Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | L1 | Accepted-Finance Being lowest bidder | |
| 2 | L2₹1.6 L+₹2,205 (1.43%)Rejected-Finance | L2 | Rejected-Finance Not being lowest bidder | |
| 3 | L3₹1.6 L+₹4,165 (2.71%)Rejected-Finance BHAGWATI NAGAR JAMMU | L3 | Rejected-Finance Not being lowest bidder |
Tender Value
Refer Docs
Closing Date
22 Sept 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer MID Jammu
Repair/replacement of worn out parts of 5 cusec pumping unit no.3 along with allied works at Upper Malpur and Repair/replacement of worn out parts of 11 cusec pumping unit no. 3 along with allied works at LIS Gurah Pattan.
2021_IFC_138952_1
MID/J/e-NIT/2021-22/70
Open Tender
Repair and Maintenance Works
Lump-sum
10 days
Upper malpur Gurah Pattan
As per tender notice
7 documents required · 7 mandatory
₹200
Executive Engineer MID Jammu
Exempted
Jammu
7 Oct 2021
11 Sept 2021
23 Sept 2021
11 Sept 2021
22 Sept 2021
17 Sept 2021
11 Sept 2021 - 22 Sept 2021
16 Sept 2021
180 days
Amount
Repair/replacement of worn out parts of 5 cusec pumping unit no.3 along with allied works at Upper Malpur.
Decoupling of 5cusec x 15m head horizontal end casing pump of unit no.3 from the motor assembly and dismantling the pump from the base frame. Carriage of the dismantled 5cusec pump set by using manual labour, head load to the nearest roadside, loading in transport vehicle, carriage to the workshop in the mechanical transport for repairs. Repair to 5cusec horizontal casing pump set at workshop by way of dismantling and extraction of damaged internal parts. Providing/fitting of new shaft as per sample and turning, rethreading & finishing to accurate size of new pump shaft as per specifications of old broken pump shaft. Job includes repairs to impeller by way of brazing, welding, machining, making key ways slots on the impeller and fitting of the same on the pump shaft. Providing and fitting of new bushes-2 Nos., new check nut, new gland rings, new bearings as per sample, new studs/bolts on it, applying sufficient amount of grease to avoid excessive wear and tear, gland packing as per requirement, complete assembling of pump set after carrying out necessary repairs. Shifting back to the LIS at Upper Malpur after carrying out necessary repairs at workshop and then fitting/reinstallation at the base frame, coupling with the motor by making proper alignment and testing on partial/full load. Complete job including cost of material and labour charges etc. C/job
Rebate on Old Parts
Repair/replacement of worn out parts of 11 cusec pumping unit no. 3 along with allied works at LIS Gurah Pattan.
Decoupling of 11 cusec x 45m head Horizontal split casing pump of unit no.3 from the motor assembly and dismantling the pump from the base frame. Carriage of the dismantled 11cusec Split casing pump set by using manual labour, head load to the nearest roadside, loading in transport vehicle, carriage to the workshop in the mechanical transport for repairs. Repair to 11 cusec x 45m head Split casing pump set at workshop by way of dismantling and extraction of damaged internal parts. Providing & fitting of new impeller in place of damaged one as per sample. Job includes repairs to pump shaft by way of welding, turning, aligning, threading at ends and making of new keyways and straightening of the same to proper size. Providing and fitting of new bushes-2 Nos., new check nut, new gland rings, new bearings as per sample, new studs/bolts on it, applying sufficient amount of grease to avoid excessive wear and tear, gland packing as per requirement, complete assembling of pump set after carrying out necessary repairs. Shifting back to the LIS Gurha Pattan after carrying out necessary repairs at workshop and then fitting/reinstallation at the base frame, coupling with the motor by making proper alignment, necessary fittings and then testing on partial/full load. Complete job including cost of material and labour charges etc. C/job
Rebate on Old Parts
TRIKUTA ELECTRICAL AND MECHANICAL WORKS
BEE AAR ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .