Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.4 CrAccepted-AOC VPO BARI TEHSIL GANAUR SONEPAT 131101 | SONEPAT | SONIPAT | HARYANA | 131101 | ₹12.4 Cr Quoted ₹13.1 Cr | 1 | Accepted-AOC L-1 |
| 2 | 2₹13.4 CrRejected-Finance | ₹13.4 Cr | 2 | Rejected-Finance L-2 |
| 3 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-PreQual/Technical 65 MODEL TOWN 136026 | KAITHAL | HARYANA | 136026 | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹18 L
Closing Date
9 Jun 2021, 5:00 pmClosed
Executive Engineer
Executive Engineer Provl. Division No.II, PWD BR Br. Karnal
Strengthening of road from Panipat to Munak Head via IOCL from RD Km. 9.300 to 18.100 in District Karnal
2021_HRY_172073_1
Strengthening of road from Panipat to Munak Head v
Open Tender
Civil Works
270 days
Karnal
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
Yes
₹18 L
Yes
23 Jul 2021
18 May 2021
10 Jun 2021
18 May 2021
9 Jun 2021
18 May 2021
Amount
Milling of distress bituminous layer upto 50/70mm depth in a single pass with suitable milling machine (capable of milling @ 200-300 sqm area per Hr.) fitted with loading conveyor for loading the milled material directly on the trucks i/c hauling and stock piling the reclaimed material near the central recycling plant or reclaiming to bring to required specification to reuse with the approval of Engineer-in-Charge for safe disposal with all leads and lifts complete in all respects. Note :- 1. The unutilized quantity of reclaimed bituminous mix material shall be a recovery item as mention in BOQ item No. 22. 2. The quantity of reclaimed material shall be considered minimum 80% of theoretical volume. The reclaimed material shall be used 30% of total quantity of DBM item No. 5 as per clause No. 519 of MoRT&H specifications.
Providing, laying 150 mm thick spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H specification for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects as per clause No.406. (N.S.) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer.
Providing and applying primer coat with bitumen emulsion (S.S grade - I) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 Kg/Sqm using mechanical means as per MoRT&H specification for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects as per clause No.502. (N.S.)
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg. per sqm. on the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No.503 (5th edition) 2013 as per MoRT&H specification (N.S.)
Providing & laying 70 mm DBM using the reclaimed material to the extent of 30% per cent of the required quantity after carrying out necessary checks and evaluation, adding fresh material including rejuvenation as required, grade, level and thickness, all as specified in clause 519. (5th revision) 2013 using bitumen VG-30 (minimum Bitumen's 4.50% i/c bitumen of retrieved material as per job mix formula ) using 100-120 TPH batch type hot mix plant with appropriate arrangement for use of R.A.P, appropriate rollers and with hydraulic paver finisher with sensor control to the required grade. The milled material to be used in DBM shall be minimum 80% of the theoretical quantity. Note: - If bitumen required more than 4.50% as per job mix formula no extra payment will be paid extra bitumen required will be considered as incidental to work. Note: - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. 3). Where there is DBM on existing black top , cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work.
Providing and laying 40 mm compacted thickness of Bituminous Concrete (BC) in one layer with 100 - 120 TPH Batch Type Hot Mix Plant with bituminous binder VG-30 @ 5.4% (minimum) and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher having sufficient screed width so that the BC in full width of the carriage way is laid in single opration without any longititutinal joint with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and with pneumatic tyred roller (PTR) of 12 to 15 tonne weight with a tyre pressure of at least 0.56 MPa and tandem rollers to achieve the desired compaction as per MORT&H specification (Vth revision)-2013 Clause No. 507 complete in all respect. If bitumen required is more than 5.4% as per job mix including waste plastic material no extra payment will be made, Extra bitumen required will be considered as incidental to work. If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note: - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. Note: - Where there is only BC on existing black top, cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work.
Reinforced cement concrete 1:2:4 Kilometre stone of standard design, fixed in position, including finishing and painting (10.129 (i) + 16.75 (b) (i) 5th Kilometre stone
Reinforced cement concrete 1:2:4 Kilometre stone of standard design, fixed in position, including finishing and painting (10.129 (ii) + 16.75 (b) (ii) Ordinary Kilometre stone
Providing and fixing RCC village Boards 1.85x0.90x0.075m size of cement concrete 1:1½:3 with minimum 16 kg. reinforcement finished with 6mm thick cement morter plaster 1:4 including loading, un-loading, carriage to site of work, fixing in cement concrete 1:3:6 pedestral of size 60 cm x 145 cm x 70 cm with minimum 55 cm embedment as approved by Engineer – in- charge excluding painting and lettering.
Reinforced cement concrete 1:2:4 boundary pillars of standard design, fixed in position, including finishing and painting. (HSR 10.131)
Reinforced Cement Concrete 1:1½:3 studs of standard design, fixed in position, i/c finishing with exterior paint & primer coat & one 100mm wide retro reflective prismatic band consisting of 3mm ACP having high intensity micro prismatic sheeting confirming to IRC: 67:2012 on it duly fixed with 5 numbers 2” long screws with roller plug complete in all respect as per drawing in Section-9.
Pavement Marker (Cat Eyes) Moulded shank raised pavement markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing internal reflection of the light entering the lens face and shall support a load of 16000 KG tested in accordance to ASTM D 4280 Type H and complying to specifications of Category A of MORTH Circular No. W/NH/33023/10-97-DO III dt. 11.06.1997. The height width and length shall not be exceed 50mm, 100mm and 100 mm and with minimum reflective area of 13 Sqcm. On each side and the slope to the base shall be 35+/- degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19+/-2 mm and height not less than 30+/- mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer (of reputed make such as Avery Dennison/3M)
Providing & Marking center line / side line 2.5mm thick (minimum) with hot applied thermo-plastic road marking paint 10 cms wide/ 15cm wide complete in all respect such as furnishing all labour, materials, tolls equipments including all incidental costs necessary for carrying out in work at site confirming to the technical specification as clause No. 803 of MORT&H specification for road and bridge works (5th revision) of 2013/ Latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apcomark/Berger-Sigmarc/Prismo. The glass beads shall be of Potters/Sovitec/Fleolite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer-in-Charge a copy of certified test reports from the manufacturer of the thermoplastic material meet all requirement of the specifications. The reflector zing glass beads shall meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2.4 shall be meticulously followed. The minimum thickness specified is exclusive of surface of glass beads the method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (part-3). Note: - Before start of work the contractor shall give brand, batch number, manufacturing date of the material to be used along with a photocopy of bill duly signed by the contractor and get approved the same from Engineer-In-Charge before use.
Providing and installing shoulder mounted direction signage of various sizes using non-metallic micro prismatic retro reflective sheet conforming to IRC-67-2012 type IV, HIP specification fixed on 3 mm thick Aluminium composite panels as base board with pressure sensitive adhesive having 0.5 mm thick Aluminium on both sides supported on single or two nos, Mild steel pipe post 80 mm NB medium class 4 mm thick embedded in M-20 grade concrete foundation of size (600 mm X 600 mm X 750 mm) complete as per drawings Technical specification and as directed by Engineer-in-Charge. Size 1200mm x 900mm
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected/ welded with 5 mm thick steel plate of 50 mm duly painted as per column mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect.
Providing & erecting OVERHEAD SIGNS gantry supported by M. S. Pipe Structure (MS Pipe should be of TATA/Sail/Jindal/RINL make only) complete as per drawings, Technical Specifications and as directed by Engineer-In-Charge including painting with red oxide primer and first quality synthetic enamel paint, construction of R. C. C. foundation for providing of M. S Tubular structure for Cantilever signage at given site as per drawing enclosed. The C. C. mix to be in ratio of 1:1½:3 (RCC 1:1½:3) and that of lean to be ratio of 1:3:6 the work will be carried out as per the instructions of Engineer-In-Charge. Note: - Foundation including reinforcement etc. as per Drawing. Cantilever Over head Sign gantry. (r-Type) frame/truss Size- 3.05 m x 1.525 m Note: - This item is excluding sign boards which will be payable extra as per item No. 17
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150x75x5 mm spaced 2 m centre to centre, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long & pdg. reflective tape on the both side of the channels of vertical post complete as per clause 810 of MORT&H specification.
Earth work in excavation in foundations, trenches, etc. in all kinds of soils, not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres.(HSR 6.6)
Cement concrete 1;2;4 with stone aggregate 20mm nominal size in first storey upto 4 metres above plinth level (HSR 10.59)
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift and including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305 and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -9. Note:- No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
rameher contractor
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid