| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.9 LAccepted-AOC LABPUR COLLEGE PARA LABPUR WEST BENGAL INDIA 731303 | LABPUR | BIRBHUM | WEST BENGAL | 731303 | ₹20.9 L | L1 | Accepted-AOC Lowest bidder. |
| 2 | L2₹21.4 LRejected-Finance LALKUTHIPARA SURI BIRBHUM 731101 | SURI | BIRBHUM | WEST BENGAL | 731101 | ₹21.4 L | L2 | Rejected-Finance Quoted higher rate than the lowest bidder. |
| 3 | L3₹21.5 LRejected-Finance AMODPUR HATTALA BIRBHUM PS SAINTHIYA BIRBHUM 731201 | SAINTHIA | BIRBHUM | WEST BENGAL | 731201 | ₹21.5 L | L3 | Rejected-Finance Quoted higher rate than the lowest bidder. |
| 4 | L4₹22.1 LRejected-Finance | ₹22.1 L | L4 | Rejected-Finance Quoted higher rate than the lowest bidder. |
Tender Value
Refer Docs
EMD Value
₹40,130
Closing Date
22 Jun 2026, 10:00 amClosed
The SE And Regional Manager
Birbhum Regional office,WBSEDCL,Suri,Birbhum.
Repair and maintenance of boundary wall including height extension with plastering, painting of existing old boundary wall, fixing of RBT concertina barbed wire with other allied civil works at Rampurhat Divisional Store premises under Rampurhat Div
2026_WBSED_1027283_1
RM/BRO/Civil/e-NIT/2026-27/02 Dtd.09.06.202605.03.2026
Open Tender
CIVIL WORKS
Percentage
60 days
Rampurhat
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹40,130
4 Aug 2026
10 Jun 2026
24 Jun 2026
10 Jun 2026
22 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil butexcluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimmingthe sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm. | 100 | Cum | 120.46 | ₹12,046 |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) With earth obtained from excavation of foundation. | 30 | Cum | 78.32 | ₹2,349.6 |
| 3 | Filling in foundation or plinth by Fine Sand in layers not exceeding 150 mm. as directed and consolidating same by thorough saturation with water ramming complete, including the cost of supply of sand. (Payment to be made on measurement of finished quantity) | 10 | Cum | 578.28 | ₹5,782.8 |
| 4 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. | 50 | Sqm | 268.66 | ₹13,433 |
| 5 | (I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (A) [Pakur Variety] 1:3:6 proportion | 5 | Cum | 4,275.33 | ₹21,376.65 |
| 6 | Ordinary Cement Concrete( mix.1:1.5:3) with graded stone chips(20 mm.nominal size) excluding shuttering and reinforcement, if any, in ground floor,as per relevant I.S.Codes,Pakur variety. | 32.8 | Cum | 5,463.74 | ₹1,79,210.67 |
| 7 | Hire and labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. (upto roof of ground floor). (b) 25 mm. to 30 mm. thick wooden shuttering without staging in foundation. | 150 | Sqm | 207.05 | ₹31,057.5 |
| 8 | (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of Engineer-in-charge. | 100 | Sqm | 331.28 | ₹33,128 |
| 9 | (c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work | 50 | Sqm | 366.63 | ₹18,331.5 |
| 10 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation, basement, and upto roof of ground floor / upto 4m. (i) Tor steel/Mild Steel . I. SAIL/TATA/RINL | 6 | MT | 61,037.33 | ₹3,66,223.98 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Tendernotice_2.pdf
PDF • 0.38 MB
BOQ_2523479.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].