| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical 270 D 3RD FLOOR RABINDRA SARANI BURRABAZAR KOLKATA WEST BENGAL 700007 | KOLKATA | WEST BENGAL | 700007 | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹20,548
Closing Date
8 Jun 2026, 2:30 pmClosed
SENIOR SUPERINTENDING ENGINEER
OFFICE OF THE SENIOR SUPERINTENDING ENGINEER (P.W.Dte) South-Western Electrical Circle PWD Compound,Midnapore,Paschim Medinipur
Proposed Construction of 2 Pump Fire station G plus 1 storied building with G plus III storied foundation at Gopiballavpur in the district of Jhargram--SITC of Solar System
2026_WBPWD_5014023_1
WBPWD/SSE/SWEC/NIQ04/2026-27
Open Tender
ELECTRICAL WORKS ORG
Item Rate
45 days
JHARGRAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,548
OFFICE OF THE SENIOR SUPERINTENDING ENGINEER
3 Jun 2026
13 May 2026
10 Jun 2026
13 May 2026
8 Jun 2026
16 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, Installation, Testing & Commissioning of
10 KWp Mono Solar PV Modules in
535Wp or above per module, As per latest MNRE
Specifications
1. IEC:61215/IS: 14286 Crystalline silicon
terrestrial photovoltaic modules –
Design qualification and type approval.
2. IEC: 61730 – Part 1 Photovoltaic (PV)
module safety qualification –
Requirements for construction.
3. IEC: 61730 – Part 2 Photovoltaic (PV)
module safety qualification –
Requirements for testing.
4. IEC: 61701/IS: 61701 Salt Mist
Corrosion Testing of the module.
5. IEC: 62804 :Test method for detection
of Potential Induced Degradation of
photovoltaic (PV) modules
[Tata Power/Panasonic/Lubi/Kirloskor] | 19 | nos | - | - |
| 2 | Supply, Installation, Testing & Commissioning of 10 Kw or as per manufacturer standard 3Phase Grid Tied Inverter (3Phase) with 10 years warranty.[Tata Power/Panasonic/Lubi/Kirloskor] | 1 | Job | - | - |
| 3 | Supply, Installation, Testing & Commissioning of Solar Hot Dip GI Mounting Structure, as per the IS Specifications Designing of Module Mounting Structure (MMS): During Structural design following points must be include but not limited to the following: a. Theremust be sufficient gaps between the rows of the panels and all precautions to be taken to avoid any shading on the panels. Minimum 500mm clearance should be maintained in between roof and module. b. The module alignment and tilt angle shall be calculated to provide the maximum annual energy output. This shall be decided based on the location of array installation. c. The structure shall be designed toallow easy replacement of any module and shall be in line with site requirement. d. The mounting structure shall be designed for simple mechanical and electrical installation. It shall support SPV modules at a given orientation, absorb and transfer the mechanical loads to the base properly. e. The mounting steel structure shall be as per latest BIS 2062 (amended up to\ date). f. The array structure shall be so designed that it will occupy minimum space without sacrificing the output from SPV panels at the same time. g. All fasteners, nuts, bolts shall be of stainless steel of grade SS 304. h. The support structure & foundation shall be so designed to withstand wind load of the location as given in relevant Indian code for wind (IS 875 Part III, latest edition). i. IS 800-2007 shall be followed for structural design. Accordingly STAAD output of the design is to be submitted. j. Galvanization of the structural members shall conform to IS: 4759. The quality of zinc shall conform to IS: 209 and IS: 2629. All galvanized materials shall withstand tests as per IS: 2633. Arrangement of testing shall be made by the contractor. | 0.5 | Ton | - | - |
| 4 | Supply, Installation , Testing& Commissioning of Cu bonded Earthing Rod of
3Mtr / 17.6mm dia | 3 | nos | - | - |
| 5 | Supply, Installation , Testing& Commissioning Cu Spike Type Lightening Arrestor | 1 | pc | - | - |
| 6 | Suppl, Installation ,Testing& Commissioning of 4Sqmm Solar LSZH Cu
Tinned DC Cable (Type I) 36amps
[Polycab/RR Kable/Gloster/Havells] | 120 | mtr | - | - |
| 7 | Supply, Installation , Testing& Commissioning of 10 sqmm Cu Flex Cable
[Polycab/RR Kable/Gloster/Havells] | 10 | mtr | - | - |
| 8 | Supply, Installation, Testing & Commissioning of 35 sqmm 4C Al arrmourd Cable
[Polycab/RR Kable/Gloster/Havells] | 30 | mtr | - | - |
| 9 | Supply, Installation , Testing& Commissioning GI Strip 25X3 for Earthing | 120 | Mtr. | - | - |
| 10 | Supply, Installation , Testing& Commissioning Array Junction Box
[Tata Power/Panasonic/Lubi/Kirloskor] | 1 | set | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 1.90 MB
BOQ_5081942.xls
BOQ • 0.37 MB
datecorrigendum1.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .