Tender Value
Refer Docs
EMD Value
₹10,800
Closing Date
7 Oct 2026, 10:00 amClosed
Divisional Forest Officer, Nayagada Divsion
O/o Divisional Forest Officer, Nayagada Divsion
Construction of VSS Building at Tulubi
2026_DFONA_142151_1
02 of 2026-27-08
Open Tender
Civil Works - Buildings
Percentage
150 days
Tulubi
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹10,800
13 Oct 2026
1 Oct 2026
12 Oct 2026
1 Oct 2026
7 Oct 2026
1 Oct 2026
1 Oct 2026 - 7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in hard soil or gravelly soil including dressing and levelling the bed and disposal of the excavated materials within initial leads and lifts as per direction of EIC. | 31.63 | Cum | 282.88 | ₹8,947.49 |
| 2 | Filling foundation and plinth with clean river sand with watering and curing including cost, conveyance, royalty and taxes of all materials and labour etc complete. | 24.79 | Cum | 580.39 | ₹14,387.87 |
| 3 | Providing Cement Concret (1:3:6) using 4cm size HG Metal including cost, conveyance, royalty and taxes of all materials and labour etc complete. | 8.47 | Cum | 6,229.56 | ₹52,764.37 |
| 4 | Providing RCC (1:1.5:3) using 12mm size HG Chips including cost, conveyance, royalty and taxes of all materials and labour and including the centering and shuttering but excluding the cost of MS Rod/Steel etc complete. - Coloumn Base and footing. | 4.76 | Cum | 6,606.86 | ₹31,415.62 |
| 5 | Providing RCC (1:1.5:3) using 12mm size HG Chips including cost, conveyance, royalty and taxes of all materials and labour and including the centering and shuttering but excluding the cost of MS Rod/Steel etc complete. - Plinth | 1.89 | Cum | 7,481.28 | ₹14,154.58 |
| 6 | Providing RCC (1:1.5:3) using 12mm size HG Chips including cost, conveyance, royalty and taxes of all materials and labour and including the centering and shuttering but excluding the cost of MS Rod/Steel etc complete. - RCC Grade Col. Beam | 4.34 | Cum | 15,989.7 | ₹69,443.27 |
| 7 | Providing RCC (1:1.5:3) using 12mm size HG Chips including cost, conveyance, royalty and taxes of all materials and labour and including the centering and shuttering but excluding the cost of MS Rod/Steel etc complete. - RCC Lintel | 1.09 | Cum | 14,320.58 | ₹15,623.75 |
| 8 | Providing RCC (1:1.5:3) using 12mm size HG Chips including cost, conveyance, royalty and taxes of all materials and labour and including the centering and shuttering but excluding the cost of MS Rod/Steel etc complete. - RCC Chajja | 12.53 | Cum | 1,241.85 | ₹15,555.41 |
| 9 | Providing RCC (1:1.5:3) using 12mm size HG Chips including cost, conveyance, royalty and taxes of all materials and labour and including the centering and shuttering but excluding the cost of MS Rod/Steel etc complete. - Stair case | 1.24 | cum | 15,851.88 | ₹19,577.07 |
| 10 | Providing RCC (1:1.5:3) using 12mm size HG Chips including cost, conveyance, royalty and taxes of all materials and labour and including the centering and shuttering but excluding the cost of MS Rod/Steel etc complete. - RCC Roof Slab | 5.54 | Cum | 13,924.03 | ₹77,083.43 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 1.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_611586.xls
BOQ • 0.26 MB
DTCNKUNDAKHAIVSSTULUBI.pdf
Tender Documents • 1.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .