Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
17 Jul 2026, 9:15 am
DSCO
O/o Divisional Soil Conservation Officer Shaheed Bhagat Singh Nagar
Construction of Stone Masonry Water Recharging and Crate Wire Structure Vill Kular Bhaddi Taunsa and Crate wire structure Vill Banah Majhot and Stone Masonry Retaining wall of pond and Crate wire structure Vill Shahbajpur Teh Balachaur SBS Nagar
2026_DOA_171423_1
DSWC/SBS/2026-27/05
Open Tender
Civil Works
90 days
Kular Bhaddi Taunsa Banah Majhot Shahbajpur
Please refer tender documents
2 documents required · 2 mandatory
₹2,500
₹1.1 L
7 Jul 2026
7 Jul 2026
17 Jul 2026
7 Jul 2026
17 Jul 2026
7 Jul 2026
FINANCIAL BID NO.: DSWC/SBS/2026-27/05
Construction Stone Masonry Water Recharging Structure and Crate Wire Vill- Kular, Bhaddi, Taunsa and crate wire structure Vill- Banah, Majhot and Stone Masonry Retaining Wall of Pond and Crate Wire Structure Vill- Shahbajpur Tehsil Balachaur , Distt. Shaheed Bhagat Singh Nagar, Punjab
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
Estimate sanction no 8604 Dt 09/06/2026 Amount 10,80,100/-
WORK – 1(a) Stone Masonry Water Recharging Structure Vill- Kular, Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 80.22 cum 38.97 Thirty Eight Rupees And Ninety Seven Paise only
2 C:C 1:8:16 in foundation 9.94 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 94.77 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 43.19 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 3.49 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
6 12.5 mm thick cement plaster 1:4 91.35 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand + Bajri 52.53 cum 307.41 Three Hundred Seven Rupees And Fourty One Paise
8 Carriage of gatka + Stone 161.7 cum 320.68 Three Hundred Twenty Rupees And Sixty Eight Paise
WORK – 1(b) Crate Wire Structure Kular, Tehsil Balachaur,Distt SBS Nagar.
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 28 cum 38.97 Thirty Eight Rupees And Ninety Seven Paise only
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 185.38 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 185.38 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 52 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 52 cum 320.68 Three Hundred Twentyt Rupees And Sixty Eight Paise
Estimate sanction no 8612 Dt 09/06/2026 Amount 12,64,000/-
WORK – 2(a) Stone Masonry Water Recharging Structure Vill- Bhaddi, Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 91.44 cum 38.97 Thirty Eight Rupees And Ninety Seven Paise only
2 C:C 1:8:16 in foundation 13.66 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 103.66 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 78.42 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 3.7 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
6 12.5 mm thick cement plaster 1:4 117.83 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 65 cum 232.3 Two Hundred Thirty Two Rupees And Thirty Paise
8 Carriage of bajri 3.33 cum 232.3 Two Hundred Thirty Two Rupees And Thirty Paise
9 Carriage of gatka 13.66 cum 280.91 Two Hundred Eighty Rupees And Ninety One Paise
10 Carriage of boulder 200.29 cum 280.91 Two Hundred Eighty Rupees And Ninety One Paise
WORK – 2(b) Crate Wire Structure Bhaddi, Tehsil Balachaur,Distt SBS Nagar.
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 12 cum 38.97 Thirty Eight Rupees And Ninety Seven Paise only
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 52 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 52 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 12 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 12 cum 280.91 Three Hundred Twentyt Rupees And Sixty Eight Paise
Estimate sanction no 1859 Dt 30/07/2025 Amount 5,05,052/-
WORK – 3 Crate Wire Structure Vill- Bhaddi, Tehsil Balachaur,Distt SBS Nagar.
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 37.5 cum 38.97 Thirty Eight Rupees And Ninety Seven Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 215 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 215 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 62.5 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 62.5 cum 280.91 Two Hundred Eighty Rupees And Ninety One Paise
Total amount for crate wire structure 1,2,3
Estimate sanction no 1861 Dt 30/07/2025 Amount 5,42,814/-
WORK – 4 Crate Wire Structure Vill- Majhot, Tehsil Balachaur,Distt SBS Nagar.
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 30 cum 38.97 Thirty Eight Rupees And Ninety Seven Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 172.5 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 172.5 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 50 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 50 cum 298.57 Two Hundred Ninety Eight Rupees And Fifty Seven Paise
Total amount for crate wire structure 1,2,3 & 4
Estimate sanction no 11711 Dt 10/07/2025 Amount 26,18,000/-
WORK – 5(a) Stone Masonry Water Recharging Structure Vill- Taunsa, Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 E/w in excavation of foundation 75.26 cum 38.98 Thirty Eight Rupees And Ninety Eight Paise only
2 C. Conc. (gatka) In foundation in 1:8:16 8.36 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 C. Conc. (bajri) in 1:2:4 3.57 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
4 Sq rubble masonry in 1:5 in foundation 55.07 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
5 Sq rubble masonry in 1:5 in super structure 93.63 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
6 12.5 mm thick Cement sand plaster in 1:4 99.23 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 51.99 cum 280.91 Two Hundred Eighty Rupees And Ninety One Paise
8 Carriage of bajri 3.21 cum 280.91 Two Hundred Eighty Rupees And Ninety One Paise
9 Carriage of gatka 8.36 cum 280.91 Two Hundred Eighty Rupees And Ninety One Paise
10 Carriage of boulder 163.57 cum 280.91 Two Hundred Eighty Rupees And Ninety One Paise
WORK – 5(b) Crate Wire Structure Vill- Taunsa, Tehsil Balachaur,Distt SBS Nagar.
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 7 cum 38.98 Thirty Eight Rupees And Ninety Seven Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 31 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 31 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 7 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 7 cum 280.91 Two Hundred Eighty Rupees And Ninety One Paise
Estimate sanction no 11707 Dt 10/07/2025 Amount 12,66,800/-
WORK – 6 Crate Wire Structure Vill- Banah, Tehsil Balachaur,Distt SBS Nagar.
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 45 cum 38.97 Thirty Eight Rupees And Ninety Seven Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 336.84 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 336.84 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 92.25 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 92.25 cum 280.91 Two Hundred Eighty Rupees And Ninety One Paise
Total amount for crate wire structure 1,2,3
Estimate sanction no 1077 Dt 09/06/2026 Amount 04,46,000/-
WORK – 7(a) Stone Masonry Retaining Wall in Pond Vill- Shahbajpur, Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 E/w in excavation of foundation 18 cum 38.98 Thirty Eight Rupees And Ninety Eight Paise only
2 C. Conc. (gatka) In foundation in 1:8:16 2.7 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 C. Conc. (bajri) in 1:2:4 0.36 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
4 Sq rubble masonry in 1:5 in foundation 15.3 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
5 Sq rubble masonry in 1:5 in super structure 25.2 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
6 12.5 mm thick Cement sand plaster in 1:4 28.2 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 14.11 cum 241.14 Two Hundred Fourty One Rupees And Fourteen Paise
8 Carriage of bajri 0.32 cum 241.14 Two Hundred Fourty One Rupees And Fourteen Paise
9 Carriage of gatka 2.7 cum 285.33 Two Hundred Eighty Five Rupees And Thirty Three Paise
10 Carriage of boulder 44.55 cum 285.33 Two Hundred Eighty Five Rupees And Thirty Three Paise
WORK – 7(b) Crate Wire Structure Vill- Shahbajpur, Tehsil Balachaur,Distt SBS Nagar.
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 30 cum 38.98 Thirty Eight Rupees And Ninety Seven Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 220.94 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 220.94 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 63.75 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 63.75 cum 285.33 Two Hundred Eighty Five Rupees And Thirty Three Paise
Total Amount (1+2+3+4+5+6+7)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
DNIT05.pdf
Tender Documents • 0.51 MB
FinBid05.xls
Additional Documents • 0.06 MB
Download all tender documents and submit your bid