| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.0 LAccepted-AOC 164 A 11 GALI NO 3 RISHI NAGAR KAITHAL 136027 | KAITHAL | HARYANA | 136027 | L1 | Accepted-AOC L1 | |
| 2 | L2₹29.6 L+₹5.7 L (23.7%)Rejected-Finance 62 PINK ROSE COLONY KAIMARI ROAD 125001 | HISAR | HARYANA | 125001 | L2 | Rejected-Finance L2 |
Tender Value
₹27.2 L
EMD Value
₹54,464
Closing Date
17 May 2021, 5:00 pmClosed
EXECUTIVE ENGINEER ELECT.DIV.PWD B AND R HISAR
EXECUTIVE ENGINEER ELECT.DIV.PWD B AND R HISAR
CONSTRUCTION OF 4 LANNING HISAR MANGALI SHARWA ROAD FROM SOUTHERN PERIPHERI ROAD HISAR TO CITY LIMIT IN HISAR DISTRICT RD 0.00 TO 2.730 KM (CM ANNOUNCMENT NO. 18225 DT. 08.11.2016) (PDG. SHIFTING OF HT/ LT LINES ONLY).
2021_HRY_168813_2
WD/Elect-GGN/Elect-HSR/100159
Open Tender
Electrical Works
Works
120 days
hisar
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹54,464
22 Dec 2021
6 May 2021
18 May 2021
6 May 2021
17 May 2021
6 May 2021
Amount
A. New Materials: Supply of PCC pole 11 meters long as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of PCC pole 9 meters long as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of 11 KV Top Hamper as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of 11 KV Pin Insulator Polymeric type as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of 11 KV Disc Insulator B&S Type as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of V shape X Arm 75 x40 x 6 mm2 as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of Disc for Stay as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of ACSR 3 SWG as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of GSL 8 SWG as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of Stay wire 7/8 SWG as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of Lighting Arrestor 11 KV as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of 11 KV GO Switch as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of Stay Set 8' long as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of Earthing Set Complete materials as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of GI nuts Bolts off Size as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of Back Clamp/ Half Clamp of GI complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of Full Clamp/ MS Flate 50 x6 complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of Channel X Arm 100 x 50 x6 mm2 as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of Channel X Arm 75 x 50 x 6 for RD Fuse Unit as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of Angel Iron 50 x 50 x 6 as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of Angel 50 x 50 x 6 for 2860m (Brasing H pole) as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of Angel 50 x 50 x 6 for 2200m (Belting H pole) as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of LT XL Ard Cable 3.5/C 95 mm2 as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of LT XL Ard Cable 4/C 50 mm2 as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of Number Plate with Clamp as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of Danger plate with Clamp as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of LT Fuse Board as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of LT Insulator Complete as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of Egg Insulator as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
A. New Materials: Supply of Transformer Plate Form set as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work.
B: Errection of materials as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work. E/O PCC H- pole 11 M long
B: E/O PCC H- pole 9 M long
B: E/O H- pole structure with 2 stay
B: E/O ACSR 50 mm2
B: E/O 100 KVA T/F with Pole
B: E/O Stay Set 8' Long complete
B: E/O LT XLPE Ard Cable 3.5 core/ 95 mm2
B: E/O LT XLPE Ard Cable 4 core/ 50 mm2
B: E/O 2 core PVC 10 mm 2 upto 20 M
B: E/O 2 core PVC 10 mm 2 upto 30 M
B: E/O single Phase Meter with MC
B: E/O RD Fuse Unit
B: E/O LA
B: E/O GI Strip
B: Earth Boaring
B: Loading unloading & Transportation charges for 9 M Long pole
B: Loading unloading & Transportation charges for 11 M Long pole
C: Dismentalling of materials as per specifications of DHBVN complete in all respect upto the entire satisfaction of the Engineer in Charge of work. Dismentalment of PCC pole 9 M long
C: Dismentalment of 11 KV AB Cable 95 mm2
C: Dismentalment of ACSR 6 SWG
C: Dismentalment of LT AB Cable 3 x 50 + 35 mm2
C: Dismentalment of 4/C Cable 50 mm2
C: Dismentalment of 2/C 10mm2 to 20 mtrs
C: Dismentalment of 2/C 10mm2 to 30 mtrs
C: Dismentalment of Single Phase Meter with MCB
C: Dismentalment of 100 Kva T/F with pole
C: Dismentalment of LT Fuse Board
C: Dismentalment of RD Fuse unit
C: Dismentalment of HT Pole Structure complete with 2 Stay
J.B.S.Electrical Co.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .