Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | L1 | Accepted-AOC After drawl of transparent lottery | |
| 2 | L1₹4.2 LRejected-AOC | L1 | Rejected-AOC After drawl of transparent lottery | |
| 3 | L1₹4.2 LRejected-AOC AT BAGHUABOL TALCHER DIST ANGUL ODISHA 759100 | ANUGUL | ODISHA | 759100 | L1 | Rejected-AOC After drawl of transparent lottery | |
| 4 | L1₹4.2 LRejected-AOC | L1 | Rejected-AOC After drawl of transparent lottery | |
| 5 | L1₹4.2 LRejected-AOC | L1 | Rejected-AOC After drawl of transparent lottery |
Tender Value
₹4.2 L
EMD Value
₹4,210
Closing Date
7 Jul 2026, 6:00 pmClosed
E.E., R.W. Division-I, Ganjam, Berhampur
O/o the S.E., R.W. Division No.-I, In-front of De-paul School, Engineering School Road, Ganjam, Berhampur, 760010
RI office Karchuli
2026_CERWI_134101_1
OT-06/SERWDG-I/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
30 days
Berhampur
2 documents required · 2 mandatory
₹2,000
₹4,210
Yes
15 Oct 2026
2 Jul 2026
8 Jul 2026
2 Jul 2026
7 Jul 2026
2 Jul 2026
2 Jul 2026 - 6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Wall priming one coat with wall cement priver water bound including Cost, conveyance, taxes of all materials required for the work with all labour, T&P, cess etc complete in all respect as per specification and direction of Engineer-in-Chief.
Ground Floor | 629.1 | sqm | 83.83 | ₹52,737.45 |
| 1.01 | First Floor | 448.22 | sqm | 85.87 | ₹38,488.65 |
| 1.02 | Second Floor | 468.95 | sqm | 87.99 | ₹41,262.91 |
| 1.03 | Head Room | 270.18 | sqm | 90.16 | ₹24,359.43 |
| 1.04 | Compound Wall | 341.35 | sqm | 83.83 | ₹28,615.37 |
| 2 | Distempering two coats over one coat of primer to make an even finished surface in all floors and heights to wall surface of approved make and shade including sand papering, applying putty wherever necessary & cost of scaffloding, staging charges with cost, conveyance taxes of all materials cost of all labour T&P etc complete as per the direction of Engineer-in-Charge.
Ground Floor | 60.64 | sqm | 91.91 | ₹5,573.42 |
| 2.01 | First Floor | 256.98 | sqm | 94.06 | ₹24,171.54 |
| 2.02 | Second Floor | 268.21 | sqm | 96.26 | ₹25,817.89 |
| 2.03 | Head Room | 133.49 | sqm | 98.55 | ₹13,155.44 |
| 3 | Finishing wall surface with two coats of approved quality of weather coat of approved shade over a coat of primer including cost,conveyance, royalities, taxes, cess of all materials, labour, T&P etc.Complete as per direction of Engineer-in-Charge.
Ground Floor | 568.46 | sqm | 102.38 | ₹58,198.93 |
stage.html
html • 0.10 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_599268.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 29.31 MB
Tendernotice_1.pdf
PDF • 3.52 MB
BOQ_599268.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .