,500 ₹51,500 |
| 1.08 | GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 28,945 ₹28,945 Lowest | 29,543 ₹29,543 |
Tender Value
₹2.5 L
EMD Value
₹2,500
Closing Date
10 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development office(B.pt), Vembakkam
Block Development office, Vembakkam
Execution of Rural Road Maintance Scheme 2026-2027 Providing Repair of Potholes for Perumbulimedu Road R61 at Sozhavaram Panchayat in Vembakkam Block
2026_RDTN_715397_1
A11/5764/2025 Date.12.10.2026
Open Tender
Civil Works - Others
Lump-sum
Block Development office, Vembakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,500
Yes
20 Nov 2026
23 Oct 2026
10 Nov 2026
23 Oct 2026
10 Nov 2026
23 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repair of Potholes for Perumbulimedu Road KM 0/0 - 1/807 (R-61) | |||||
| 1.01 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 600 | Sqm | - | - |
| 1.02 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 135 | Cum | - | - |
| 1.03 | Collection and supply of Gritty gravel for side berms and labour charges for filling etc complete | 18 | Cum | - | - |
| 1.04 | Applying Tack coat over BT surface( not treated with primer) using 3Kg of bitumen emulsion for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., 0/0-1/000 | 220.31 | Sqm | - | - |
| 1.05 | Applying Tack coat over BT surface( not treated with primer) using 3Kg of bitumen emulsion for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., 1/0-1/807 | 164.6 | Sqm | - | - |
| 1.06 | BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete 0/0 - 1/000 | 5.51 | Cum | - | - |
| 1.07 | BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete 1/0 - 1/807 | 4.12 | Cum | - | - |
| 1.08 | GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_859343.xls
BOQ • 0.30 MB
Date.pdf
PDF • 0.72 MB
Postpone.pdf
PDF • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .