Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹16.3 LAccepted-Finance VILL GOHPUR PATHAR P O P S GOHPUR DIST SONITPUR ASSAM | ₹16.3 L | L-1 | Accepted-Finance Financially Qualified |
| 2 | L-2₹17.1 L+₹74,799.83 (4.58%)Rejected-Finance | ₹17.1 L+₹74,799.83 (4.58%) | L-2 | Rejected-Finance Financially Dis-Qualified |
| 3 | L-3₹17.1 L+₹80,212.08 (4.91%)Rejected-Finance | ₹17.1 L+₹80,212.08 (4.91%) | L-3 | Rejected-Finance Financially Dis-Qualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically disqualified. Please refer to the Technical Evaluation Minutes |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S Metro Associates L2 | madhav borah L1 | M/S Destiny Enterprise L3 |
|---|---|---|---|---|---|---|
| 1.00 | Civil Work
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil. | 54.27 | m3 | 300 ₹16,281 | 231.66 ₹12,572.19 Lowest | 244.68 ₹13,278.78 |
| 2.00 | Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered). 2.16.1 Depth not exceeding 1.5 m | 90 | m² | 133 ₹11,970 | 106.92 ₹9,622.8 Lowest | 113.36 ₹10,202.4 |
| 3.00 | Depth exceeding 1.5 m but not exceeding 3 m | 18 | m² | 146 ₹2,628 | 117.45 ₹2,114.1 Lowest | 124.15 ₹2,234.7 |
| 4.00 | Providing soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete. Brick on flat soling. | 180.91 | m² | 450 ₹81,409.5 | 405 ₹73,268.55 Lowest | 426.5 ₹77,158.12 |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.8 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.99 | m3 | 6,326 ₹25,240.74 | 3,819.64 ₹15,240.36 Lowest | 5,396.12 ₹21,530.52 |
| 6.00 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.31 | m3 | 7,227 ₹52,829.37 | 5,965.77 ₹43,609.78 Lowest | 6,164.59 ₹45,063.15 |
| 7.00 | 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacturer's specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. | 31.91 | m2 | 856 ₹27,314.96 | 693.28 ₹22,122.56 Lowest | 730.08 ₹23,296.85 |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 35 | m² | 308 ₹10,780 | 249.44 ₹8,730.4 Lowest | 262.68 ₹9,193.8 |
| 9.00 | Suspended floors, roofs, landings, balconies and access platform | 5.51 | m2 | 500 ₹2,755 Lowest | 620.91 ₹3,421.21 | 653.87 ₹3,602.82 |
| 10.00 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 113.39 | m2 | 500 ₹56,695 | 492.76 ₹55,874.06 Lowest | 518.92 ₹58,840.34 |
Tender Value
₹20.1 L
EMD Value
₹40,194
Closing Date
25 Jun 2026, 4:30 pmClosed
Sr SP cum F and ESA
Oo the Director of Fire and Emergency Services Assam Guwahati
Construction of Assam Type Workshop for SDRF Bn at Mangaldoi F and ES Station
2026_FESA_52600_1
eCF No. 508851/17 Dated 02.06.2026
Open Tender
Civil Works - Building
Item Rate
365 days
Mangaldoi in Darang District
Please refer to the Tender Document
5 documents required · 5 mandatory
₹400
₹40,194
Yes
09.06.2025
3 Aug 2026
4 Jun 2026
25 Jun 2026
4 Jun 2026
25 Jun 2026
4 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil. | 54.27 | m3 | 100 | ₹5,427 |
| 2 | Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered). 2.16.1 Depth not exceeding 1.5 m | 90 | m² | 100 | ₹9,000 |
| 3 | Depth exceeding 1.5 m but not exceeding 3 m | 18 | m² | 100 | ₹1,800 |
| 4 | Providing soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete. Brick on flat soling. | 180.91 | m² | 100 | ₹18,091 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.8 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.99 | m3 | 100 | ₹399 |
| 6 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.31 | m3 | 10 | ₹73.1 |
| 7 | 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacturer's specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. | 31.91 | m2 | 10 | ₹319.1 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 35 | m² | - | - |
| 9 | Suspended floors, roofs, landings, balconies and access platform | 5.51 | m2 | - | - |
| 10 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 113.39 | m2 | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BidDocument.pdf
Tender Documents • 2.30 MB
FOB.pdf
Additional Documents • 0.49 MB
BOQ_83086.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .