Loading…
Loading…
Tender Value
₹3 Cr
EMD Value
₹6 L
Closing Date
29 Aug 2026, 5:00 pmDue today
Superintending Engineer, PMGSY Circle Batote
Office of the Superintending Engineer PMGSY Circle Batote PW(RANDB) Department Store, Near Fire Station, Batote, 182143
Permanent Restoration of Maroge Balihote to Adhwa Road Stage I Pkg No JK04 22 Phase V Length 24.325 Km Block and District Ramban PIU RAMBAN
2026_JKRRD_149280_1
e-NIT No PMGSY/SE/B/27 Dated 20-08-2026
Open Tender
Civil Works - Roads
Percentage
180 days
Office of the SE PMGSY Circle Batote
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹6 L
Office of the SE PMGSY Circle Batote
20 Aug 2026
20 Aug 2026
31 Aug 2026
20 Aug 2026
29 Aug 2026
21 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres. | 2,640 | Cum | 256.85 | ₹6,78,084 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 353 | Cum | 4,826.5 | ₹17,03,754.5 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 509.52 | Cum | 5,673.4 | ₹28,90,710.77 |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 428.8 | Cum | 7,504.6 | ₹32,17,972.48 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. | 666 | sqm | 286.35 | ₹1,90,709.1 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 381 | sqm | 628.95 | ₹2,39,629.95 |
| 7 | Centering and shuttering for edges of slabs above 20cm wide | 8 | sqm | 1,145.1 | ₹9,160.8 |
| 8 | Random Rubble masonry with hard stones in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) | 1,392 | Cum | 5,402.9 | ₹75,20,836.8 |
| 9 | Dry random rubble masonry with hard stone in foundation and plinth with bond stone. | 670 | Cum | 3,262.1 | ₹21,85,607 |
| 10 | Construction of crate work by way of handpacking of stones in wire crates including cost of stones & crates with 4 mm dia GI wire conforming to IS :280 and IS 4826 in 100 mm x100 mm mesh (woven Diagonally) | 907 | Cum | 1,823.46 | ₹16,53,878.22 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.89 MB
BOQ_234866.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].