Loading…
Loading…
Tender ID
Tender Value
₹8.2 Cr
EMD Value
₹16.3 L
Closing Date
4 May 2026, 6:00 pmClosed
ACE PWD Zone Ajmer
ACE PWD Zone Ajmer
WIDENING AND STRENGTHENING WORK ON SABALPURA TO MANGROP WITH MANGROP BYPASS
2026_CEPWD_551180_1
NIT-03/2026-27 PWD ZONE AJMER
Open Tender
Civil Works
Percentage
300 days
Mandalgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Egrass Challan Deposit
₹16.3 L
Yes
18 Apr 2026
10 Apr 2026
6 May 2026
10 Apr 2026
4 May 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1(A) Road Work Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle | |||||
| 2Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | |||||
| 3Compacting original ground supporting embankment Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300-1 and 300-2 for embankment construction as per MoRTH Specification Clause 305.3.4 | |||||
| 4Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | |||||
| 5Carriage of Earth, Sand, Lime, Morrum manure or sludge with 1 km lead | |||||
| 6Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per MoRTH Specification Clause 301.3.5 Mechanical Means | |||||
| 7Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means Bituminous Courses & Granular Courses | |||||
| 8Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material | |||||
| 9Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. For Grading-I Material | |||||
| 10WBM Grading 1 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening & binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 1 as per MoRTH Specification Clause 404. Using Crusher Broken Aggregate | |||||
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.16 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.03 MB
01-Bid-Sabalpura.pdf
Tender Documents • 0.27 MB
BOQ_982219.xls
BOQ • 0.37 MB
Agrimenconditionall.pdf
Tender Documents • 22.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .