Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹1.8 CrAccepted-AOC 1 NO DULIAJAN C O JAI PRAKASH YADAV PO ANANDAPARA DULIAJAN DIBRUGARH ASSAM 786692 | DIBRUGARH | ASSAM | 786692 | ₹1.8 Cr | l1 | Accepted-AOC ACCEPTED RATE OF L1 |
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
16 Feb 2021, 2:00 pmClosed
Executive Engineer Guwahati West Division Irrigati
Office of The Executive Engineer Guwahati West Division_Irrigation_Guwahati_8
Reconstruction of CC lined canal with brick soling 0.075 m thick slab of RBMC at different chainage Of Kopili FS under SOPD during the year 2020_21
2021_ID_21084_1
GWDI_W_223_e_tender_2019_410 Date_09.02_21
Open Tender
Civil Works
Item Rate
180 days
village Rani under Rani Dev. Block
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,000
₹3.9 L
Yes
26 Feb 2021
10 Feb 2021
16 Feb 2021
10 Feb 2021
16 Feb 2021
11 Feb 2021
Amount
Reconstruction of C.C Lined Canal
Labour charge for dismantling of old cc work of canal structure and carriage the spoils and depositing the same in a safe distance as directed. Carriage up to lead of 30 M and lift up to 1.5 M (For minor works )
Earthwork in filling all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 Km including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including clearing light jungies, removing trees up to 15 cm dia and uprooting roots and stumps from the seat of breaking clods not more than 10 mm cube, ramming, profilling etc. with all lift complete as directed ( Payment will be made after deduction of 12.5 % shrinkage aiiowance from the gross quantity).
Labour for preparation of subgrade of lined canal section as per design drawing and grade by ramming and rolled to level and according to the required cross section of the typical lined canal including cutting , filling the existing canal section where necessary compacting the earth in layers in not more than 15 cm thick to form a firm compacted bed & side for lining including watering to obtain required moisture content where necessary etc, complete as directed.(i) For sandy soil
Earthwork in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15 cm layers on both banks as necessary including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal free from all vegetationincluding breaking clods not than 10 mm cube, ramming, dressing and roughening the seat of the embankment with lead upto 30 M and lift upto 1.5 M, complete as directed.
Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
Centering and Shuttering including propping etc where necessary and removal forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). (B)(i) Shuttering (Beam) without prop.
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting bending cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed.
CC work in lined canal in prop 1:2:4 with river shingles of size 6 mm to 20 mm free from dust, dirt and other foreign materials conforming to IS 2116-1965 and 542-1962 as specified by the department, water used for mixing the mortar should be free from all impurities including laying the concrete over the subgrade, moistened throughly by hand placing / mechanical plcacing in canal of not more than 3 M sides with suitable joinst in between including prpviding bed sleeepers (cast in- situ or pre cast) under joints in between including providing all sealing materials as per design and drawing before laying concrete including finishing the surface smooth, clean of all impurities with curing the bed by manual labours and side by sprinkling for atleast 28 days etc, complete as directed. (Proper arrangement for obtaining clean water should be made at site).
Providing 50 mm wide expansion joints with bituminous compound mixed with coarse sand for canal work at an interval of 10 m apart including laying, fitting the compound in proper position etc. complete as directed.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .