| 1 | ₹1.7 LAWARDED | AWARDED |
Tender Value
₹1.7 L
EMD Value
₹4,200
Closing Date
18 Jun 2025, 11:00 pmClosed
Directorate of Municipal Administration
Construction of RCC drain From Kadappa Naik House to Shankar Kallatti house at 14 no ward Construction Cover slab on Existing drain from Hanamant Bades house to Avanna Naik house in ST area (Reserved For ST)
DMA/2025-26/OW/WORK_INDENT41369
DMA/2025-26/OW/WORK_INDENT41369
Reserved
Other Works
Electronic Documents, First(One Cover)
DMA Town Municipal Council Konnur
₹500
₹4,200
5 Jun 2025
5 Jun 2025
17 Jun 2025
Construction of RCC drain From Kadappa Naik House to Shankar Kallatti house at 14 no ward Construction Cover slab on Existing drain from Hanamant Bades house to Avanna Naik house in ST area
Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, includin...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work. KPWD Common DSR 2023-24 Volume 3 (P No: 17 I.No:3.1 )
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggr...
Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mix...
Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate Cement Concrete Drain Walls Form Works Consider 3...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 ...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .