Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹15.1 LAccepted-AOC | ₹15.1 L Quoted ₹15.5 L | l1 | Accepted-AOC L1 |
| 2 | l2₹17.4 LRejected-AOC | ₹17.4 L | l2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MOHAN AGENCIES L1 | T K CHITI BABU L2 |
|---|---|---|---|---|---|
| 1.00 | Providing scaffolding at flue gas duct work including the cost of consumables and T&Ps. | 100 | Sq.mtr | 64 ₹6,400 | 110 ₹11,000 |
| 2.00 | Charges for fabrication and erection of MS structural and patch up work. | 8 | MT | 38,500 ₹3.1 L | 48,500 ₹3.9 L |
| 3.00 | Supply of Mild Steel Plate (6mm thick) for flue gas duct in standard length and width.
(If the materials are available in NCTPS Store at time of work execution, it will be supplied by TANGEDCO at free of cost and it will be excluded from contractor’s scope). | 6 | MT | 71,299 ₹4.3 L | 72,500 ₹4.3 L |
| 4.00 | Supply of various sizes if structural material like angle, Channel and beams. If the materials are available in NCTPS Store at time of work execution, it will be supplied by TANGEDCO at free of cost and it will be excluded from contractor’s scope. | 2 | MT | 71,299 ₹1.4 L | 72,500 ₹1.4 L |
| 5.00 | Charges for complete inspection & welding of eroded/weaken welding joints. Erection of bracing pipe including of grinding, cutting and welding in flue gas/primary/ secondary air ducts above from 9 Mtrs to 35 Mtrs elevation in flue gas ducts using welding rod as directed by the Engineer in charge including consumables and T&P's. | 300 | Mtrs | 329 ₹98,700 | 415 ₹1.2 L |
| 6.00 | Supply of Bracing pipe of Dia 80/100.
Bracing pipe size:OD Ø114.3mm, thick- 6.02mm.
(If the materials are available in NCTPS Store at time of work execution, it will be supplied by TANGEDCO at free of cost and it will be excluded from contractor’s scope). | 140 | Mtrs | 1,389 ₹1.9 L | 1,450 ₹2.0 L |
| 7.00 | Supply of Bracing pipe of Dia 80/100.
Bracing pipe size:OD Ø88.9mm, thick- 5.49mm
(If the materials are available in NCTPS Store at time of work execution, it will be supplied by TANGEDCO at free of cost and it will be excluded from contractor’s scope). | 250 | Mtrs | 989 ₹2.5 L | 1,140 ₹2.9 L |
| 8.00 | Charges for leading,lifting and transportation of Iron and steel materials from stores to site including hire charges for mobile crane. | 8 | MT | 4,329 ₹34,632 | 5,200 ₹41,600 |
| 9.00 | Charges for Transportation of retrieved material and scrap from 23 mtr. APH to the NCTPS-II stores | 1 | Opn | 2,999 ₹2,999 | 3,600 ₹3,600 |
| 10.00 | Charges for removal of accumulated ash from flue gas duct at various locations as directed by Engineer incharge. | 15 | Cub.mtr | 2,999 ₹44,985 | 3,500 ₹52,500 |
Tender Value
Refer Docs
EMD Value
₹17,300
Closing Date
10 Jul 2025, 2:00 pmClosed
CE NCTPS II
Office of Chief Engineer NCTPS II CHENNAI 120
NCTPS II MI Circle BM Dn Unit II AOH 2025 26 Flue Gas Duct APH hopper area and ESP outlet to Chimney Inlet duct
2025_EB_578022_1
CE NCTPS II SE M I O M 77 2025 26
Open Tender
Miscellaneous Works
40 days
SE MI NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,300
Yes
27 Mar 2026
4 Jul 2025
11 Jul 2025
4 Jul 2025
10 Jul 2025
4 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_690742.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid