| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 176001 | -14.99% | ₹5.9 L | L1 | Admitted-Finance |
| 2 | L2₹6.0 LAdmitted-Finance HIMACHAL PRADESH | -13.20% | ₹6.0 L | L2 | Admitted-Finance |
| 3 | L3₹6.2 LAdmitted-Finance HIMACHAL PRADESH HP | -11.00% | ₹6.2 L | L3 | Admitted-Finance |
| 4 | L4₹6.6 LAdmitted-Finance CHENAB VALLEY DIVISION HPPWD UDAIPUR HIMACHAL PRADESH | CHAMBA | HIMACHAL PRADESH | 176207 | -5.20% | ₹6.6 L | L4 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹13,930
Closing Date
3 Jul 2026, 9:00 amClosed
Executive Engineer HPPWD Shimla Division No. III
E.E. Shimla DIVISION NO. III, HPPWD, Shimla-3
CO Ambulance road from cart road to Forensic in Medicine department Medical College IGMC Shimla.
2026_PWD_137567_1
SD-III-4819-35dt.20-06-2026
Open Tender
Civil Works - Buildings
30 days
IGMC
As per SBD
9 documents required · 9 mandatory
₹350
₹13,930
6 Jul 2026
25 Jun 2026
3 Jul 2026
25 Jun 2026
3 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 69.29 | Per Cubic Metre | 975 | ₹67,557.75 |
| 2 | Disposal of Muck Excavated earth/Removal of slipes/ Malwa/Similar unserviceable, dismantle or waste materials by mechanical transport, including loading unloading& Disposal upto all leads and lifts including arranging the dumping sites at its own cost and taxes etc. the payment shall be made at dumping site by contractor for dumping site arranged by contractor at private properrty as per direction of Engineer-in-Charge (Clearing of catchpit) | 69.29 | Per Cubic Metre | 636 | ₹44,068.44 |
| 3 | Excavation in earth work etc., in all kinds of soils including spade work, saturated soil,pick work, jumper work, blasting & chiselling / wedging out rock etc.and pumping or bailing out water including dressing of side and beds and stacking of serviceable materials and disposal of surplus earth in all leads and disposed earth to the levelled and neatly dressed including carriage of materials all lead and lifte as per direction of Engineer-in-charg as directed by Engineer-in-charge | 17.71 | Per cubic Metre | 297 | ₹5,259.87 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Vertical memebers complete including carriage of materials in all leads and lifts | 32.15 | Per Square Metre | 297 | ₹9,548.55 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level (i) 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) including carriage of all labour equipments and materials to various location through all modes of transportation within all leads, lifts and other incidential charges. | 63.53 | Per Cubic Metre | 5,508 | ₹3,49,923.24 |
| 6 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works complete including carriage of materials within all leads and lifts. | 2,027.4 | Per Kilogramme | 89 | ₹1,80,438.6 |
| 7 | Paintind with synthetic enamel paint on wood of approved brand and manufacture of required colour to give an even shade One or more coats on old work | 41.18 | Per Square metre | 55 | ₹2,264.9 |
| 8 | Providing and laying precast pre-polished 25mm thick checkered tiles hydraulic compressed / polished of NTC make or equivalent of approved shade & patterrn in Treads of steps not exceeding 30 cm in width on a bed of 25 mm average thickness of cement mortar 1:6 (1 cement:6 sand) jointed with neat cement slurry mixed with pigment to match the shade of tiles (wherever required) complete with tiles of medium shades.including carriage of materials within all leads and lifts | 42 | Per Square metre | 890 | ₹37,380 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_203622.xls
BOQ • 0.33 MB
SBD696442.pdf
Tender Documents • 2.06 MB
Download all tender documents and submit your bid