Loading…
Loading…
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
23 Feb 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Deposit Work
Above/Below/Par
TECH SIG
16 conditions · 2 needing a document upload
: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderer shall submit requisite information as per Annexure-VIII given in tender document, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. As per Clause No. 10.2 of Tender Form (second Sheet) of Annex. I of Part-I of GCC-2022, with up to date correction slip.
(a) The tenderer must have successfully completed or substantially completed any of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work each costing not less than the amount equal to 60% ofadvertised value of the tender. (b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender.
Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b) (2) In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Signal & Telecom Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Signal & Telecom Engineer in writing.
Note: A work experience certificate from a private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate. As per Clause No. 10.1 of Tender Form (second Sheet) of Annex.I of Part-I of GCC-2022, with up to date correction slip
Defination of Similar Work :- Any EI/RRI work (involving one EI/RRI of more than 100 routes) of Supply, Installation, Testing, Commissioning OR Any Signalling Alterations work in an EI/RRI having more than 100 routes
11 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The EI alteration work is to be done at the Churu (CUR) station of the BKN-SDLP section of the Bikaner Division. The EI alteration work is related to the closure of LC-165 Spl and LC-167A of the CUR station. The Mini-Plan of the CUR station is attached to the document. EI OEM of CUR station - M/s HITACHI RAIL STS INDIA PRIVATE LIMITED-BANGALORE
The EI alteration work is to be done at the Loharu (LHU) station of the SDLP-RE section of the Bikaner Division. The EI alteration work is related to the closure of LC-124. The Mini-Plan of the LHU station is attached to the document. EI OEM of LHU station - M/s HITACHI RAIL STS INDIA PRIVATE LIMITED-BANGALORE.
S&T associated work for the provision of ROB/RUB on LC-165 spl at Km 280/1-2, LC-167A at Km 282/5-6 of CUR yard, and LC-124 at Km 174/5-6 of LHU yard over Bikaner Division.
SnT-BKN-ET-2025-26-37
SnT-BKN-ET-2025-26-37
Open
Works - General
12 Months
Bikaner, Rajasthan
₹0
₹2.0 L
23 Feb 2026
30 Jan 2026
105 items across 14 schedules · ₹97,59,744.62 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | For Station with routes less than 100 | Per Functional Vital Bit | 8.00 | 1,05,893.14 | 8,47,145.12 |
| 2 | For Station with routes more than 100 | Per Functional Vital Bit | 20.00 | 75,278.9 | 15,05,578 |
| 3 | Installation, wiring, programming, testing and commissioning of EI equipment supplied as per supply item in item no. 01010400 above of Chapter 1 of this SOR including transportation from Consignee's depot to site. The works and materials for installation, wiring, testing and commissioning, grouting, cutting of floors, walls, refilling of the same, re-plastering, required CC/ masonry works, fixing/ placing/ laying of insulated ladders/ casing- capping/ cable trays/ RCC/GI pipes / Cables, termination of cables with lugs/ connectors, painting/ lettering are to be provided/ done by the contractor for the equipments supplied vide item no. 01010400 of Chapter 1 of SOR. This also covers the networking of built in EI Data loggers of all the stations to monitor the system to any other places where desired by Engineer-in- charge. (THIS ITEM SHALL BE USED ONLY FOR ALTERTION WORK IN EXISTING EI) Note: Installation shall be complied to RDSO Technical Advisory Note No STE/E/TAN/3012 dtd. 28.08.2014. Installation, wiring, programming, testing and commissioning of Operator VDU in Hot stand-by with Redundancy. Any Equipments/cards/Modules required for Hot stand-by with Redundancy shall be supplied and Installed by the Contractor. Note: This also includes supply of Two nos. of composite computer and printer table (Godrej work station table) and one no Godrej make operator chair model PCH7001. Termination of indoor/ PIJF cables in relay room on relays, tag blocks, CT racks as per approved wiring diagram including alterations/ modifications as required at site. Soldering to be done at all required termination. Dressing/ lacing of wiring shall be done neatly with help of dressing thread / plastic self lock strip of suitable size. The tools/ equipments/ materials/ simulation boards required for testing shall be supplied / fabricated by contactor. This includes replacement of modules/ cards/ LEDs/ equipments going defective during testing. Necessary power supply boards with required capacity plugs, sockets, surge and lightning protection boxes shall be supplied and installed by the contractor. 230V supply shall be arranged by Railways. In case supplies are required to be extended, from Power room / relay room then same shall be extended by the contractor with his own materials such as 1X16 sq mm wires, cables, lugs, RCC/GI pipes, insulated ladders etc. After ST/LT testing, Factory Acceptance Tests (FAT) and Square Sheet testing system should be fault free while submitting to Railways, otherwise suitable necessary action can be taken by Engineer-in-charge. Inspection: Consignee, Inspection charges: None, Payment terms: 100% after commissioning. | Job | 2.00 | 6,53,241.66 | 13,06,483.32 |
| 4 | Design, preparation & supply of drawings in computer print copies and original tracing in AUTO CAD FORMAT for Electronic Interlocking at each station. After completion of the work, the completion drawings incorporating completion details are to be supplied as per Technical Specifications given in tender document (upto 6 Line). The technical specifications are as per ANNEXURE-01010100 of SOR. Inspection: Consignee Inspection charges: None Payment terms: 100% after execution | Station | 2.00 | 2,11,776.71 | 4,23,553.42 |
| 5 | Preparation of SWR literature in English along with associated mid-section interlocked gate with all corrections as per approved SWRD & approved SIP. For these all-technical corrections, editing, grammatical correction etc. are to be carried out and one rough print to be given to railways for approval before printing, as required for final processing of CRS sanction. This also includes preparation of maintenance cards in format provided by Rly. Inspection: Consignee Inspection charges: None Payment terms:100% after execution. | Station | 2.00 | 4,330.94 | 8,661.88 |
| 6 | Translation of Station Working Rules from English to Hindi and framing out in DIGLOT form (or similar software) as per extant Rly practice. The required SWR in English will be provided by the contractor and has been covered separately in item no. 01011800 of Chapter 1 of SOR. Inspection: Consignee Inspection charges: None Payment terms:100% after execution. | Station | 2.00 | 5,389.49 | 10,778.98 |
| 7 | Making photocopies & binding of the SWR literature in English/Hindi/Diglot form as per Railway practice. Inspection: Consignee Inspection charges: None Payment terms:100% after execution. | Set | 12.00 | 214.85 | 2,578.2 |
| 8 | Addition/alteration in existing relay room wiring. It includes supply of PVC insulated indoor Railway signalling cable @40<45@Core/40-Core) of (1/0.6) sqmm as per RDSO Spee. No. IRS/S-76/89 (Amnd.2 or latest) for wiring between relay room and SM's/Panel room & Relay room to DP in SM office for block working. This also includes supply of PVC insulated jumper wires of multi strand 16/.2 mm, tinned in all colours as per RDSO Specn.No.IRS-S- 76/89(Amnd.2 or latest). This item will include bringing all the power supplies from power room to respective bus bars on relay racks by using 10/6 sqmm copper flexible wire as per instructions of engineer incharge. This will include wiring between control panel and relay room if required. All wiring will be done as per standard practice of North Western Railway with neat dressing & threading. The item includes supply & wiring of tag block, fuse with bases (G-Type and ND Type) and all other related material required for complete indoor wiring in relay room. Inspection: Consignee Inspection charges: None Payment terms:100% after execution. | Per Relay | 30.00 | 630.75 | 18,922.5 |
| Schedule total | ₹41,23,701.42 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCCS3.pdf
GCCCS1.pdf
IRGCCApril2022.pdf
GCCCS2.pdf
GCCCS7.pdf
GCCCS6.pdf
GCCCS9.pdf
GCCCS4.pdf
GCCCS5.pdf
GCCCS8.pdf
CUR-LC-165167A.pdf
LHU-ModelforLC-124Closure.pdf
GCCCS10.pdf
TechnicalCondition-LC-167ALC-165SplLC-124.pdf
sign_D_9239_1769773556114.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .