| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance | -39.02% | ₹2.5 L | L1 | Admitted-Finance |
| 2 | L2₹2.5 LAdmitted-Finance | -38.78% | ₹2.5 L | L2 | Admitted-Finance |
| 3 | L3₹3.0 LAdmitted-Finance | -28.20% | ₹3.0 L | L3 | Admitted-Finance |
Tender Value
₹4.2 L
EMD Value
₹8,320
Closing Date
19 Aug 2026, 6:00 pmClosed
Executive Engineer, REW, Jammu
Office of the Executive Engineer, REW Jammu
Construction of lane alied works of Mohalla Goga Ram, jagan Nath, Thoru Ram and others ward no.6 In Panchayat Serh, Block Khour Under The Scheme, Ssy For The Year 2026-27
2026_RDPR_319491_2
e-NIT No. 395 REWJ of 2026-27 dated 04-08-2026
Open Tender
Civil Works
Percentage
Executive Engieer, REW Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹8,320
25 Aug 2026
5 Aug 2026
20 Aug 2026
5 Aug 2026
19 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix) | 2.61 | CUM | 1,725.2 | ₹4,502.77 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:ALL KINDS OF SOIL | 8.03 | CUM | 479.3 | ₹3,848.78 |
| 3 | P/L CEMENT CONCRETE OF 1 5 10 MIX EXCL THE COST OF CENTERING AND SHUTTERING ALL COMPLETE WITH 40MM NOMINAL AGGREGATES | 14.13 | CUM | 4,826.5 | ₹68,204.48 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 MIX with 20mm nominal aggregates all complete. | 14.63 | CUM | 5,733.6 | ₹83,882.57 |
| 5 | Providing and laying in reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1.5:3 MIX with 20mm nominal aggregates all complete. | 0.63 | CUM | 7,780.4 | ₹4,901.65 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Cold twisted bars | 56.7 | KG | 123.2 | ₹6,985.44 |
| 7 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20 mm nominal size stone aggregate. | 13.05 | SQM | 510.25 | ₹6,658.76 |
| 8 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 226.1 | SQM | 816.15 | ₹1,84,531.51 |
| 9 | CENTERING AND SHUTTERING INL PROPPING , REMOVAL OF FORMWORK. | 84.45 | SQM | 286.35 | ₹24,182.26 |
| 10 | SUSPENDED FLOOR | 1 | SQM | 718.2 | ₹717.48 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_1058539.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].