Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹26.4 LAccepted-AOC VPO SARSANA DISTT HISAR 125001 | HATHRAS | UTTAR PRADESH | 202150 | ₹26.4 L | L-1 | Accepted-AOC L-1 |
| 2 | Rejected-Technical FLAT NO 14 GHS 1 SECTOR 5 MANSA DEVI COMPLEX PANCHKULA HARYANA 134109 | PANCHKULA | PANCHKULA | HARYANA | 134109 | - | - | Rejected-Technical Bid Capacity of the bidder is in Minus |
Tender Value
₹27.6 L
EMD Value
₹55,250
Closing Date
26 May 2026, 12:00 pmClosed
Narender Kumar Payal
Construction Division-II
Construction of Toe wall, providing and fixing of weld mesh galvanized powder coated 1220 ( 4 ft height) of size 2500mmx1220, at Green Belt in front of Sector- 2 Panchkula along National Highway (NH-5)
2026_HRY_523027_1
2026C67E067F 5448 409D 9CE6 FC203AD12F422239003
Open Tender
Civil Works
Works
180 days
Panchkula
2 documents required · 2 mandatory
₹1,000
₹55,250
Yes
8 Aug 2026
20 May 2026
26 May 2026
20 May 2026
26 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 25.86 | cum | 1,863 | ₹48,177.18 |
| 2 | [10.7]Providing and laying of conglomerate floor 50mm thick cement concrete topping 1:2:4 [Through Rate] | 117.3 | Sqm | 216 | ₹25,336.8 |
| 3 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 537.5 | Sqm | 113 | ₹60,737.5 |
| 4 | [11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate] | 792.54 | Sqm | 138 | ₹1,09,370.52 |
| 5 | [11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [Through Rate] | 1,330.03 | Sqm | 88 | ₹1,17,042.64 |
| 6 | [34.50]Painting on Steel Surfaces Providing and applying two coats of ready mix paint of approved brand on steel surface after through cleaning of surface to give an even shade [Through Rate] | 612 | Sqm | 60 | ₹36,720 |
| 7 | [4.1]Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. [Through Rate] | 1,480.9 | Sqm | 6 | ₹8,885.4 |
| 8 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 224.45 | cum | 78 | ₹17,507.1 |
| 9 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 54.8 | cum | 3,975 | ₹2,17,830 |
| 10 | [6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate] | 26.98 | cum | 6,113 | ₹1,64,928.74 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_601955.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .