| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.2 LAccepted-AOC | L1 | Accepted-AOC Found lowest one bidder | |
| 2 | L2₹40.7 L+₹1.6 L (3.96%)Rejected-AOC | L2 | Rejected-AOC Quoted high rate as compared to L1 | |
| 3 | L3₹40.9 L+₹1.7 L (4.39%)Rejected-AOC | L3 | Rejected-AOC Quoted high rate as compared to L1 | |
| 4 | L4₹42.9 L+₹3.7 L (9.49%)Rejected-AOC | L4 | Rejected-AOC Quoted high rate as compared to L1 | |
| 5 | L5₹64.7 L+₹25.5 L (65.0%)Rejected-AOC | L5 | Rejected-AOC Quoted high rate as compared to L1 |
Tender Value
₹42.9 L
Closing Date
4 Dec 2021, 2:00 pmClosed
Executive Engineer
Rural Engineering Wing Leh
Interlocking tiles of Link road from highway to usman bagh at Rambirpur and Interlocking tile of link road from Dawa Tsering to Thang (P-I)
2021_RDD_5343_4
NIT 111 UTLeh REW od 2021-22
Open Tender
Civil Works - Others
Item Rate
90 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
Executive Engineer
Exempted
10 Dec 2021
27 Nov 2021
7 Dec 2021
27 Nov 2021
4 Dec 2021
27 Nov 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1 Osqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil
Providing and laying dry stone soling pitching in horizontal layers including cost of stone
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size
Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge.
Centring and shuttermg including strutting, propping etc. and removal of form for· Foundations: footings, bases of columns etc. for mass concrete
Centring and shuttermg including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts
Providing and laying 12 inch Ms pipe and filling of available earth including cost of pipe and carriage complete job
Providing and laying 2 foot dia hume pipe and filling of earth including cost of pipe and carriage complete job
supply anti freezing chemical during execution of work
carriage of soling stone average lead 7km by mechanical transport
Carriage of sand and aggregate average lead 7km by mechanical transport
Carriage of cement average lead 20km by mechanical transport
MOHAMMAD HANEEF
M/S ASHRAF HUSSAIN
M/S TASHI TARGAIS
M/S TSEWANG DORJEY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .