| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.5 LAccepted-AOC GALI NO 1 VILLAGE BAGTHALA TEHSIL BAWAL DISTT REWARI 123501 | BAWAL | REWARI | HARYANA | 123501 | 1 | Accepted-AOC 1st Lowest | |
| 2 | 2₹25.7 L+₹2.2 L (9.25%)Rejected-AOC | 2 | Rejected-AOC 2nd Lowest | |
| 3 | Rejected-Technical | - | Rejected-Technical 1st preference to co-op socities as per Govt norms | |
| 4 | Rejected-Technical | - | Rejected-Technical 1st preference to co-op socities as per Govt norms | |
| 5 | Rejected-Technical | - | Rejected-Technical 1st preference to co-op socities as per Govt norms |
Tender Value
₹25.5 L
EMD Value
₹51,000
Closing Date
16 Apr 2025, 5:00 pmClosed
PARDEEP SINDHU
PD - II, Gurgaon
Construction of Boundary wall at SHC Inchapuri in Gurugram District.
2025_HRY_438865_1
202552E565CF 83C3 4D55 AFD8 4F270DEBFDEF622BAR
Open Tender
Civil Works
Works
90 days
Inchhapuri
2 documents required · 2 mandatory
₹5,000
₹51,000
Yes
7 Jun 2025
7 Apr 2025
17 Apr 2025
7 Apr 2025
16 Apr 2025
7 Apr 2025
Amount
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
[11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate]
[11.60]Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. [Through Rate]
[11.68.3]Applying priming coat: 3. With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works [Through Rate]
[11.82.1]Painting the wooden / metal surface with synthetic enamel paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new work [Through Rate]
[11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [Through Rate]
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate]
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level [Through Rate]
[6.25.2]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 2. All works above plinth level up to floor IV level [Through Rate]
[6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns [Through Rate]
[6.29.3]Centering and shuttering including strutting, propping etc. and removal of form work for : 3. Columns, piers, abutments, pillars, posts and struts [Through Rate]
[6.36.1]Steel reinforcement for R.C.C. work ready to use `cut and bend` rebars of approved make from factory/workshop to construction site including placing in position and binding all complete above plinth level. 1. Thermo-Mechanically Treated bars of grade Fe-500D or more. [Through Rate]
[7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
[7.23.1]Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to IS: 2222 in superstructure above plinth level up to floor four level in cement mortar 1:6 (1 cement : 6 coarse sand) : 1. With non-modular bricks [Through Rate]
The Nandrampur Bass L and C Society Ltd. (BID ID -1243185)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .