Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹19.9 L+₹3,502.84 (0.18%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹20.4 L+₹58,380.52 (2.95%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹23.8 L+₹4.0 L (20.0%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹29.2 L
EMD Value
₹58,380
Closing Date
13 Aug 2026, 4:00 pmClosed
Executive Engineer RnB Division Budgam
Engineering Complex Budgam
Restoration of Lanoora Arampora road.
2026_PWDJK_319649_10
NIT_No_63_DB_2026-27
Open Tender
Civil Works
Percentage
30 days
Lanoora
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,100
Executive Engineer RnB Division Budgam
₹58,380
17 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1RCC Culvert | |||||
| 1.01 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 160 | CUM | 592.9 | ₹94,864 |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material All kinds of soil | 115.92 | CUM | 89.75 | ₹10,403.82 |
| 3 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. | 259.2 | KL | 167.8 | ₹43,493.76 |
| 4 | Providing and laying of dry stone soling hand packed in foundation trenches tightly on horizontal including watering, ramming, and all carriages of materials complete. | 19.08 | cuum | 1,000 | ₹19,080 |
| 5 | Providing and laying in position cement concrete specified grade excluding the cost of centering and shuttering- All work upto plinth level.(a)1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) crushed. | 9.99 | CUM | 5,202.9 | ₹51,976.97 |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers abutments, pillars, posts, struts, butteresses, string or laces, courses, parapets, coping, bed blocks, anchor blocks, plain window sills,sunken floors fillets etc. upto floor five level, excluding the cost of centering, shuttering and finishing:1: 2: 4 (1 cement 2 coarse sand 4 graded stone aggregate 20mm nominal Size. | 53.08 | CUM | 8,422.45 | ₹4,47,042.59 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering. shuttering, finishing and reinforcement-All work upto plinth level.1.1.5:3 (1cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) crushed | 28.4 | CUM | 7,788.4 | ₹2,21,159.41 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 18.71 | CUM | 9,821.85 | ₹1,83,717.7 |
| 9Centering and shuttering including strutting, propping etc. and removal of form for• e | |||||
stage.html
html • 0.02 MB
finance_1059644.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_1059644.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .