Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
18 Mar 2026, 11:00 amClosed
Executive Engineer University of Kasmir
Construction Division
Construction of Pond and Nursery Conditioning Units (50x40 ft).
2026_UDJK_305601_1
F.(E.Tend) (UCD)/KU/44/25
Open Tender
Civil Works
Percentage
7 days
Mirza Bagh
As per NIT
4 documents required · 4 mandatory
₹200
Registrar University of Kashmir
₹10,000
18 Mar 2026
7 Mar 2026
18 Mar 2026
7 Mar 2026
18 Mar 2026
7 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil | 304 | CUM | 187.3 | ₹56,939.2 |
| 2 | Extra for every additional lift of 1.5 m or part there of in excavation/banking excavated or stacked material : All kinds of soil | 152 | CUM | 89.75 | ₹13,642 |
| 3 | Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge. | 304 | CUM | 65.9 | ₹20,033.6 |
| 4 | Surface dressing of excavated slopes,trenches, sides of foundations etc and bed including leveling in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering asper the EIC directions. | 223.05 | SQM | 100 | ₹22,305 |
| 5 | Supplying and laying of stone soling hand packed tightly including ramming, watering and carriages complete. | 9.2 | CUM | 1,250 | ₹11,500 |
| 6 | Concrete work.
Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering. All work up to all levels.1:4:8 (1Cement: 4 coarse sand: 8 grade stone aggregate 40mm nominal size) Crushed | 6.91 | CUM | 5,702 | ₹39,400.82 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement all work up to all levels.
1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) Crushed | 13.82 | CUM | 7,604 | ₹1,05,087.28 |
| 8 | Steel Work
Reinforcement for RCC works including straightening, cutting, bending placing in position and binding all complete up to all floors. Thermo mechanically heated bars. | 414.6 | K.G | 138.3 | ₹57,339.18 |
| 9 | Form work.
Centering and shuttering including strutting propping etc. removal of form work in Foundation footings basis of columns etc. for mass concrete. | 18.22 | SQM | 286.35 | ₹5,217.3 |
| 10 | Brick work.
Brick work with FPS bricks of class designation 75 upt to plinth level.
In cement mortar 1cement: 6 fine sand mortar | 10.41 | CUM | 8,500 | ₹88,485 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_992451.xls
BOQ • 0.48 MB
ExtensionNoticePond.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .