Loading…
Loading…
Tender Value
₹46.3 L
EMD Value
₹92,583
Closing Date
7 Oct 2026, 11:00 am
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER, MIRIK ENGINEERING DIVISION, KRISHNA NAGAR MIRIK-734214
Recovery and reconstruction of Road from Sahid Bedi to Gumba at Phuguri Lamey Tar (L 0.85Km)
2026_GTA_5074431_5
NieT05/EE/MED/GTA/2026-27
Open Tender
CIVIL WORKS
Percentage
180 days
Mirik
As per NieT
5 documents required · 5 mandatory
₹0
₹92,583
Yes
23 Sept 2026
23 Sept 2026
9 Oct 2026
23 Sept 2026
7 Oct 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Land Slide Clearance in Soil Clearance of land slides in soil and ordinary rock by abull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side. | 634.17 | m3 | 61.8 | ₹39,191.71 |
| 2 | Earth work in cutting to form road section in correct profile inincluding removal of spoils not exceeding initial leas of 50 m and initial lift of 1.50 m | 393.66 | m3 | 109.9 | ₹43,263.23 |
| 3 | Excavation in odinary rock using manual means including removal of spoila within all lifts and lead upto 50 m | 19.84 | m3 | 444 | ₹8,808.96 |
| 4 | Earthwork in excavation of foundation trenches in all sorts of soil ( including mixed soil but excluding stoney and moorum soil ) including removing, spreading or stacking the spoils within a lead of 150metres as directed and including trimming the sides of the trench levelling, dressing & ramming the bottom, bailing or pumping out water et. As required complete, depth of excavation exceeding 1 metre upto 2m below avrage bed lable at the site of excavation and requring shoring. | 125.71 | m3 | 114 | ₹14,330.94 |
| 5 | (II) Cement concrete with 30 mm down graded ballast excluding shuttering. N.B. Variety ( 1:3:6) | 3.94 | m3 | 4,608 | ₹18,155.52 |
| 6 | Plum concrete work with cement concrete (1:3:6) with 40% 30mm down graded stone metal 60% and stone boulder of size 150mm and above placed in position as directed excluding shuttering if any. | 387.26 | m3 | 3,304 | ₹12,79,507.04 |
| 7 | Providing formwork and staging including Hire & Labour charges for Abutment and its components and retaing wall and its components for Height Upto 3 metre clear span including stripping off and removing after completion of work as per specification and direction. | 242.1 | m2 | 214 | ₹51,809.4 |
| 8 | Rubble masonry in cement (6:1) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site. | 89.31 | m3 | 3,739 | ₹3,33,930.09 |
| 9 | Dry rubble masonry with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site. | 38.27 | m3 | 2,450 | ₹93,761.5 |
| 10 | V Drain: Earthwork in excavation of foundation trenches in all sorts of soil ( including mixed soil but excluding stoney and moorum
soil ) including removing, spreading or stacking the spoils | 64.8 | m3 | 114 | ₹7,387.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
Tendernotice_2.pdf
PDF • 1.32 MB
Tendernotice_3.pdf
PDF • 0.19 MB
GTAFORM.pdf
Tender Documents • 1.31 MB
BOQ_5161198.xls
BOQ • 1.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .