| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹48,551 (0.27%)Admitted-Finance AT MANDARBAGICHA PADA WARD NO 20 PO BHAWANIPATNA DIST KALAHANDI 766001 | KALAHANDI | ODISHA | 766001 | ₹1.8 Cr+₹48,551 (0.27%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹14.5 L (7.98%)Admitted-Finance | ₹2.0 Cr+₹14.5 L (7.98%) | L3 | Admitted-Finance |
| 4 | L4₹2.2 Cr+₹38.7 L (21.4%)Admitted-Finance AT BAHARANA PO BAULANGA PS GOP DIST PURI | PURI | ODISHA | 752001 | ₹2.2 Cr+₹38.7 L (21.4%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Manoj Kumar Nayak L2 | Nalin Kumar Swain L3 | M/S.Parikshita Chuli and Sons L1 | Pramod Kumar Nayak L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling and removing the old RCC road slab with supply of all labour, T&P, cleaning the debris with all leads & lifts, transportation & disposing the same at the specified places etc all complete as per the direction of Engineer in-charge. ( Excluding GST). | 96 | Each Cum | 1,000 ₹96,000 Lowest | 2,000 ₹1,92,000 | 1,200 ₹1,15,200 | 1,200 ₹1,15,200 |
| 2.00 | Earth work excavation in foundation trenches in all types of soil with all leads and lifts including dressing and levelling the bed,shoring ,shuttering with supply of all labour, T&P, etc. all complete as directed by the Engineer-in-charge.
( Excluding GST). | 2,550 | Each Cum | 120 ₹3,06,000 | 160 ₹4,08,000 | 75 ₹1,91,250 Lowest | 150 ₹3,82,500 |
| 3.00 | Supplying,spreading of river sand including conveying the same by private trucks within all lead and all lifts spreading leveling watering, consolidating etc. all complete with cost of all transportation, T&P, etc. all complete as directed by the Engineer-in-charge. (Excluding GST). | 57 | Each Cum | 400 ₹22,800 | 500 ₹28,500 | 350 ₹19,950 Lowest | 450 ₹25,650 |
| 4.00 | Supplying, mixing, transporting, laying in proper level and grade Cement Concrete 1:3:6 (1 Cement : 3Coarse Sand : 6 hard granite graded chips of 20mm & below size Crusher Broken), hoisting, laying in layers, by use of vibrator, finished smooth to the exposed surface, to proper level & gradient curing etc. with supply of all materials, labour, T&P, hire & running charges of all machineries, transportation charges etc. all complete as directed by the Engineer-in-charge. (Excluding cost of centering & shuttering).(Excluding GST). | 87.55 | Each Cum | 3,700 ₹3,23,935 | 4,200 ₹3,67,710 | 2,800 ₹2,45,140 Lowest | 4,300 ₹3,76,465 |
| 5.00 | RCC work of proportion 1:1.5:3 (1 Cement :1.5 coarse sand : 3 Chips) grade using crusher broken hard granite aggregate of 20mm & down size of approved quality, mixing, transporting, hoisting, laying in layers, consolidating by mechanical vibrator, finished smooth to the exposed surface to proper grade with supply of all materials, labour, T&P, all transportation charges, engagement hire & running charges of all machineries etc. complete (But excluding cost of binding wire, cost of Steel & labour charges for cutting, bending, binding, placing of reinforcement and cost of centering & shuttering).( Excluding GST). | 462.77 | Each Cum | 5,100 ₹23,60,127 | 5,300 ₹24,52,681 | 4,700 ₹21,75,019 Lowest | 5,700 ₹26,37,789 |
| 6.00 | Supplying, cutting, straightening, bending, binding and placing in position the reinforcement bars of Fe500 confirming to I.S.-1786 specifications of SAIL/TISCON/RINL/ VIZAG with supply of binding wire of 18 to 20mm. gauge with supply of all labour, materials, T&P etc. all complete as directed by the Engineer-in-charge.( Excluding GST).
N.B. No wastage shall be paid | 462.77 | Each Qntl | 6,000 ₹27,76,620 | 5,800 ₹26,84,066 | 5,000 ₹23,13,850 Lowest | 7,000 ₹32,39,390 |
| 7.00 | Providing, rigid, smooth leakproof shoring, centering & shuttering with form works made of ply/ steel shutter for R.C.C works & dismantling the same after stripping off period including supply of all labour, materials, T&P,coaltaring after each use of shutter material etc. complete as directed by the Engineer-in-charge.(including cost of thermocool if required).( Excluding GST). | 1,933.1 | Each Sqm | 100 ₹1,93,310 Lowest | 500 ₹9,66,550 | 220 ₹4,25,282 | 130 ₹2,51,303 |
| 8.00 | Refilling with excavated earth (excluding boulder, rubbish, debris, iron ore, coal and other deleterious materials etc.) in foundation etc. in layers not exceeding 20Cm. thickness, consolidating by watering and ramming with supply all labour, T&P, equipments etc. all complete as directed by the Engineer-in-charge (Excluding GST). | 850 | Each Cum | 58 ₹49,300 | 100 ₹85,000 | 50 ₹42,500 Lowest | 75 ₹63,750 |
| 9.00 | Supplying of the earth excavator for leveling the ground surface ,collecting the debris and the spillage materials,disposing the same at identified sites with supply of all labour,T&P, ,transportation ,hire & running charges of machineries,operator expences etc complete as per direction of Engineer-In-Charge.( Excluding GST). | 48 | Each hr | 900 ₹43,200 | 1,000 ₹48,000 | 850 ₹40,800 Lowest | 950 ₹45,600 |
| 10.00 | Dewatering the accumulated water during earth work by deploying 5 HP Diesel pumps for smooth running of work with supply, hire & running charges of diesel pumps, fuel, required pipes, lubricants, operator expenses etc including to and fro transportation charges, T&P etc complete as directed by the Engineer-in-charge. (N.B:- No idle charges for pump shall be paid.) ( Excluding GST). | 250 | Each hr | 50 ₹12,500 Lowest | 160 ₹40,000 | 100 ₹25,000 | 75 ₹18,750 |
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
1 Jun 2020, 5:00 pmClosed
S. K. Samal, EE,PPT
Office of ECM Division, Engineering Department, Paradip Port Trust, Ground Floor, Administrative Building, Tele-06722-222008 Mob-9777660851
RE-ALIGNMENT OF 450 MM DIA D.I WATER SUPPLY PIPE LINE FROM NEW BUS STOP NEAR ELECTRICAL SUB-STATION TO ADMINISTRATIVE ROAD JUNCTION
2020_MoS_558790_1
CE/ECM/ACCTS-03/20/32
Open Tender
Civil Works
Works
240 days
Paradip
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Yes
As per TCN and TD
₹3.9 L
Yes
24 Aug 2020
12 May 2020
3 Jun 2020
12 May 2020
1 Jun 2020
12 May 2020
Amount
Dismantling and removing the old RCC road slab with supply of all labour, T&P, cleaning the debris with all leads & lifts, transportation & disposing the same at the specified places etc all complete as per the direction of Engineer in-charge. ( Excluding GST).
Earth work excavation in foundation trenches in all types of soil with all leads and lifts including dressing and levelling the bed,shoring ,shuttering with supply of all labour, T&P, etc. all complete as directed by the Engineer-in-charge. ( Excluding GST).
Supplying,spreading of river sand including conveying the same by private trucks within all lead and all lifts spreading leveling watering, consolidating etc. all complete with cost of all transportation, T&P, etc. all complete as directed by the Engineer-in-charge. (Excluding GST).
Supplying, mixing, transporting, laying in proper level and grade Cement Concrete 1:3:6 (1 Cement : 3Coarse Sand : 6 hard granite graded chips of 20mm & below size Crusher Broken), hoisting, laying in layers, by use of vibrator, finished smooth to the exposed surface, to proper level & gradient curing etc. with supply of all materials, labour, T&P, hire & running charges of all machineries, transportation charges etc. all complete as directed by the Engineer-in-charge. (Excluding cost of centering & shuttering).(Excluding GST).
RCC work of proportion 1:1.5:3 (1 Cement :1.5 coarse sand : 3 Chips) grade using crusher broken hard granite aggregate of 20mm & down size of approved quality, mixing, transporting, hoisting, laying in layers, consolidating by mechanical vibrator, finished smooth to the exposed surface to proper grade with supply of all materials, labour, T&P, all transportation charges, engagement hire & running charges of all machineries etc. complete (But excluding cost of binding wire, cost of Steel & labour charges for cutting, bending, binding, placing of reinforcement and cost of centering & shuttering).( Excluding GST).
Supplying, cutting, straightening, bending, binding and placing in position the reinforcement bars of Fe500 confirming to I.S.-1786 specifications of SAIL/TISCON/RINL/ VIZAG with supply of binding wire of 18 to 20mm. gauge with supply of all labour, materials, T&P etc. all complete as directed by the Engineer-in-charge.( Excluding GST). N.B. No wastage shall be paid
Providing, rigid, smooth leakproof shoring, centering & shuttering with form works made of ply/ steel shutter for R.C.C works & dismantling the same after stripping off period including supply of all labour, materials, T&P,coaltaring after each use of shutter material etc. complete as directed by the Engineer-in-charge.(including cost of thermocool if required).( Excluding GST).
Refilling with excavated earth (excluding boulder, rubbish, debris, iron ore, coal and other deleterious materials etc.) in foundation etc. in layers not exceeding 20Cm. thickness, consolidating by watering and ramming with supply all labour, T&P, equipments etc. all complete as directed by the Engineer-in-charge (Excluding GST).
Supplying of the earth excavator for leveling the ground surface ,collecting the debris and the spillage materials,disposing the same at identified sites with supply of all labour,T&P, ,transportation ,hire & running charges of machineries,operator expences etc complete as per direction of Engineer-In-Charge.( Excluding GST).
Dewatering the accumulated water during earth work by deploying 5 HP Diesel pumps for smooth running of work with supply, hire & running charges of diesel pumps, fuel, required pipes, lubricants, operator expenses etc including to and fro transportation charges, T&P etc complete as directed by the Engineer-in-charge. (N.B:- No idle charges for pump shall be paid.) ( Excluding GST).
Supplying and laying 125 Micron polythene separation membrane with Overlapping of 300mm at joints including cleaning the surface before placing the membrane etc. complete including cost of all materials, labour, cost of over lapping etc. all complete as directed by the Engineer-in-charge. (Excluding GST).
Supply, transportation & conveying the IRC Grade-III metal with all leads and lifts by private trucks, loading & unloading the materials and spreading metal of (22.40mm. to 53mm size IRC Grade-III confirming to seive analysis as per MOST specification) to uniform thickness of 100mm. thick in one layer, hand packing to proper camber and filling interstices with quarry dust over metal, watering etc. and consolidating with VRR including hire and running charges of VRR with supply of all materials, labour, T&P etc. all complete as directed by the Engineer in-charge. (Excluding GST).
Collecting, Conveying, Supplying & Spreading, IRC Grade-I metal (90mm. to 45mm.) from approved quality & filling the interstices with required granite stone quarry dust as per specification, laying on the existing profile of the road to the required slope, compacting by smooth wheeled road roller of minimum 8 to 10 Ton Static Weight to get a modulas of sub grade reaction 5.50Kg/Cm3 including supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments, water sprinkling, etc. all complete as directed by the Engineer-in-charge. (Excluding GST)
Supply and Laying of 450mm dia K-09 centrifugally cast(spun) Ductile iron pressure pipe of different dia for water as per IS 8329:2000 of socket and spigot pipe/ flange pipe of K9 class with inside surface of centrifugally lined with cement mortar lining and external coating comprises of zinc coating with finished layer of bituminous paint in standard length of 4.00Mtr/5.00Mtr/5.50Mtr/6.00Mtr as per requirement all complete including loading unloading at both ends cost of trandsportation ,testing of pipes as per IS code ,watch & ward ,depositing the same at designated place , with supply of all materials ,Labour, Machinery etc. all complete as directed by the Engineer-in-charge. N:B- Test as per IS code should be carried out during supply of materials in presence of PPT officials( Excluding GST )
Providing and laying double flanged(screw/welded) 450mm dia Ductile Iron pipes K-9 conforming to (IS8329) including supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments, etc. all complete as directed by the Engineer-in-charge. N:B- Test as per IS code should be carried out during supply of materials in presence of PPT officials( Excluding GST )
Providing Flanged joints to double flanged D.I pipes and specials of 450mm dia K-9 including testing joints with supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments etc. all complete as directed by the Engineer-in-charge.( Excluding GST)
Providing and fixing 450mm dia C.I. sluice valves(with caps) of KIRLOSKAR make complete with bolts,nuts,rubber insertions etc. with supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments etc. all complete as directed by the Engineer-in-charge. ( Excluding GST )
Providing and fixing 100 mm dia C.I. double acting air valves(with caps) of KIRLOSKAR make complete with bolts,nuts,rubber insertions etc. with supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments etc. all complete as directed by the Engineer-in-charge.( excluding GST)
Providing push-on-joints to 450mm dia Ductile Iron pipes including testing of joints and the coat of rubber gasket with supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments etc. all complete as directed by the Engineer-in-charge. (Excluding GST )
Making Lead caulked joints to 450mm dia D.I pipes and specials as per specification including making thread,gasketing and testing the joints and supply of Lead,gasket,fire wood,cost and conveyance of all materials required for the work and all labour,T&P etc all complete and testing the pipe lines flushing the pipe line with proper means as per direction of Engineer-In-Charge.(Excluding cost of GST)
450mm dia mechanical joint for D.I pipe with supply of all nuts and bolts ,rubber gasket confirming to IS-5382 as per specification with supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments etc. all complete as directed by the Engineer-in-charge. ( Excluding GST )
Construction masonary chamber120x120x100 cm in brick work in cement mortar 1:4 for sluice valves with c.i surface box 100mm top diameter,160mm bottom diameter and 1800mm deep(inside) with chain lead and RCC slab 1:2:4mix with necessary excavation foundation concrete 1:5:10 (1 cement:5 fine sand:10 graded stone aggregate 40mm nominal size) and inside plastering with cement mortar 1:3 12mm thick finished with a floating coat of neat cement complete as per standard design with common burnt clay F.P.S(non-modular) brickes of class designation 7.5 with supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments, water sprinkling, excluding cost of GST, etc. all complete as directed by the Engineer-in-charge.
Labour charges for laying of 450mm dia DI pipes (both socket and flanged pipes ) and specials as supplied, making proper line and gradient ,level testing the pipe/fitting to assure leak proof,levelling the bed of pipe, with transporting the material from section store/central store to work site, watch and ward to pipes and fittings, providing light and barrier, hire and running charges of private vehicles for shifting of pipe/specials with all lead and lifts ,cost of loading and unloading at work site /store ,watch and ward testing / commisioning of the pipeline etc all complete as per direction of Engineer-in-charge.(Test should be carried out to ensure to leak proof of the pipeline ). (Excluding cost of GST)
Labour charges for fitting,fixing of 450mm dia Sluice valve with supply of DI nuts and bolts,rubber packing etc as per requirement positioning and fitting in proper place ,making joints with testing the fittings to leak proof including supply of all labour,materials ,T&P , Port entry fee etc all complete as per direction of Engineer-in-charge.(Excluding cost of GST
Cutting the DI pipes as per required length with supply of all labour, materials, T&P etc all complete as per direction of Engineer-in-charge. (Excluding cost of GST)
Supply of all labour cleaning of site, removal of unwanted grass ,bushes etc. with supply of all labour, materials, T&P etc all complete as per direction of Engineer-in-charge. (Excluding cost of GST)
Making holes in R.R stone masonary wall and mending good to the damages etc with supply of all materials, labour, T&P, scaffolding, royalties, curing etc. all complete as directed by the Engineer-in-charge.excluding cost of GST
Dismantling the damaged pipe including and removing the fittings clear out of site with all leads and lifts by any meanswith supply of all labour materials, T&P etc all complete as per direction of Engineer-in-charge. (Excluding cost of GST)
Supplying,fitting and fixing of following D.I fittings as per IS 9523:2000 with internal surface of centrifugally lined with cement mortar and outside of metalic zinc coating of zinc rich paint coating with finishing layer of bituminous paint as per IS 9523 including loading and unloading at both ends stacking at site or store and transporting the same to the work site as per requirement with supply of all materials, labour, T&P, Port entry fees etc. all complete as directed by the Engineer-in-charge.all test as per IS 9523 will be carried out by the contractor with the testing charges as per direction of EIC(excluding cost of GST.)
450mmx450mmx450mm DI Tee (D/F)
450mmx450mmx100mm Dia Flange Tee
450mm Dia DI Collar
450mm dia DI 90 degree Flange bend
450mm dia DI 90 degree Socket bend/120 degree bend
450mm dia DI 90 degree DI H.R bend(D/F)
450mm dia DI 90 degree DI H.R bend
450mm dia DI 11.25 degree bend (D/F)
450mm dia DI 11.25 degree bend
450mm dia DI 45/4 degree socket bend
450mm dia DI 45/4 degree bend (D/F)
450mm dia DI 45 degree bend (D/F)
450mm dia DI 45 degree socket bend
450mm dia DI spgiot/socket tail piece
Manoj Kumar Nayak
Nalin Kumar Swain
Pramod Kumar Nayak
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_586310.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .