MULTI VILLAGE WATER SUPPLY SCHEME TO DBKUPPE AND OTHER 19 HABITATIONS IN H.D.KOTE TALUK, MYSURU DISTRICT
RWSSD/2023-24/WS/WORK_INDENT7741/CALL-3
RWSSD/2023-24/WS/WORK_INDENT7741/CALL-3
Open
Water supply/sewage lines
Two Tender Document System(Two Cover)
RWSSD Division Office Mysuru
5 documents required · 5 mandatory
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
Satisfactorily completed as Prime Contractor at least one drinking water supply / lift irrigation project having capital cost of value not less than Rs. 4.58 Crores
Executed in any one year the following minimum quantities of work Installation of pumping machinery (VT/CP/Submersible) of at least 35 HP capacity /Water Treatment Plant of at least 0.38 MLD Capacity /Pipeline work (CI/MS/DI/ PVC/HDPE/GI) of at least 15.36 km. length /OHT/ZBR/MBR/GLSR/ reservoirs having a total 424 kL capacity (Overhead, ground level, underground sumps, and reservoirs shall be considered eligible).
The Tenderer should possess required valid electrical license and the Tenderer should have executed similar electrical works of at least Rs. 0.17 Crore in any one year in last five years.
The Tenderer should have experience of satisfactorily completing operation and maintenance of one rural multi-village drinking water supply project for a period of at least two years OR operation and maintenance of one urban drinking water supply project for a period of at least two years
The Tenderer should have experience in SCADA system.
Availability by owning/hired (50:50) key and critical equipment for this work
Tenderer who meets the above specified minimum qualifying criteria, will only be qualified, if their available Tender capacity is more than the total Tender value
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. 18.32crores)
Liquid assets and /or availability of credit facilities of no less than Rs. 2.96crores (estimated cash flow for 3 months of peak construction period)
Other Necessary Documents as per TBD (DBOT)
₹5,000
₹13.8 L
15 May 2024
15 May 2024
24 May 2024
22 May 2024
16 May 2024
Water Supply Scheme to DB Kuppe and Other 19 Habitations in H.D.Kote Taluk, Mysuru District
Approval of Detailed Scheme Report and Drawings:
Cost of production of set of documents & drawings
Total Station Survey, Soil Investigations including trial pits and SBC of Soil
First vetting of all...
Construction Documents and Drawings: Cost of production of a set of construction documents & drawings 2.1 Civil, Pipeline and Building Works 2.2 Mechanical Plants 2.3 Electrical Plants 2.4 Instrumenta...
Operation and Maintenance Manuals: Costs for the production of operation and maintenance manuals 3.1 First issue (prior to Tests on Completion) 3.2 As-built O & M Manuals
Head Works: Construction of Coffer Dam: Construction of coffer dam for intake well and connecting pipes, jack well and removing coffer dam after completion of construction of head works etc. including...
Construction of Jack Well: Construction of jack well structure cum pumping station including electrical panel room, LT room, battery / UPS room, EOT crane, SCADA control room, electrical c...
Development of Layout at Head works including Chain link fencing etc. : Providing chain link fencing, spreading of metals, equipment foundations, pedestals etc., Construction of chain link...
Raw Water Pumping Machineries: Providing, installation and commissioning of Vertical Turbine pumping machineries of suitable capacity as per design criteria including all electrical works,...
Electrical Works at Head Works including Electrical Sub Station, Electrical Express Feeder Line etc.: Providing and installation of electrical works including transformers, electrical sub ...
Raw Water Rising Main from Jack well to WTP: Raw water rising main from jack well at head works to water treatment plant including thrust blocks, air valves, sluice valves, scour valves, pressure reli...
WTP: Construction of Cascade Aerator:-Part of water treatment plant, construction of RCC cascade aerator including all necessary connections as per the requirement, construction of channel with all ne...
Construction of Clear / Pure Water Storage Tank / Sump at WTP: Construction of pure / treated water storage tank and chlorine contact tank of suitable capacity as per the requirement, valve arran...
Construction of Clear / Pure Water Pump House at WTP: Construction of pumping station (Pump house) of RCC framed structure for accommodating required pumping machineries, electrical panel room, m...
Pure Water Rising Mains: Pure water rising mains from pumping station at WTP/ MBT/ IPS to MBT/ ZBT/ IPSs/ In-village existing and proposed reservoirs etc. including thrust blocks, air valves, sluice v...
Pure Water Pumping Machineries: Providing, installation and commissioning of centrifugal pumping machineries of suitable capacity as per design criteria including all gadgets like valves, piping,...
Construction of Twin Type Staff Quarters and Associated Buildings: Construction of staff quarters for operator and watchman twin quarters 1 No. of twin quarters at WTP with all allied works inclu...
Electrical Works at WTP Premises including Electrical Sub Station, Electrical Express Feeder Line etc.:
Providing and installation of electrical works including transformers, electrical sub stat...
Layout Development and Construction of Internal Roads and Drains and Chain link fencing/ Compound Wall for WTP Premises: Development of layout for WTP and construction of approach road to WTP lay...
MBR/ ZBR: Construction of Master Balancing Reservoirs (MBRs) / Zonal Balancing Tanks (ZBTs) : Construction of Master Balancing Reservoirs (MBRs) / Zonal Balancing Tanks (ZBTs) including required pipin...
Pure Water gravity feeder mains from MBTs/ ZBTs/ IPSs to ZBTs/ Existing / Proposed OHTs / Storage Tanks at Villages / Habitations: Pure water gravity mains from MBTs/ ZBTs/ IPSs to ZBTs/ existing / pr...
Construction of Proposed/ Rehabilitation of existing OHTs / ELSRs / Storage Tanks for Villages / Habitations: New OHTs at habitations including chain link fencing with gate, etc. including ...
MONITORING AND MEASURING: Providing electro magnetic bulk flow meters with actuators at raw water pumping station, clear water pumping station, raw water rising main, clear water rising mains and inle...
OPERATION AND MAINTENANCE for First Year. Operation and maintenance of the scheme, which includes, providing technical staff, valve man, operators, and others who are required to run the system in a c...
OPERATION AND MAINTENANCE for Second Year. Operation and maintenance of the scheme, which includes, providing technical staff, valve man, operators, and others who are required to run the system in a ...
OPERATION AND MAINTENANCE for Third Year. Operation and maintenance of the scheme, which includes, providing technical staff, valve man, operators, and others who are required to run the system in a c...
OPERATION AND MAINTENANCE for Fourth Year. Operation and maintenance of the scheme, which includes, providing technical staff, valve man, operators, and others who are required to run the system in a ...
OPERATION AND MAINTENANCE for Fifth Year. Operation and maintenance of the scheme, which includes, providing technical staff, valve man, operators, and others who are required to run the system in a c...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
MVS_DBKuppe_Section-7_PartA_Final.docx
Instructions to Tenderers • 0.70 MB
MVS_DBKuppe_Section-7_PartB_Final.docx
Tender Document • 2.74 MB
02.D B KUPPE TOPO KEY MAP A2.pdf
Others - TOPO KEY MAP • 0.58 MB
HD Kote MVS Tender notification.pdf
Others - Tender notification • 1.60 MB
tender notification DB Kuppe.pdf
Others - Tender notification • 1.55 MB
DB Kuppe_MVS-DBOT-Tender-15-02-2024.docx
Tender Document • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].