Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Qualified 2 A 31 CHOPASANI HOUSING BOARD JODHPUR RAJASTHAN 342008 | JODHPUR | RAJASTHAN | 342008 | Qualified MSE, MII, Category: General |
| 2 | Qualified MEHTA SAREE STORE ADARSH MOHALLA TRIPOLIA BAZAR JODHPUR RAJASTHAN 342001 | JODHPUR | RAJASTHAN | 342001 | Qualified MSE, MII, Category: SC |
| 3 | Qualified | Qualified MII |
| 4 | Qualified PLOT NO 24 D WINDSTREAM ENERGY TECHNOLOGIES INDIA PRIVATE LIMITED HARDWARE PARK KANCHA IMARATH RAVIRYAL VILLAGE MAHESWARAM MANDAL | Qualified MSE, MII, Category: General |
| 5 | Disqualified 0 ARSAWAN DAUDCHAK ARSAWAN TANDA AMBEDKAR NAGAR UTTAR PRADESH 224190 | AMBEDKAR NAGAR | UTTAR PRADESH | 224190 | Disqualified MSE, MII, Category: General |
Tender Value
₹3.8 Cr
EMD Value
Exempted
Closing Date
5 Jun 2024, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Supply of Solar PV Module and allied accessories as per Appx A and B of technical specifications attached at Latok and Lukrep
Supply of Hybrid Invertor as per Appx B of technical specifications attached at Latok and Lukrep
Supply of Battery as per Appx B of technical specifications attached at Latok and Lukrep
Supply of Wind Turbine as per Appx B of technical pecifications attached at Latok and Lukrep
Supply of Module Mounting Structure as per Appx B of technical pecifications attached at Latok and Lukrep
Supply of Wind Charger Controller as per Appx B of technical specifications attached at Latok and Lukrep
Supply of Wind Turbine Mounting structure as per Appx B of technical specifications attached at Latok and Lukrep
Supply of Storage Shelter as per Appx B of technical specifications attached at Latok and Lukrep
Supply of Earthing and Lightning Arrester as per Appx B of technical pecifications attached at Latok and Lukrep
Supply of Array Junction Box or ACDB as per Appx B of technical pecifications attached at Latok and Lukrep
Supply of Cable copper till inverter as per Appx B of technical pecifications attached at Latok and Lukrep
Transportation and installation complete project as per specifications attached at Latok and Lukrep
Supply of DG Set as per Appx B of technical pecifications attached at Latok and Lukrep BOQ Title BOQHP2
6403026
GEM/2024/B/4944008
Two Packet Bid
Supply of Solar PV Module and allied accessories as per Appx A and B of technical specifications at
90 days
West Bengal; Darjeeling
Total value wise evaluation
BOQ
8 documents required · 8 mandatory
3 yrs
₹3
80%
Exempted
6 Jun 2024
14 May 2024
5 Jun 2024
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) | Spec |
|---|---|---|---|---|---|---|---|
| 1 | Supply of Solar PV Module and allied accessories as per Appx A and B of technical specifications attached at Latok and Lukrep | As per technical specifications attached | 2 | Set | Darjeeling | 90 | - |
| 2 | Supply of Hybrid Invertor as per Appx B of technical specifications attached at Latok and Lukrep | As per technical specifications attached | 2 | Nos | Darjeeling | 90 | |
| 3 | Supply of Battery as per Appx B of technical specifications attached at Latok and Lukrep | As per technical specifications attached | 2 | Set | Darjeeling | 90 | |
| 4 | Supply of Wind Turbine as per Appx B of technical pecifications attached at Latok and Lukrep | As per technical specifications attached | 8 | Nos | Darjeeling | 90 | |
| 5 | Supply of Module Mounting Structure as per Appx B of technical pecifications attached at Latok and Lukrep | As per technical specifications attached | 2 | Set | Darjeeling | 90 | |
| 6 | Supply of Wind Charger Controller as per Appx B of technical specifications attached at Latok and Lukrep | As per technical specifications attached | 8 | Nos | Darjeeling | 90 | - |
| 7 | Supply of Wind Turbine Mounting structure as per Appx B of technical specifications attached at Latok and Lukrep | As per technical specifications attached | 8 | Nos | Darjeeling | 90 | |
| 8 | Supply of Storage Shelter as per Appx B of technical specifications attached at Latok and Lukrep | As per technical specifications attached | 2 | Nos | Darjeeling | 90 | |
| 9 | Supply of Earthing and Lightning Arrester as per Appx B of technical pecifications attached at Latok and Lukrep | As per technical specifications attached | 12 | Set | Darjeeling | 90 | |
| 10 | Supply of Array Junction Box or ACDB as per Appx B of technical pecifications attached at Latok and Lukrep | As per technical specifications attached | 8 | Set | Darjeeling | 90 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_6403026.pdf
GEM_BID
techspecification_2024-05-14-23-13-31_040788e0185247edca33c61211cd9688.pdf
BOQ
boq_item_sample_file_2024_2024-05-14-23-13-31_70b669ffa7aaa918d87f002c56c4e5b3.csv
BOQ
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .