| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.1 LAdmitted-Finance | -16.00% | ₹15.1 L | L1 | Admitted-Finance |
| 2 | L2₹15.2 L+₹8,648.54 (0.57%)Admitted-Finance | -15.52% | ₹15.2 L+₹8,648.54 (0.57%) | L2 | Admitted-Finance |
| 3 | L3₹15.7 L+₹51,891.22 (3.43%)Admitted-Finance | -13.12% | ₹15.7 L+₹51,891.22 (3.43%) | L3 | Admitted-Finance |
| 4 | L4₹16.0 L+₹88,106.96 (5.82%)Admitted-Finance | -11.11% | ₹16.0 L+₹88,106.96 (5.82%) | L4 | Admitted-Finance |
| 5 | L5₹16.9 L+₹1.8 L (11.8%)Admitted-Finance | -6.11% | ₹16.9 L+₹1.8 L (11.8%) | L5 | Admitted-Finance |
Tender Value
₹18.0 L
EMD Value
₹18,100
Closing Date
17 Jun 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER (CIVIL)
SUPERINTENDING ENGINEER (CIVIL), GZB
Renovation of meeting hall for conducting meetings of higher officials, roof treatment of office building and other civil works for the office of EE (Comm.) and EE (Tech) at 33/11 KV Sub Station Nahid Cinema Rampur Distt Rampur.
2026_PVVNL_1152197_1
58/ECDC/GZB/2026-27
Open Tender
Civil Works
Percentage
120 days
RAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
PLEASE GO TO THE TENDER NOTICE
₹18,100
17 Jul 2026
23 May 2026
18 Jun 2026
23 May 2026
17 Jun 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kind of soil DSR Code No. 2.8.1 | 5 | Cum | 189.53 | ₹947.65 |
| 2 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. DSR Code No. 2.25(a) | 15 | Cum | 510.05 | ₹7,650.75 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. DSR Code No. 2.27 | 5 | Cum | 1,546.37 | ₹7,731.85 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 Cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources). DSR Code No. 4.1.10 | 2 | Cum | 4,746.39 | ₹9,492.78 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement:1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR Code No. 4.1.2 | 1 | Cum | 6,073.23 | ₹6,073.23 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). DSR Code No. 4.1.3 | 1 | Cum | 5,736.58 | ₹5,736.58 |
| 7 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:1½:3 (1 cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR Code No. 4.2.2 | 1 | Cum | 7,541.65 | ₹7,541.65 |
| 8 | Providing and fixing up to floor five level precast cement concrete string or lacing courses, copings, bed plates, anchor blocks, plain window sills, shelves, louvers, steps, stair cases, etc., including hoisting and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), cost of required Centering complete. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20mm nominal size derived from natural sources) DSR Code No. 4.5.1 | 1 | Cum | 7,357.83 | ₹7,357.83 |
| 9 | Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer's specification. DSR Code No. 4.12 | 250 | per bag of 50kg cement used | 13.22 | ₹3,305 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR Code No. 5.1.2 | 2 | cum | 6,586.49 | ₹13,172.98 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.54 MB
BOQ_2158414.xls
BOQ • 0.36 MB
58Index.pdf
Additional Documents • 0.37 MB
SATANDEREDTENDERDOCUMENT.pdf
Tender Documents • 0.61 MB
03TO65PQC.pdf
Additional Documents • 3.94 MB
DATEEXTEND15TO58.pdf
PDF • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .