Loading…
Loading…
Tender Value
₹24.5 L
EMD Value
₹49,000
Closing Date
8 Aug 2026, 3:00 pmClosed
VIMAL KUMAR
Executive Officer
NAGAR PARISHAD DEHRI-DALMIANAGAR
VIMAL KUMAR
Executive Officer
Construction of RCC Drain and PCC Road from Armi Singh house to main Road Sizer Master house , Jitendra ji house to Sushila devi house, Jamuna Singh house to Akshya Pandey House and Bhola Tiwari house to Brajesh Mandal house in ward no.16
137116
NIT 04/2026-27/Gr-17
Open Tender
CIVIL
Rohtas
• Name of the Bidder
• Name of the Firm/Company
• Address of Firm/Company
• PAN Number
• GSTIN
• Registration Certificate No.
• Contacts Details
• Email ID
CIVIL
PERCENTAGE
L1
1
9 documents required · 9 mandatory
₹5,000
Processing Fee: 1180
₹49,000
SAMARAT ASHOK BHAWAN NAGAR PARISHAD CAMPUS
28 Jul 2026
28 Jul 2026
9 Aug 2026
29 Jul 2026
8 Aug 2026
29 Jul 2026
30 Jul 2026
Construction of RCC Drain and PCC Road from Armi Singh house to main Road Sizer Master house , Jitendra ji house to Sushila devi house, Jamuna Singh house to Akshya Pandey House and Bhola Tiwari house to Brajesh Mandal house in ward no.16
ESTIMATED COST :- 2446200
EARNEST MONEY :- 49000
COST OF B.O.Q. :- 5000
BID PROCESSING FEE :- As Per Eproc
TIME OF COMPLITION :- 04 Month
Sl. No. Name of Items Units Quantity Rate
In Figure In Words Amount
1 Earth work in excavation in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m . including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. Per M3 149.99 360.7 Three Hundred Sixty Rupees and Seventy Paisa Only 54101
2 Dismantling of Brick Work…………..Do…………….. Per M3 32.55 823.7 Eight Hundred Twenty Three Rupees & Seventy Paisa only 26811
3 Dismantling of Concrete Work…………..Do……………. Per M3 52.95 970.9 Nine Hundred Seventy Rupees And Ninety Paisa Only 51409
4 Supplying and Filling in plinth with local sand and under floors including, watering , ramming consolidating and dressing complete. Per M3 19.32 287.3 Two Hundred Eighty Seven Rupees And Thirty Paisa Only 5552
5 Supplying and Filling in plinth with local sand and under floors including, watering , ramming consolidating and dressing complete. Per M2 162.75 283.3 Two hundred Eighty Three Rupees & Thirty Paisa only 46107
6 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of Centring ,shuttering, finishing and reinforcement-All work puto plinth level 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size) Per M3 63.8 5418 Five Thousand Four Hundred Eighteen & Sixty Paisa Only 345696
7 Providing and laying factory made chamfered edge Cement Concrete paver blocks of required strength,thickness & size/shape, made by table vibratory method , to attain superior smooth finish using PU or equivalent moulds, laid in required Grey colour & pattern over 50mm thick compacted bed of coarse sand, compacting and proper embedding / laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with jamuna sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks,lawns, drive ways or light traffic parking etc. all complete as per manufacturer’s specifications & direction of Engineer -in-Charge: 80MM THICK M35 Per M2 35.19 906.1 Nine Hundred Six Rupees And Ten Paisa Only 31886
8 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of Centring ,shuttering, finishing and reinforcement-All work puto plinth level 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size) Per M3 74.05 5670 Five Thousand Six Hundred Seventy Rupees And Zero Paisa Only 419864
9 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars TMTC-500-10mm dia. Per Kg 5924 92.60.00 Ninety Two Rupees and Sixty Paisa Only 548562
10 Centring and shuttering including strutting, propping etc. and removal of form for.Foundations, footings, bases of columns etc. for mass concrete. Per M2 130.2 211.6 Two Hundred Eleven Rupees and Sixty Paisa Only 27550
11 Centring and shuttering including strutting, propping etc. and removal of form for.Walls (any thickness) including attached pilasters. Butteresses, plinth and string courses etc. Per M2 390.6 375.1 Three Hundred Seventy Five Rupees And Ten Paisa Only 146514
12 Centring and shuttering including strutting, propping etc. and removal of form for.Suspended floors, roofs, landings, balconies and access platform with water proofply 12 mm thick. Per M2 162.75 437.5 Four Hundred Thirty Seven Rupees & Fifty Paisa Only 71203
13 CARRIAGE OF MATERIAL
(i) BRICKS %O 5254 1367.69 One Thousand Three Hundred Sixty Seven Rupees And Sixty Nine Paisa Only 7186
(ii) LOCAL SAND - M3 21.63 310.46 Three Hundred Ten Rupees And Forty Six Paisa Only 6716
(iii) COURSE SAND M3 59.27 727.5 Seven Hundred Twenty Seven Rupees And Fifty Paisa Only 43121
(iv) STONE CHIPS M3 118.55 2591.81 Two Thousand Five Hundred Ninety One Rupees And Eighty One Paisa Only 307249
(v) CEMENT+Steel MT 61.06 451.27 Four Hundred Fifty One Rupees And Twenty Seven Paisa Only 27554
(vi) Earth Disposel MT 235.49 276.04 Two Hundred Seventy Six Rupees And Four Paisa Only 65005
(vii) Paver Block %O 1337 1591.57 One Thousand Five Hundred Ninety One Rupees And Fifty Seven Paisa Only 2128
(vii) Carrege of Material by Manual Labor EACH 91 388 Three Hundred Eighty Eighty Rupees And Zero Paisa Only 35308
Different Cost of Materials (i) Cement Bags 1103 30.73 Thirty Rupees And Seventy Nine Paisa Only 33895
(ii) Brick %O 5254 270.23 Two Hundred Seventy Rupees And Twenty Three Paisa Only 1420
14 SIAGNIORANG FEE 12404
15 SIGNBOARD AND PHOTO EACH 1 4500 4500
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Nit 04-2026-27.pdf
NIT • 2.88 MB
Nit 04-2026-27.pdf
NIT • 2.88 MB
GR 17.xls
NIT • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .