Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC | L1 | Accepted-AOC Low Rate | |
| 2 | L2₹5.2 L+₹1,645 (0.31%)Accepted-AOC | L2 | Accepted-AOC High Rate | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
6 Mar 2018, 1:00 pmClosed
Superintending Engineer, EDC, Mirzapur
Superintending Engineer, EDC, Fataha, Mirzapur
Maintence of Line during Navaratri Mela-2018
2018_PVVNV_159801_1
131/EDC(M)/2017-18
Open Tender
Construction Works
Lump-sum
30 days
Superintending Engineer, EDC
Please refer tender
2 documents required · 2 mandatory
₹525
Executive Engineer (A), EDC
₹6,000
Yes
6 Mar 2018
26 Feb 2018
6 Mar 2018
26 Feb 2018
6 Mar 2018
26 Feb 2018
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .