Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹69.7 LAccepted-AOC 1ST 2ND FLOOR PLOT NO 13 C 13 3 RAMA ROAD SIDE INDUSTRIAL AREA NAJAFGARH ROAD DELHI 110015 INDIA | WEST | DELHI | 110015 | L-1 | Accepted-AOC L-1 Bidder | |
| 2 | L-2₹85.0 L+₹15.3 L (22.0%)Rejected-Finance | L-2 | Rejected-Finance Rejected. Other than L-1. |
| Sl No | Description | Qty | Unit | BEST INFRA L2 | Vardhman Airport Solutions Limited L1 |
|---|---|---|---|---|---|
| 1.00 | Supply, installation, commissioning and testing of AC single phase, 2 wires 10 - 60 Amps Smart Energy Meter with bi-directional communication facility & remote connect/disconnect switch including all connected accessories. The meter shall communicate with Head End System (HES) on any one of the communication technologies mentioned in IS16444 Part 1, as per the requirement of the GE 867 EWS complete all as specified against BOQ Srl Item No. 1.01 to 1.15 and as directed by GE.
NOTE : The disconnecting and taking down old electric meter any type complete with accessories including depositing to MES store by the contractor will be measured and paid separately. | 365 | EACH | 5,162 ₹18,84,130 Lowest | 6,944 ₹25,34,560 |
| 1.01BASIC FEATURES : The Smart Meter would have the following minimum basic features- Measurement of electrical energy parameters, Bidirectional Communication, Integrated Load limiting /connect/disconnect switch, Tamper event Meter End detection, recording and reporting, Power event alarms as per IS 16444 Part 1, Remote firmware upgrader, pre-paid features at MDM end (as per IS 15959 Part 2), TOD features, Net Metering (kWh) features, On demand reading. | |||||
| 1.02GENERAL STANDARDS APPLICABLE FOR METERS are IS 13779 with latest amendments AC Static Watt-hour Meter class 1 & 2, IS 15884 with latest amendments Alternating Current Direct Connected Static Prepayment Meters for Active Energy (Class 1 and 2)- Specification, IS 16444 Part 1 with latest amendments A.C. Static Direct Connected Watt Hour Smart Meter Class 1 and 2- Specification, IS 15959 Part 1 & Part 2 with latest amendments Data Exchange for Electricity Meter Reading, Tariff and Load Control Companion Standards. | |||||
| 1.03COMMUNICATION : Meter shall have the ability to communicate with Head End System (HES) on any one of the communication technologies mentioned in IS 16444 Part 1 (RF/PLC /Cellular) in a secure manner. The selection of communication technology should be as per the site conditions and as per design consideration of AMI Implementing agency to meet the performance as per agreed Service Level Agreements (SLAs). In case of Cellular based meter, the meter shall accommodate SIM card of any service provider. In case of Plug in type communication module, the meter shall log communication module removal /non responsive event with snapshot. REMOTE CONNECT/ DISCONNECT/ LOAD LIMITING : Remote Connect/ disconnect/ Load control facilities would be as per IS 16444 part 1. | |||||
| 1.04Once the design of AMI Solution is submitted by AMI implementing agency which will be vetted from any of these 5 companies which are agencies empanelled by REC (Secure Meters Limited, Genus Power infrastructure Limited, CyanConnode Holding pic Co,Landis+ Gyr Limited, Larsen & Turbo Limited and as approved by REC India / NSGM) that may be mix of all the technologies based on the geographical and network conditions in particular area and following parameters to be taken care (Quality of Service, Latency, Service Level Agreement , Total Cost of Ownership over 10 years, Initial Cost of Investment, Independent Infrastructure Augmentation, Auto-discovery and self-healing, Independent Troubleshooting, Communication success rate, Dependency on network provider, Additional network IED inclusion, Power Consumption and maintenance cost).Contractor have to bear the monthly rentals/ data charges for SIM/e-SIM using the network of Mobile service provider for every meter for 10 Years in case of cellular technology in case of meters which base on cellular technology (cost is deemed to be included in this) and in case of RF meters cost of DCU, Signal boosters including network management and head end system for the project area shall also be included in this item. | |||||
| 1.05OTHER SPECIFICATIONS : Applicable Standards The meters shall comply with IS 16444 Part 1 for all requirements. Reference Voltage As per relevant IS (240 V), Current Rating 10-60 A, Category UC1, Starting Current As per IS 16444 Part 1, Accuracy Class 1.0 as per IS 16444 Part 1 ,Limits of error As per IS 16444 Part 1 ,Operating Temperature range As per IS 16444 Part 1, Humidity ,Frequency, Influence Quantities , Power Consumption of meter ,Current and Voltage , Running at No Load ,Test output device , Meter Display ,Name Plate & marking Meter Display , Parameters to be measured As per IS 16444 Part 1 / As per IS 15959 Part-2,Maximum Demand resetting As per IS 15959 Part 2, Time of Use registers As per IS 15959 part 2 ,Power Quality Information As per IS 15959 part 2 ,LED/LCD Indicators As per IS 16444 Part 1 ,Load Survey/Interval Data As per IS 15959 part 2 ,Tamper/ Event Recording As per IS 15959 part 2, Measuring Elements As per IS 16444 part 1 Alarm As per IS 16444 Part 1/ 15959 Part 2, Load Control As per IS 16444 Part 1 ,Connect/Disconnect switch UC1( As per IS 16444 part 1) ,Status of load switch As per IS 16444 Part 1 ,Programmability As per IS 16444 Part 1 ,Communication As per IS 16444. Part 1 ,Data Exchange Protocol As per IS 16444 Part 1 ,Remote Firmware upgrade As per IS 15959 part 2, Real Time Clock (RTC) As per IS 16444 Part 1/ IS 15959 Part1 & Part 2, | |||||
| 1.06The clock day/date setting and synchronization shall only be possible through password/Key code command from one of the following: From remote server through suitable communication network. Hand Held Unit (HHU) or Meter testing work bench and this shall need password enabling for meter. Data Retention As per CEA regulations Battery Backup Meter shall be supplied with separate battery backup for RTC. Guarantee 120 months from the date of supply. (The meter which are found defective/inoperative at the time of installation or become inoperative/defective within the guarantee period, the same shall be replaced/repaired by the manufacturer/supplier within one month of receipt of report. It should be replaced within one month of receipt of report for such defective/inoperative meters First Breath(power on) and Last gasp (power off) condition detection and communication to HES As per IS 16444 Part 1 .Plug-in Communication Module The Smart Meters shall be have a dedicated sealable slot for accommodating plug-in type bi - directional communication module which shall integrate the respective communication technology (RF/PLC/ Cellular) with the smart meters, leading to easy adaptability for network interfaces (WAN/NAN).The Plug-In module shall be field swappable/ replaceable. | |||||
| 1.07DATA DISPLAY FACILITY (AUTO) Data Display shall be in two modes 1. Auto Scroll 2. Scroll with Push Button The display parameters shall be: Display Check, Date and Time, Last Recharge Amount, Last Recharge Time, Current Available Balance Amount, Current Balance Time ,Cumulative Active Energy kWh with legend, Current calendar month MD in kW with legend, Instantaneous voltage, Instantaneous Phase current, Instantaneous Load kW,Instantaneous average Power Factor. These parameters should be displayed on the Meter Display continuously for a period of 10 seconds on Auto scroll. | |||||
| 1.08Scroll with push button : All Parameters mentioned under Auto-Scroll mode should be displayed. Additionally, the following Parameters shall also be displayed:- Internal diagnostics (display check), Meter Serial No., Last month cumulative kWh with legends, Last month MD in kW with legends, Current month Average Power Factor, Last month Average Power Factor. Further, the Meter should display High Resolution energy values with resolution of 3 digits before decimal and 2 digits after decimal in push button mode. The meter’s display should return to default display mode (continues auto scroll) if push button is not operated for more than 10 seconds. Meter display should not go in to sleep mode during Power-On condition, Last token recharge. | |||||
| 1.09ANTI TAMPER FEATURES The meter shall continue recording energy under tamper conditions as defined in IS 15959 Part 2 and would log the event and send alarm at Head End System after detection of the defined theft features as per IS 15959 Part 2. TESTS : Type Tests & Test Certificates Smart meter shall be type tested for all the tests as per IS: 16444 Part 1 (latest version) in a third party independent lab. The number of sampling for testing of meters and criteria for conformity would be as per IS 16444 Part 1 (as amended up to date). Necessary copies of test certificates shall be submitted. Routine & Acceptance Tests : The Factory Acceptance and Routine tests shall be carried out as per IS 16444 Part 1. The Meter (without communication module) shall be immune under external magnetic influences and shall be tested for high voltage discharge as per CBIP 325. | |||||
Tender Value
₹1.1 Cr
EMD Value
₹1.9 L
Closing Date
14 Aug 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE SILIGURI ZONE
HQ CE SILIGURI ZONE, MES, SEVOKE ROAD, PO SALUGARA, DIST JALPAIGURI, PIN 734 008 (WB)
PROVN OF SMART METER WITH PRE-PAYMENT MODE AT KALIMPONG MIL STATION UNDER GE 867 EWS
2025_MES_718825_1
98812/KPG/SZ/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
KALIMPONG
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
GE 867 EWS
₹1.9 L
Yes
7 Nov 2025
5 Jul 2025
21 Aug 2025
5 Jul 2025
14 Aug 2025
26 Jul 2025
5 Jul 2025 - 12 Jul 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .