| 1 | 1₹16.5 LAccepted-AOC | ₹16.5 L | 1 | Accepted-AOC ist lowest work allotted |
| 2 | 2₹18.0 LRejected-AOC BATHINDA | BATHINDA | PUNJAB | 151001 | ₹18.0 L | 2 | Rejected-AOC 2nd lowest |
Tender Value
₹20.8 L
EMD Value
₹41,687
Closing Date
20 Mar 2026, 2:00 pmClosed
ER ONKAR SINGH
EXECUTIVE ENGINEER PROVL DIV PWD BR BATHINDA
NEW CONSTRUCTION OF LINK ROAD FROM KOTHE KAME KE TO KOTHE ARORAYA KE
2026_CEPW_163189_1
PB/BTI/122
Open Tender
Civil Works - Roads
60 days
DISTT BATHINDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹41,687
Yes
11 May 2026
10 Mar 2026
20 Mar 2026
10 Mar 2026
20 Mar 2026
10 Mar 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: EXECUTIVE ENGINEER PROVINCIAL DIVISION, BATHINDA
NAME OF WORK:- NEW CONSTRUCTION OF LINK ROAD FROM KOTHE KAME KE TO KOTHE ARORAYA KE
Contract No: CIVIL Works
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Work Name Item Code / Make Quantity Unit Rate Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
Dismantling brick edging as per CSR 8.5 (i) 0.999 Cum Full Conversion INR
Compaction of earth work & Prepration of Sub grade including loosing,leveling ofearth 225mm thick top layer, rough dressing of soil, final dressing of earth to givelevel camber,watering,rolling with road roller,compacting the bed to achieve minimun dry density as given in Table 300-2 as per technical clause 305 of MORT&H specifications (in case of link roads earth work to be done by villagers.) as per CSR 24.4(c) sqm Full Conversion INR
Credit of materials
Bricks bats CSR 3(12d) cum Full Conversion INR
Bricks Nos. Full Conversion INR
Construction of Toe Wall 1 Ft high (Rs. 734 per mtr. for Const. of Toe Wall 1 Feet High has been allowed tentatively hut payment should be made as per actual work done at site. Before execution, Executive Engineer should ensure himself about the stability of section adopted and necessity of provision.) Mtr Full Conversion INR
Providing and laying 60 mm thick factory made cement concrete interlocking Paving blocks of M35 grade manufactured by block making machine equipped with steel mould clamped to a strong vibratory table with hydraulic pressure for compaction of concrete as per IRC SP 63 -2014 and of approved size and design / shape laid in Ordinary Grey Colour and pattern over and including 40 mm thick compacted bed of coarse sand, filling the joints with fine sand etc, all complete as per directions of Engineer-inCharge. sqm Full Conversion INR
Cement concrete 1:8:16 with stone ballast 40mm gauge stone aggregates using concrete mixer volumetric type CSR 10.6 b (ii) Cum Full Conversion INR
cultural cess Percentage Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
sbd122.pdf
Tender Documents • 21.39 MB
BOQ_330612.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid