Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹98.0 LAdmitted-Finance | -34.53% | ₹98.0 L | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹23.1 L (23.6%)Admitted-Finance DUNIYAGANJ DUNIYAGANJ PHULPUR PHULPUR ALLAHABAD UTTAR PRADESH 212402 | PRAYAGRAJ | UTTAR PRADESH | 212402 | -19.10% | ₹1.2 Cr+₹23.1 L (23.6%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹24.5 L (25.0%)Admitted-Finance | -18.18% | ₹1.2 Cr+₹24.5 L (25.0%) | L3 | Admitted-Finance |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
22 Jun 2026, 3:00 pmClosed
EE DMD-2 DDA OFFICE CENTRAL NURSERY SEC-5 DWARKA
EE DMD-2 DDA OFFICE CENTRAL NURSERY SEC-5 DWARKA
Rejuvenation of water body having Khasra no. 0/46 in village Pandwalan Khurd, Khasra no. 65 in village Hasanpur and Khasra no. 192 in village paprawat under jurisdiction of DMD-II,Dwarka
2026_DDA_913356_1
12/EE/DMD-II/DDA/2026-27
Open Tender
Civil Works
Works
60 days
EE DMD-2 DDA OFFICE CENTRAL NURSERY SEC-5 DWARKA
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹3.0 L
15 Jul 2026
16 Jun 2026
22 Jun 2026
16 Jun 2026
22 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Temporary installation of diesel pump(s) set(s) having cumulative capacity of 64KL/H as per requirement and as per direction of Engineer-in-charge for dewatering of water body complete in all respect with cost of service of operating staff, Cost of lubricating oil, diesel, other consumables for running the machinery and disposal of water up to surface drain. | 173 | per hr | 2,262.5 | ₹3,91,412.5 |
| 2 | Deployment of Poclain having boom length 17m to 32m including operation on hourly basis for excavation from the bed of the drain including in or under water or liquid mud including surfacing, levelling, dressing of the excavated surface and disposal of excavated material on outer periphery of banks or as per direction of Engineer-in-charge complete. The rates are inclusive of initial and final shifting of machine, shifting during work at site, cost or diesel, operator, all machine parts oil, lube etc. all complete. | 240 | per hr | 2,787.6 | ₹6,69,024 |
| 3 | Deploying the hydraulic excavator /JCB for collecting the malba, waste material of all kinds including malba, building rubbish silt,etc and levelling the ground including the cost of services of operating staff, Cost of lubricating oil, diesel ,other consumables for running the machinery etc. complete in all respect as per direction of Engineer-in-charge. | 320 | per hr | 1,382.15 | ₹4,42,288 |
| 4 | Supplying and stacking at site :
A) Good earth | 1,697 | cum | 775.5 | ₹13,16,023.5 |
| 5 | Extra for compaction of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density) | 1,697 | cum | 24.85 | ₹42,170.45 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-lll) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 11 | cum | 6,518.6 | ₹71,704.6 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : :
a) 1:2:4 (1 Cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 10 | cum | 7,878.5 | ₹78,785 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : :
A) 1:3:6 (1 Cement : 3 coarse sand (zone-lll) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 11 | cum | 7,294.7 | ₹80,241.7 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-lll) including manufactured sand derived from Recycled Concrete Aggregate (RCA) upto 25% : 3 graded stone aggregate 20 mm nominal size including Recycled Concrete Aggregate (RCA) upto 25%). | 143 | cum | 8,127.8 | ₹11,62,275.4 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for:
a) Lintels, beams, plinth beams, girders, bressumers and cantilevers | 173 | sqm | 736.4 | ₹1,27,397.2 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_959859.xls
BOQ • 0.35 MB
nit12.pdf
Tender Documents • 1.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .