Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.6 LAccepted-AOC | ₹5.6 L | 1 | Accepted-AOC WORK ORDER |
| 2 | 2₹5.7 L+₹5,284.25 (0.94%)Rejected-Finance | ₹5.7 L+₹5,284.25 (0.94%) | 2 | Rejected-Finance higest |
| Sl No | Description | Qty | Unit | M.Govindaraju L2 | OM SAKTHI CONSTRUCIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation and compacting the excavated soil in the sides of the corewall. | 9.66 | Sqm | 140 ₹1,352.4 | 131 ₹1,265.46 Lowest |
| 2.00 | Supplying and Sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 20.45 | Sqm | 1,300 ₹26,585 | 1,236 ₹25,276.2 Lowest |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 25.28 | cum | 6,300 ₹1,59,264 | 6,200 ₹1,56,736 Lowest |
| 4.00 | Supplying & Erecting centering for sides & soffits including necessary supports etc., complete complying with standard specifications and as directed by the departmental officers | 108.68 | cum | 550 ₹59,774 | 545 ₹59,230.6 Lowest |
| 5.00 | Cement concrete 1:2:4 mix Using 20mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed. | 11.11 | cum | 7,500 ₹83,325 | 7,499 ₹83,313.89 Lowest |
| 6.00 | Cement concrete 1:1.5:3 mix Using 20 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed. | 18.11 | Sqm | 8,045 ₹1,45,694.95 Lowest | 8,045 ₹1,45,694.95 Lowest |
| 7.00 | Provision for Bitumen Pad | 3.6 | Sqm | 234 ₹842.4 Lowest | 234 ₹842.4 Lowest |
| 8.00 | Provision for 110mm dia PVC Pipe | 9 | cum | 219 ₹1,971 Lowest | 219 ₹1,971 Lowest |
| 9.00 | Provision for Name board | 1 | Nos | 3,000 ₹3,000 Lowest | 3,000 ₹3,000 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | Nos | 85,679 ₹85,679 | 84,873 ₹84,873 Lowest |
Tender Value
Refer Docs
EMD Value
₹5,700
Closing Date
25 Feb 2026, 4:00 pmClosed
block development officer
panchayat union parangipettai
Providing Cement Concrete Pavement at Villiyanallur Panchayat
2026_RDTN_662064_21
AA2/0298/2026
Open Tender
Civil Works - Roads
Item Wise
panchayat union parangipettai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,700
Yes
10 Mar 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation and compacting the excavated soil in the sides of the corewall.
Supplying and Sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying & Erecting centering for sides & soffits including necessary supports etc., complete complying with standard specifications and as directed by the departmental officers
Cement concrete 1:2:4 mix Using 20mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed.
Cement concrete 1:1.5:3 mix Using 20 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed.
Provision for Bitumen Pad
Provision for 110mm dia PVC Pipe
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_794805.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
Tendernotice_2.pdf
PDF • 0.31 MB
Documents.pdf
Tender Documents • 0.29 MB
BOQ_794805.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .