Loading…
Loading…
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
3 Sept 2026, 4:00 pm7d left
Executive Engineer REW Leh
Office of the Executive Engineer REW Leh
Remodelling of Water Storage Tank at Zinggok Stok (under SDP)
2026_RDD_19438_1
36- UTL REW Leh of 2026-27
Open Tender
Civil Works - Others
Percentage
90 days
Leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,123
Payable To Executive engineer REW Leh
₹2.2 L
25 Aug 2026
25 Aug 2026
4 Sept 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
All kinds of soil | 4,505 | cum | 208.42 | ₹9,38,932.1 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soil. | 38.9 | cum | 278.09 | ₹10,817.7 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 525 | cum | 220.41 | ₹1,15,715.25 |
| 4 | Providing and laying of dry pitiching stone including the cost of stone ON HORIZONTAL | 12.79 | cum | 953.03 | ₹12,189.25 |
| 5 | Providing and laying of dry pitiching stone including the cost of stone ON TOP | - | cum | 1,132.32 | - |
| 6 | Providing and laying of dry pitiching stone including the cost of stone ON SIDE SLOPE | 272.82 | cum | 1,240 | ₹3,38,296.8 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | 5,725.33 | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 gradedstone aggregate 40 mm nominal size derived from natural sources) | - | cum | 6,417.78 | - |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 75.14 | cum | 7,993.55 | ₹6,00,635.35 |
| 10 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished 40 mm thick with 20 mm nominal size stone aggregate | 22.67 | sqm | 578.86 | ₹13,122.76 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_46085.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].