Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-AOC | ₹11.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹11.6 LSame as L1Rejected-AOC | ₹11.6 LSame as L1 | L2 | Rejected-AOC Rejected |
| 3 | L2₹11.6 LSame as L1Rejected-AOC | ₹11.6 LSame as L1 | L2 | Rejected-AOC Rejected |
| 4 | L2₹11.6 LSame as L1Rejected-AOC | ₹11.6 LSame as L1 | L2 | Rejected-AOC Rejected |
| 5 | L2₹11.6 LSame as L1Rejected-AOC | ₹11.6 LSame as L1 | L2 | Rejected-AOC Rejected |
Tender Value
₹13.6 L
EMD Value
₹13,620
Closing Date
15 May 2026, 2:00 pmClosed
EXECUTIVE OFFICER NAC ATHGARH
Executive Officer NAC Athgarh
Construction of cement concrete road from Raja Sahani house to Jaladhar Rout house in w.no.15
2026_ORULB_128662_10
ATH-NAC-01/2026-27
Open Tender
Civil Works - Roads
Percentage
ATHGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹13,620
Yes
22 Sept 2026
2 May 2026
19 May 2026
2 May 2026
15 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in all kinds of soil including dressing & levelling the bed & depositing soil within initial lead & lift. | 102.6 | Cum | 300.83 | ₹30,865.16 |
| 2 | Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance royalty and taxes of all materials, cost of as per the direction of Engineer-In-Charge. | 74.81 | Cum | 1,475.7 | ₹1,10,397.12 |
| 3 | Providing cement concrete(1:3:6) by using 40mm size hard granite metal(cb) incluidng cost, conveyance & roylaty of all materials etc. | 74.81 | Cum | 5,941 | ₹4,44,446.21 |
| 4 | Providing & laying cement concrete (1:2:4) by using 12mm size hard granite chips(cb) incluidng cost, conveyance & royalty of all materials etc. | 94.34 | Cum | 7,580.6 | ₹7,15,153.8 |
| 5 | Providing rigid & smooth cenetering & shuttering for concrete work. | 130.2 | Sqm | 249.8 | ₹32,523.96 |
| 6 | Removal of Excavated earth by machanical means to an average lead of 5km. | 1 | Cum | 278.77 | ₹278.49 |
stage.html
html • 0.09 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_589320.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 25.87 MB
BOQ_589320.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .