Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC VILL BIDYAPARA CHURCH ROAD WARD NO 9 PO DHUBRI DISTRICT DHUBRI ASSAM | DHUBRI | ASSAM | 783123 | ₹2.2 Cr | L1 | Accepted-AOC Lowest evaluated responsive bid |
| 2 | L1₹2.2 CrRejected-AOC VILL CHALAKURA PART VI P S DHUBRI DISTRICT DHUBRI ASSAM PIN 783301 | DHUBRI | ASSAM | 783301 | ₹2.2 Cr | L1 | Rejected-AOC Non-responsive |
| 3 | L1₹2.2 CrRejected-AOC 1 NO DULIAJAN C O JAI PRAKASH YADAV PO ANANDAPARA DULIAJAN DIBRUGARH ASSAM 786692 | DIBRUGARH | ASSAM | 786692 | ₹2.2 Cr | L1 | Rejected-AOC Non-responsive |
| 4 | L2₹2.3 Cr+₹10.8 L (5.00%)Rejected-AOC VILL P O JAGGERA PS BELSOR DIST NALBARI ASSAM DHUBRI 781310 | JAGGERA | NALBARI | ASSAM | 781310 | ₹2.3 Cr+₹10.8 L (5.00%) | L2 | Rejected-AOC Non-responsive |
| 5 | L3₹2.7 Cr+₹53.9 L (25.0%)Rejected-Finance NOT AVAILABLE | PALWAL | HARYANA | 121004 | ₹2.7 Cr+₹53.9 L (25.0%) | L3 | Rejected-Finance Non-responsive |
| Sl No | Description | Qty | Unit | ANOWAR UZ ZAMAN AHMED L1 | M/s A.B. ENTERPRISE L1 | M/s. Rituraj Enterprise L3 | Foyzal Hoque L1 | SAILEN BAISHYA L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | CIVIL
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil | 981.01 | cum | 96.3 ₹94,471.26 | 93 ₹91,233.93 Lowest | 146.4 ₹1,43,619.86 | 96.3 ₹94,471.26 | 112.35 ₹1,10,216.47 |
| 2.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 417.91 | cum | 228.56 ₹95,517.51 Lowest | 1,883 ₹7,86,924.53 | 976 ₹4,07,880.16 | 228.56 ₹95,517.51 Lowest | 262.5 ₹1,09,701.38 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 32.06 | cum | 6,150.06 ₹1,97,170.92 | 5,955 ₹1,90,917.3 Lowest | 9,500 ₹3,04,570 | 6,150.06 ₹1,97,170.92 | 7,140 ₹2,28,908.4 |
| 4.00 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources) | 30.49 | sqm | 333.77 ₹10,176.65 | 323 ₹9,848.27 Lowest | 451.4 ₹13,763.19 | 333.77 ₹10,176.65 | 367.5 ₹11,205.08 |
| 5.00 | Diluting and injecting chemical emulsion for post constructional anti-termite treatment (excluding the cost of chemical emulsion) : Treatment of soil under existing floors using chemical emul?sion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 549.97 | sqm | 230.54 ₹1,26,790.08 | 224 ₹1,23,193.28 Lowest | 320 ₹1,75,990.4 | 230.54 ₹1,26,790.08 | 252 ₹1,38,592.44 |
| 6.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 153.34 | cum | 7,527.78 ₹11,54,309.79 | 7,289 ₹11,17,695.26 Lowest | 10,199.2 ₹15,63,945.33 | 7,527.78 ₹11,54,309.79 | 8,400 ₹12,88,056 |
| 7.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu?ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 48.51 | cum | 9,166.55 ₹4,44,669.34 | 8,875 ₹4,30,526.25 Lowest | 12,322 ₹5,97,740.22 | 9,166.55 ₹4,44,669.34 | 9,975 ₹4,83,887.25 |
| 8.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 185.3 | cum | 9,647.37 ₹17,87,657.66 | 9,341 ₹17,30,887.3 Lowest | 13,054 ₹24,18,906.2 | 9,647.37 ₹17,87,657.66 | 10,500 ₹19,45,650 |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete | 145.83 | sqm | 277.16 ₹40,418.24 | 269 ₹39,228.27 Lowest | 374.54 ₹54,619.17 | 277.16 ₹40,418.24 | 283.5 ₹41,342.81 |
| 10.00 | Centering and shuttering including strutting, propping etc. and removal of form for: Lintels, beams, plinth beams, girders, bressumers and cantilevers | 1,023.94 | Sqm | 547.52 ₹5,60,627.63 | 530 ₹5,42,688.2 Lowest | 741.76 ₹7,59,517.73 | 547.52 ₹5,60,627.63 | 577.5 ₹5,91,325.35 |
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
9 Apr 2025, 2:00 pmClosed
MISSION DIRECTOR, SAMAGRA SHIKSHA, ASSAM
Kahilipara
Construction of teachers residential quarter at 1) Kasturba Gandhi Balika Vidyalaya (Type-III), Birshing Jarua (18020332909) in Dhubri district, 2) Kasturba Gandhi Balika Vidyalaya (Type-III), Nayer Alga (18020435502) in Dhubri district
2025_SSA_43671_1
593357/116
Open Tender
Civil Works - Building
Works
180 days
Dhubri
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,790
Yes
₹4.8 L
Yes
O/O THE MD, SS, ASSAM
28 Oct 2025
21 Mar 2025
9 Apr 2025
21 Mar 2025
9 Apr 2025
21 Mar 2025
21 Mar 2025 - 26 Mar 2025
26 Mar 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .