| 1.00 | Earthwork in excavation for foundation of structures as per drawings and technical specifications , including setting out, construction of shoring and bracing, including dewatering and using machinery, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
I) In Ordinary Soil
B. Mechanical means.
ii) Depth up to 3.00 m (with dewatering)
i) Br.No. 2/1 on Solichuk to Terichuk | 275.07 | Cum | 100 ₹27,507 Lowest |
| 2.00 | Earthwork in excavation for foundation of structures as per drawings and technical specifications , including setting out, construction of shoring and bracing, including dewatering and using machinery, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
I) In Ordinary Soil
B. Mechanical means.
ii) Depth up to 3.00 m (with dewatering)
ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk | 275.07 | Cum | 100 ₹27,507 Lowest |
| 3.00 | Bored cast-in-situ M 35 grade RCC pile excluding reinforcement complete as per drawing and Technical Specifications and removal of excavated earth with all lead and lift up to 1000 m.
Pile diameter = 1200 mm
i) Br.No. 2/1 on Solichuk to Terichuk | 240 | Metre | 10,500 ₹25,20,000 Lowest |
| 4.00 | Bored cast-in-situ M 35 grade RCC pile excluding reinforcement complete as per drawing and Technical Specifications and removal of excavated earth with all lead and lift up to 1000 m.
Pile diameter = 1200 mm
ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk | 240 | Metre | 10,500 ₹25,20,000 Lowest |
| 5.00 | Pile load test on single vertical pile in accordance with I.S. 2911 (Part IV)as per technical specifications.
a) Initial load test (Safe load = 160 t
i) Br.No. 2/1 on Solichuk to Terichuk | 240 | MT | 300 ₹72,000 Lowest |
| 6.00 | Pile load test on single vertical pile in accordance with I.S. 2911 (Part IV)as per technical specifications.
b) Routine Load Test of 2x160x2.50 2 Nos. test for piles upto 50 Nos.
i) Br.No. 2/1 on Solichuk to Terichuk | 400 | MT | 300 ₹1,20,000 Lowest |
| 7.00 | Pile load test on single vertical pile in accordance with I.S. 2911 (Part IV)as per technical specifications.
a) Initial load test (Safe load = 160 t
ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk | 240 | MT | 300 ₹72,000 Lowest |
| 8.00 | Pile load test on single vertical pile in accordance with I.S. 2911 (Part IV)as per technical specifications.
b) Routine Load Test of 2x160x2.50 2 Nos. test for piles upto 50 Nos.
ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk | 400 | MT | 300 ₹1,20,000 Lowest |
| 9.00 | Pile integrity test of piles by using pile driving analyser or equivalent as approved by the E-IN-C and detail specification . Test to be carried out by an approved reputed agency including all incidental works.
i) Br.No. 2/1 on Solichuk to Terichuk | 8 | each | 10,000 ₹80,000 Lowest |
| 10.00 | Pile integrity test of piles by using pile driving analyser or equivalent as approved by the E-IN-C and detail specification . Test to be carried out by an approved reputed agency including all incidental works.
ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk | 8 | each | 10,000 ₹80,000 Lowest |
Tender Value
₹4.7 Cr
EMD Value
₹9.4 L
Closing Date
17 Apr 2024, 2:00 pmClosed
Chief Engineer, PWRD, Assam
O/o the Chief Engineer, PWRD, Assam, Fatasil Ambari, Guwahati-25
CE/EAP/ARRBP/OCB/Bridges-2/Lakhimpur/16 Construction of Bridges in Lakhimpur district i.Br. No. 2/1 on Solichuk to Terichuk ii.Br. No. 1/1 on Dhakuakhana to Charaiburha Chuk
2024_PWRDW_37049_9
No CEEAPARRBP01TENDERS2024/9
Open Tender
Civil Works
Item Rate
720 days
Lakhimpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,000
₹9.4 L
Yes
O/o the Chief Engineer, PWRD, Assam
10 Jun 2024
8 Mar 2024
17 Apr 2024
8 Mar 2024
17 Apr 2024
8 Mar 2024
8 Mar 2024 - 14 Mar 2024
14 Mar 2024
Amount
Earthwork in excavation for foundation of structures as per drawings and technical specifications , including setting out, construction of shoring and bracing, including dewatering and using machinery, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. I) In Ordinary Soil B. Mechanical means. ii) Depth up to 3.00 m (with dewatering) i) Br.No. 2/1 on Solichuk to Terichuk
Earthwork in excavation for foundation of structures as per drawings and technical specifications , including setting out, construction of shoring and bracing, including dewatering and using machinery, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. I) In Ordinary Soil B. Mechanical means. ii) Depth up to 3.00 m (with dewatering) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Bored cast-in-situ M 35 grade RCC pile excluding reinforcement complete as per drawing and Technical Specifications and removal of excavated earth with all lead and lift up to 1000 m. Pile diameter = 1200 mm i) Br.No. 2/1 on Solichuk to Terichuk
Bored cast-in-situ M 35 grade RCC pile excluding reinforcement complete as per drawing and Technical Specifications and removal of excavated earth with all lead and lift up to 1000 m. Pile diameter = 1200 mm ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Pile load test on single vertical pile in accordance with I.S. 2911 (Part IV)as per technical specifications. a) Initial load test (Safe load = 160 t i) Br.No. 2/1 on Solichuk to Terichuk
Pile load test on single vertical pile in accordance with I.S. 2911 (Part IV)as per technical specifications. b) Routine Load Test of 2x160x2.50 2 Nos. test for piles upto 50 Nos. i) Br.No. 2/1 on Solichuk to Terichuk
Pile load test on single vertical pile in accordance with I.S. 2911 (Part IV)as per technical specifications. a) Initial load test (Safe load = 160 t ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Pile load test on single vertical pile in accordance with I.S. 2911 (Part IV)as per technical specifications. b) Routine Load Test of 2x160x2.50 2 Nos. test for piles upto 50 Nos. ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Pile integrity test of piles by using pile driving analyser or equivalent as approved by the E-IN-C and detail specification . Test to be carried out by an approved reputed agency including all incidental works. i) Br.No. 2/1 on Solichuk to Terichuk
Pile integrity test of piles by using pile driving analyser or equivalent as approved by the E-IN-C and detail specification . Test to be carried out by an approved reputed agency including all incidental works. ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Cement concrete for reinforcement concrete in pile cap complete as per drawing and technical specifications. D. RCC grade M - 35 i) Using concrete mixer i) Br.No. 2/1 on Solichuk to Terichuk
Cement concrete for reinforcement concrete in pile cap complete as per drawing and technical specifications. D. RCC grade M - 35 i) Using concrete mixer ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Levelling course for Pile cap Providing and lying of PCC M - 15 levelling course 100 mm thick below the pile cap. as per drawing and technical specifications. i) Br.No. 2/1 on Solichuk to Terichuk
Levelling course for Pile cap Providing and lying of PCC M - 15 levelling course 100 mm thick below the pile cap. as per drawing and technical specifications. ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Supplying, fitting and placing uncoated TMT Bar reinforcement in foundation complete as per drawing and Technical Specifications. (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br.No. 2/1 on Solichuk to Terichuk
Supplying, fitting and placing uncoated TMT Bar reinforcement in foundation complete as per drawing and Technical Specifications. (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specifications. (N) Without plasticiser H) a) RCC Grade M 35 a) Height up to 5.0 m Case-I : Using Concrete Mixer i) Br.No. 2/1 on Solichuk to Terichuk
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specifications. (N) Without plasticiser H) a) RCC Grade M 35 a) Height up to 5.0 m Case-I : Using Concrete Mixer ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Supplying, fitting and placing TMT bars reinforcement in substructure complete as per drawing and Technical Specifications. b) (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br.No. 2/1 on Solichuk to Terichuk
Supplying, fitting and placing TMT bars reinforcement in substructure complete as per drawing and Technical Specifications. b) (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. i) Br.No. 2/1 on Solichuk to Terichuk
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification i) Br.No. 2/1 on Solichuk to Terichuk
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. i) Br.No. 2/1 on Solichuk to Terichuk
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainlesssteel matting surfaces, complete assembly to be of cast steel/fabricated structural steel, meatal and elastomer elements to be as per IRC:83 part-I &II respectively and parts conforming to BS:5400, complete as per drawing and approved technical specification. i) Br.No. 2/1 on Solichuk to Terichuk
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainlesssteel matting surfaces, complete assembly to be of cast steel/fabricated structural steel, meatal and elastomer elements to be as per IRC:83 part-I &II respectively and parts conforming to BS:5400, complete as per drawing and approved technical specification. ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. (N) Without Plasticiser D. RCC/ PSC grade M - 35 Case I : Using concrete mixer For T beam and slab, 1) Height up to 5.0 m i) Br.No. 2/1 on Solichuk to Terichuk
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. (N) Without Plasticiser E. RCC Grade M-40, For T beam and slab 1) Height up to 5.0 m i) Br.No. 2/1 on Solichuk to Terichuk
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. (N) Without Plasticiser D. RCC/ PSC grade M - 35 Case I : Using concrete mixer For T beam and slab, 1) Height up to 5.0 m ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Furnishing and placing reinforcement / prestressed cement concrete in super structure as per drawing and technical specifications. (N) Without Plasticiser E. RCC Grade M-40, For T beam and slab 1) Height up to 5.0 m ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Supplying , fitting and placing TMT bar reinforcement complete as per drawing and technical specifications. (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br.No. 2/1 on Solichuk to Terichuk
Supplying , fitting and placing TMT bar reinforcement complete as per drawing and technical specifications. (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications i) Br.No. 2/1 on Solichuk to Terichuk
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Providing Drainage Spouts complete as per approved drawing and technical specifications. i) Br.No. 2/1 on Solichuk to Terichuk
Providing Drainage Spouts complete as per approved drawing and technical specifications. ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification i) Br.No. 2/1 on Solichuk to Terichuk
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification (a) TMT Corrosion Resistant Steel (CRS) reinforcement bar of Fe-500 N/mm2 i) Br.No. 2/1 on Solichuk to Terichuk
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification (a) TMT Corrosion Resistant Steel (CRS) reinforcement bar of Fe-500 N/mm2 ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Providing Strip Seal Expansion Joint to cater movement of +70mm as per drawing. i) Br.No. 2/1 on Solichuk to Terichuk
Providing Strip Seal Expansion Joint to cater movement of +70mm as per drawing. ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Non-Destructive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format, complete as directed by the department i) Br.No. 2/1 on Solichuk to Terichuk
Non-Destructive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format, complete as directed by the department ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Non-destructive testing with rebound hammer for detection of damage zones in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format i) Br.No. 2/1 on Solichuk to Terichuk
Non-destructive testing with rebound hammer for detection of damage zones in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications. i) Br.No. 2/1 on Solichuk to Terichuk
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications. ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications. i) Br.No. 2/1 on Solichuk to Terichuk
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications. Stone/Boulder ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications. i) Br.No. 2/1 on Solichuk to Terichuk
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications. ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Earthwork in excavation for foundation of structures as per drawings and technical specifications , including setting out, construction of shoring and bracing, including dewatering and using machinery, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material . I) In Ordinary Soil B. Mechanical means. i) Depth up to 3.00 m (with dewatering) i) Br.No. 2/1 on Solichuk to Terichuk
Earthwork in excavation for foundation of structures as per drawings and technical specifications , including setting out, construction of shoring and bracing, including dewatering and using machinery, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material . I) In Ordinary Soil B. Mechanical means. i) Depth up to 3.00 m (with dewatering) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. I. Without plasticiser A. PCC Grade M15 i) Br.No. 2/1 on Solichuk to Terichuk
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. I. Without plasticiser G RCC Grade M30 (i) Using Concrete Mixer
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. I. Without plasticiser A. PCC Grade M15 ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. I. Without plasticiser G RCC Grade M30 (i) Using Concrete Mixer
Supplying, fitting and placing uncoated TMT Bar reinforcement in foundation complete as per drawing and Technical Specifications. (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br.No. 2/1 on Solichuk to Terichuk
Supplying, fitting and placing uncoated TMT Bar reinforcement in foundation complete as per drawing and Technical Specifications. (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specifications. H) a) RCC Grade M 35 I) Height up to 5.0 m Case-I : Using Concrete Mixer i) Br.No. 2/1 on Solichuk to Terichuk
Plain/ Reinforced Cement Concrete in substructure complete as per Drawing and Technical Specifications. H) a) RCC Grade M 35 I) Height up to 5.0 m Case-I : Using Concrete Mixer ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Supplying, fitting and placing TMT bars reinforcement in substructure complete as per drawing and Technical Specifications b) (i) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br.No. 2/1 on Solichuk to Terichuk
Supplying, fitting and placing TMT bars reinforcement in substructure complete as per drawing and Technical Specifications b) (i) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. i) Br.No. 2/1 on Solichuk to Terichuk
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. i) Br.No. 2/1 on Solichuk to Terichuk
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification. i) Br.No. 2/1 on Solichuk to Terichuk
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification. ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification. i) Br.No. 2/1 on Solichuk to Terichuk
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification. ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification. A)By Mix in Place Method i) Br.No. 2/1 on Solichuk to Terichuk
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification. A)By Mix in Place Method ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
WBM Grading 2 Using stone screening Type-B 11.2 mm for Gr.II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification . Manual means i) Br.No. 2/1 on Solichuk to Terichuk
WBM Grading 2 Using stone screening Type-B 11.2 mm for Gr.II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification . Manual means ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
WBM Grading 3 Using stone screening Type-B 11.2 mm for Gr.III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification. By Manual Means i) Br.No. 2/1 on Solichuk to Terichuk
WBM Grading 3 Using stone screening Type-B 11.2 mm for Gr.III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification. By Manual Means ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification complete including carriage. Including Edge block/ Edge restraints i) Br.No. 2/1 on Solichuk to Terichuk
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification complete including carriage. Including Edge block/ Edge restraints ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification. i) Br.No. 2/1 on Solichuk to Terichuk
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification. ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification. 600mm equilateral triangle i) Br.No. 2/1 on Solichuk to Terichuk
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification. 800mm x 600mm rectangular i) Br.No. 2/1 on Solichuk to Terichuk
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification. 600mm circular i) Br.No. 2/1 on Solichuk to Terichuk
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification. 600mm equilateral triangle ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification. 800mm x 600mm rectangular ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification. 600mm circular ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mmX75mmX5mm, 330mm long complete as per clause 810.) i) Br.No. 2/1 on Solichuk to Terichuk
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mmX75mmX5mm, 330mm long complete as per clause 810.) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. i) Br.No. 2/1 on Solichuk to Terichuk
Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Implementation of Enviromental and Social Management Plan Air Quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Pre-Construction stage) i) Br.No. 2/1 on Solichuk to Terichuk
Implementation of Enviromental and Social Management Plan Air Quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Pre-Construction stage) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Implementation of Enviromental and Social Management Plan Air Quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction stage) i) Br.No. 2/1 on Solichuk to Terichuk
Implementation of Enviromental and Social Management Plan Air Quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction stage) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Implementation of Enviromental and Social Management Plan Air Quality monitoring at 3 locations for 2 seasons for 1 year. (Operation stage) i) Br.No. 2/1 on Solichuk to Terichuk
Implementation of Enviromental and Social Management Plan Air Quality monitoring at 3 locations for 2 seasons for 1 year. (Operation stage) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Implementation of Enviromental and Social Management Plan Water Quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Pre-Construction stage) i) Br.No. 2/1 on Solichuk to Terichuk
Implementation of Enviromental and Social Management Plan Water Quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Pre-Construction stage) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Implementation of Enviromental and Social Management Plan Water Quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction stage) i) Br.No. 2/1 on Solichuk to Terichuk
Implementation of Enviromental and Social Management Plan Water Quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction stage) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Implementation of Enviromental and Social Management Plan Water Quality monitoring at 3 locations for 2 seasons for 1 year. (Operation stage) i) Br.No. 2/1 on Solichuk to Terichuk
Implementation of Enviromental and Social Management Plan Water Quality monitoring at 3 locations for 2 seasons for 1 year. (Operation stage) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Implementation of Enviromental and Social Management Plan Noise Quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Pre-Construction stage) i) Br.No. 2/1 on Solichuk to Terichuk
Implementation of Enviromental and Social Management Plan Noise Quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Pre-Construction stage) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Implementation of Enviromental and Social Management Plan Noise Quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction stage) i) Br.No. 2/1 on Solichuk to Terichuk
Implementation of Enviromental and Social Management Plan Noise Quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction stage) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Implementation of Enviromental and Social Management Plan Noise Quality monitoring at 3 locations for 2 seasons for 1 year. (Operation stage) i) Br.No. 2/1 on Solichuk to Terichuk
Implementation of Enviromental and Social Management Plan Noise Quality monitoring at 3 locations for 2 seasons for 1 year. (Operation stage) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Implementation of Enviromental and Social Management Plan Soil Quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Pre-Construction stage) i) Br.No. 2/1 on Solichuk to Terichuk
Implementation of Enviromental and Social Management Plan Soil Quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Pre-Construction stage) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Implementation of Enviromental and Social Management Plan Soil Quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction stage) i) Br.No. 2/1 on Solichuk to Terichuk
Implementation of Enviromental and Social Management Plan Soil Quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction stage) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
Implementation of Enviromental and Social Management Plan Soil Quality monitoring at 3 locations for 2 seasons for 1 year. (Operation stage) i) Br.No. 2/1 on Solichuk to Terichuk
Implementation of Enviromental and Social Management Plan Soil Quality monitoring at 3 locations for 2 seasons for 1 year. (Operation stage) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
A Provisional Sum (Fixed Amount) for the items of tree cutting of Rs. 2,29,813.00 (not to be changed by the bidder in BOQ) i) Br.No. 2/1 on Solichuk to Terichuk
A Provisional Sum (Fixed Amount) for the items of Utility shifting and tree cutting of Rs. 57,453.00 (not to be changed by the bidder in BOQ) ii) Br. No.1/1 on Dhakuakhana to Charaiburha Chuk
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.14 MB
LOF.pdf
Additional Documents • 0.66 MB
SBD_Lakhimpur_16.pdf
Tender Documents • 2.02 MB
BOQ_60440.xls
BOQ • 0.37 MB
Technical_specification_Lakhimpur.pdf
Additional Documents • 6.83 MB
Volume_II_Drawings_Lakhimpur_16.pdf
Additional Documents • 6.94 MB
EMP_Lakhimpur_16.pdf
Additional Documents • 2.51 MB
LOT.pdf
Additional Documents • 1.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .