Tender Value
₹5.2 Cr
EMD Value
₹4.1 L
Closing Date
10 Apr 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
PLANING
13 conditions · 1 needing a document upload
The firm must be the manufacturer of MPCS of their own make of MPCS units i.e. OEM, In this case OEM is M/s MEDHA SERVO DRIVES PVT.LTD.
As per Railway Bd's letter No.2019/Elect(G)/165/1 dated 22.04.2020, technical eligibility criteria is dispensed for OEM.
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
74 conditions · 5 needing a document upload
All the schedule rates are inclusive of GST charges.
In case of increase or decrease in GST rate, same will be either paid by Railway or recovered from the firm as the case may be.
Tenderers will examine the various provisions of the Central Goods and Services Tax Act.2017(CGST)/Integrated Goods and Services Tax Act.2017(IGST)/Union Territory Goods and Services Act.2017(UGST)/respective state's State Goods and Services Tax Act (SGST) also, as notified by Central/State Govt. & as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates. Credit (ITC) likely to be availed by them is duly considered while quoting rates.
The successful tenderer who is liable to be registered under CGST/IGST/UGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UGST/SGST Act to railway immediately after the award of contract, without which no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority.
In case the successful tenderer is not liable to be registered under CGST/IGST/ UGST/SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority.
Tenderer has to upload GST registration certificate.
Mandate form should be uploaded as per attached format.
Tenderers are required to upload their Permanent Account Number(PAN) card.
Declaration of proprietorship/partnership firm and necessary document should be submitted along with tender.
Employment/Partnership etc. of Retired Railway Employees: (a) Should a tenderer i) be a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, whether in the executive or administrative capacity or whether holding a pensionable post or not, in the Engineering or any other department of any of the railways owned and administered by the President of India for the time being, OR ii) being partnership firm / joint venture (JV) / registered society / registered trust etc. have as one of its partners a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, OR iii) being an incorporated company have any such retired Engineer of the gazetted rank or any other gazetted officer working before his retirement as one of its directors AND in case where such Engineer or officer had not retired from government service at least 1 year prior to the date of submission of the tender THEN the tenderer will give full information as to the date of retirement of such Engineer or gazetted officer from the said service and as to whether permission for taking such contract, or if the Contractor be a partnership firm or an incorporated company, to become a partner or director as the case may be, has been obtained by the tenderer or the Engineer or officer, as the case may be from the President of India or any officer, duly authorized by him in this behalf, shall be clearly stated in writing at the time of submitting the tender. b) In case, upon successful award of contract, should a tenderer depute for execution of the works under or to deal matters related with this contract, any retired Engineer of gazette rank or retired gazetted officer working before his retirement in the Engineering or any other department of any of the railways owned and administered by the President of India for the time being, and now in his employment, then the tenderer will ensure that retired Engineer or retired gazetted officer had retired from government service at least 1 year prior to the date of his employment with tenderer and in case he had retired from service within a year then he possesses the requisite permission from the President of India or any officer, duly authorized by him in this behalf, to get associated with the tenderer. c) Should a tenderer or Contractor being an individual, have member(s) of his family or in the case of partnership firm/company / joint venture (JV) / registered society / registered trust etc. one or more of his partner(s)/shareholder(s) or member(s) of the family of partner(s)/shareholder(s) having share of more than 1% in the tendering entity employed in gazetted capacity in the Engineering or any other department of the railway, then the tenderer at the time of submission of tender, will inform the authority inviting tenders the details of such persons. Note:-If information as required as per a), b), c) above has not been furnished, contract is liable to be dealt in accordance with provision of clause 62 of Standard General Condition of Contract.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
This tender is governed by General Condition of Contract for Works (2022) issued by Railway Board with latest amendments. All terms & conditions of the tender document will be governed by GCC for Works-2022 with all correction slips. The General Condition of Contract works can be seen on Railway board website www.indianrailways.gov.in. Any terms of the tender contradicts the terms of GCC (Works), in such case GCC for works-2022 will prevail. Tenderer must go through General Conditions of Contract for works, available online before quoting the rates.
The intending tenderer is advised to study the tender papers carefully and also acquaint himself with the nature of work and the matters pertaining there to. Submission of tender shall be deemed to have done after careful study and examination of tender papers with full understanding of implications thereof.
All offers shall be uploaded in the website through authorized digital signature of bidders/contractors along Bid Security/Earnest money deposit (EMD). EMD can be directly paid through online gateway facility provided in www.ireps.gov.in portal within stipulated date and time of tender closing. IREPS website should be monitored for any update or changes. Noncompliance with any of the conditions set forth therein above is liable to result in the tender being rejected.
The tenderers shall keep the offer open for a minimum period as mentioned in NIT from the date of opening of the tender, within which period the tenderers can not withdraw their offer, subject to the period being extended further if required, by mutual agreement from time to time. Any intervention of the above condition will make the tenderer liable for forfeiture of his security deposit for due performance of the foregoing stipulation.
Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he entered in the tender form are adequate and all inclusive to accord with the provisions in clause-37 of the General Conditions of Contract for the completion of work to the entire satisfaction of the engineer.
Execution of Contract Document: The Tenderer whose tender is accepted shall be required to appear in person at the office of Sr. DME/TRS/IPTE or concerned Engineer, as the case may be, or if tenderer is a firm or corporation, a duly authorized representative shall appear and execute the contract agreement within seven days of notice from Railways that the Contract Agreement is ready. The Contract Agreement shall be entered into by Railway only after submission of valid Performance Guarantee by the Contractor. Failure to do so shall constitute a breach of the agreement affected by the acceptance of the tender. In such cases the Railway may determine that such tenderer has abandoned the contract and there upon his tender and acceptance thereof shall be treated as cancelled and the Railway shall be entitled to forfeit the full amount of the Earnest Money and other dues payable to the Contractor under this contract. The failed Contractor shall be debarred from participating in the retender for that work.
Tender credential: The railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities hereunder not will it affect any rights of the railway there under.
(a) In case of any information submitted by tenderer is found to be false forged or incorrect at any time during process for evaluation of tenders, it shall lead to forfeiture of the tender Earnest Money Deposit/Bid security besides banning of business for a period of upto two years. (b) In case of any information submitted by tenderer is found to be false forged or incorrect after the award of contract, the contract shall be terminated. Bid Security, Performance Guarantee and Security Deposit available with the railway shall be forfeited. In addition, other dues of the contractor, if any, under this contract shall be forfeited and agency shall be banned for doing business for a period of upto two years.
Rights of the Railway to deal with Tender: The authority for the acceptance of the tender will rest with the Railway. It shall not be obligatory on the said authority to accept the lowest tender or any other tender, and tenderer(s) shall neither demand any explanation for the cause of rejection of his/ their tender nor the Railway to assign reasons for declining to consider or reject any particular tender or tenders.
Provisions of Make in India Policy 2017 issued by Govt. of India, as amended from time to time, shall be followed for consideration of tenders.
If the tenderers deliberately gives/give wrong information in his/ their tender or creates/create circumstances for the acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage.
If any partner(s) of a partnership firm expires after the submission of its tender or after the acceptance of its tender, the Railway shall deem such tender as cancelled/contract as terminated under clause 61 of the Standard General Conditions of Contract, unless the firm retains its character as per partnership agreement. If a sole proprietor expires after the submission of tender or after the acceptance of tender, the Railway shall deem such tender as cancelled / contract as terminated under clause 61 of the Standard General Conditions of Contract.
Law Governing The Contract: The contract shall be governed by the law for the time being in force in the Republic of India.
Communications To Be In Writing : All notices, communications, reference and complaints made by the Railway or the Engineer or the Engineer's Representative or the Contractor inter-se concerning the works shall be in writing and no notice, communication, reference or complaint not in writing shall be recognized.
Accommodation & Railway Passes: No accommodations shall be given to any contractor(s) or staff/supervisors for the purpose of stay. Also, no Railway pass / PTO shall be given to them.
Earnest Money/Bid security: (1)(a)The tenderer shall be required to submit Bid Security with the tender for the due performance with the stipulation to keep the offer open till such date as specified in the tender, under the conditions of tender. The Bid Security shall be as under: Value of the Work Bid Security For works estimated to cost up to Rs. 1 crore, 2% of the estimated cost of the work. For works estimated to cost more than Rs. 1 crore, Rs. 2 lakh plus ½% (half percent)of the excess of the estimated cost of work beyond Rs. 1 crore subject to a maximum of Rs. 1 crore. Note: (i)The Bid Security shall be rounded OFF the nearest Rs. 100. This Bid Security shall be applicable for all modes of tendering. (ii) Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' shall be exempted from payment of Bid Security detailed above. (iii) Labour Cooperative Societies shall deposit only 50% of above Bid Security detailed above. (1)(b) It shall be understood that the tender documents have been issued to the tenderer and the tenderer is permitted to tender in consideration of stipulation on his part, that after submitting his tender he will not resile from his offer or modify the terms and conditions thereof in a manner not acceptable to the Engineer. Should the tenderer fail to observe or comply with the said stipulation, the aforesaid amount shall be liable to be forfeited to the Railway. (1) (c) If his tender is accepted this Bid Security mentioned in sub clause (a) above will be retained as part security for the due and faithful fulfillment of the contract in terms of Clause 16 of the Standard General Conditions of Contract. The Bid Security of other Tenderers shall, save as herein before provided, be returned to them, but the Railway shall not be responsible for any loss or depreciation that may happen thereto while in their possession, nor be liable to pay interest thereon. (2) The Bid Security shall be deposited either in cash through e-payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure- VIA and shall be valid for a period of 90 days beyond the bid validity period.
In case, submission of Bid Security in the form of Bank Guarantee, following shall be ensured:(i). A scanned copy of the Bank Guarantee shall be uploaded on e- Procurement Portal(IREPS) while applying to the tender. (ii). The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (i.e excluding the last date of submission of bids). Ch.OS of office of Sr.DME/TRS/IPTE is nominatd for acknowledge of letters/documents. (iii). Non submission of scanned copy of Bank Guarantee with the bid on e-tendering portal(IREPS) and/or non submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid. (iv). The Tender Security shall remain valid for a period of 90 days beyond the validity period for the Tender. (v). The details of the BG, physically submitted should match with the details available in the scanned copy and the data entered during bid submission time, failing which the bid will be rejected. (vi). The Bank Guarantee shall be placed in an envelope, which shall be sealed. The envelope shall clearly bear the identification "Bid for the ***** Project" and shall clearly indicate the name and address of the Bidder. In addition, the Bid Due Date should be indicated on the right hand top corner of the envelope.(vii). The envelope shall be addressed to the officer and address as mentioned in the tender document. (viii). If the envelope is not sealed and marked as instructed above, the Railway assumes no responsibility for the misplacement or premature opening of the contents of the Bid submitted and consequent losses, if any, suffered by the Bidder.
Indemnity By Contractors : The Contractor shall indemnify and save harmless the Railway from and against all actions, suit proceedings losses, costs, damages, charges, claims and demands of every nature and description brought or recovered against the Railways by reason of any act or omission of the Contractor, his agents or employees, in the execution of the works or in his guarding of the same. All sums payable by way of compensation under any of these conditions shall be considered as reasonable compensation to be applied to the actual loss or damage sustained, and whether or not any damage shall have been sustained.
Security Deposit: The Security Deposit shall be 5% of the contract value. The Bid Security submitted by the Contractor with his tender will be retained/encashed by the Railways as part of security for the due and faithful fulfillment of the contract by the Contractor. Provided further that, if Contractor submits the Cash or Term Deposit Receipt issued from a Scheduled commercial bank of India or irrevocable Bank Guarantee Bond from a Scheduled commercial bank of India, either towards the Full Security Depositor the Part Security Deposit equal to or more than Bid Security, the Railway shall return the Bid Security, to the Contractor. Balance of Security Deposit may be deposited by the Contractor in cash or Term Deposit Receipt issued from Scheduled commercial bank of India or irrevocable Bank Guarantee bond issued from Scheduled commercial bank of India, or may be recovered at the rate of 6% of the bill amount till the full Security Deposit is recovered. Provided also that in case of defaulting Contractor, the Railway may retain any amount due for payment to the Contractor on the pending "on account bills" so that the amounts so retained (including amount guaranteed through Performance Guarantee) may not exceed 10% of the total value of the contract. The Irrevocable Bank Guarantee submitted towards Security deposit shall be initially valid up to the stipulated date of Maintenance period plus 60 days and shall be extended from time to time, depending upon extension of contract granted in terms of Clause 17A and 17B of the Standard General Conditions of Contract. Note: Security Deposit deposited in cash by the Contractor or recovered from the running bills of a Contractor or submitted by contractor as Term Deposit Receipt(s) can be refunded/returned to the contractor, in lieu of irrevocable Bank Guarantee bond issued from scheduled commercial bank of India, to be submitted by him, for an amount equal to or more than the already available Security Deposit, provided however that, in a contract of value less than Rs. 50 Crore, such refund/ return of the already available Security Deposit is permitted up to two times and in a contract of value equal to or more than Rs. 50 Crore, such refund / return of the already available Security Deposit is permitted up to three times.
(i). Forfeiture of Security Deposit: Whenever the contract is rescinded as a whole under clause62 (1) of these conditions, the Security Deposit already with railways under the contract shall beforfeited. However, in case the contract is rescinded in part or parts under clause 62 (1) of these conditions, the Security Deposit shall not be forfeited. (ii). No interest shall be payable upon the Bid Security and Security Deposit or amounts payable to the Contractor under the Contract, but Government Securities deposited in terms of Sub-Clause16.(4)(b) of this clause will be payable with interest accrued thereon.
Performance Guarantee : The successful bidder shall have to submit a Performance Guarantee (PG) within 21 (Twenty one) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 21 (Twenty one) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 12% per annum shall be charged for the delay beyond 21(Twenty-one) days, i.e. from 22nd day after the date of issue of LOA. Further, if the 60thday happens to be a declared holiday in the concerned office of the Railway, submission of PG can be accepted on the next working day. In all other cases, if the Contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract is liable to be terminated. In case contract is terminated railway shall be entitled to forfeit Bid Security and other dues payable to the contractor against that particular contract, subject to maximum of PG amount. In case a tenderer has not submitted Bid Security on the strength of their registration as a Startup recognized by Department of Industrial Policy and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shall be informed to this effect. The failed Contractor shall be debarred from participating in retender for that work. However, the clause may also be applicable as amended time to time.
(b) The successful bidder shall submit the Performance Guarantee (PG) in any of the following forms, amounting to 5% of the contract value: (i) A deposit of Cash; (ii) Irrevocable Bank Guarantee; (iii) Government Securities including State Loan Bonds at 5% below the market value; (iv) Pay order and Demand Drafts tendered by any Schedule Commercial Bank of India; (v) Guarantee Bonds executed or Deposits Receipts tendered by any Scheduled Commercial Bank of India; (vi) Deposit in the Post Office Saving Bank; (vii) Deposit in the National Savings Certificates; (viii) Twelve years National Defence Certificates; (ix) Ten years Defence Deposits; (x) National Defence Bonds and (xi) Unit Trust Certificates at 5% below market value or at the face value whichever is less. Also, FDR in favour of FA&CAO (free from any encumbrance) may be accepted.(c)The Performance Guarantee shall be submitted by the successful bidder after the Letter of Acceptance (LOA) has been issued, but before signing of the contract agreement. This P.G. shall be initially valid upto the stipulated date of completion plus 60 days beyond that. In case, the time for completion of work gets extended, the Contractor shall get the validity of P.G. extended to cover such extended time for completion of work plus 60 days. (d) The value of PG to be submitted by the Contractor is based on original contract value and shall not change due to subsequent variation(s) in the original contract value. (e) The Performance Guarantee (PG) shall be released after physical completion of the work based on 'Completion Certificate' issued by the competent authority stating that the Contractor has completed the work in all respects satisfactorily. (f) Whenever the contract is rescinded, the Performance Guarantee already submitted for the contract shall be encashed. (g) The Engineer shall not make a claim under the Performance Guarantee except for amounts which the President of India is entitled under the contract (not withstanding and/or without prejudice to any other provisions in the contract agreement) in the event of: (i) Failure by the Contractor to extend the validity of the Performance Guarantee as described herein above, in which event the Engineer may claim the full amount of the Performance Guarantee. (ii) Failure by the Contractor to pay President of India any amount due, either as agreed by the Contractor or determined under any of the Clauses/Conditions of the Agreement, within 30 days of the service of notice to this effect by Engineer. (iii) The Contract being determined or rescinded under clause 62 of the GCC.
Force Majeure Clause: If at any time, during the continuance of this contract, the performance in whole or in part by either party of any obligation under this contract shall be prevented or delayed by reason of any war, hostility, acts of public enemy, civil commotion, sabotage, serious loss or damage by fire, explosions, epidemics/pandemics, strikes, lockouts or acts of God (hereinafter, referred to events) provided, notice of the happening of any such event is given by either party to the other within 30 days from the date of occurrence thereof, neither party shall by reason of such event, be entitled to terminate this contract nor shall either party have any claim for damages against the other in respect of such non-performance of delay in performance, and works under the contract shall be resumed as soon as practicable after such event has come to an end or ceased to exist, and the decision of the Engineer as to whether the works have been so resumed or not shall be final and conclusive, PROVIDED FURTHER that if the performance in whole or in part of any obligation under this contract is prevented or delayed by reason of any such event for a period exceeding 120 days, either party may at its option terminate the contract by giving notice to the other party.
Extension of Time with Liquidated Damages (LD) for delay due to Contractor: The time for the execution of the work or part of the works specified in the contract documents shall be deemed to be the essence of the contract and the works must be completed not later than the date(s) as specified in the contract. If the Contractor fails to complete the works within the time as specified in the contract for the reasons other than the reasons specified in Clause 17 and 17-A, the Railway may, if satisfied that the works can be completed by the Contractor within reasonable short time thereafter, allow the Contractor for further extension of time as the Engineer may decide. On such extension the Railway will be entitled without prejudice to any other right and remedy available on that behalf, to recover from the Contractor as agreed damages and not by way of penalty for each week or part of the week, a sum calculated at the rate of LD Damages as decided by engineer 0.05% to 0.3% of the contract value of the works for each week or part of the week.
Commencement Of Works :The actual commencement of work shall be considered after completion of existing contracts/extension period of contract for MPCS Ver-2 & Ver-3 (as per applicable). Contractor shall commence the work and shall proceed with the same with due expedition and without delay.
Compliance To Engineer's Instructions: The Engineer shall direct the order in which the several parts of the works shall be executed and the Contractor shall execute without delay all orders given by the Engineer from time to time; but the Contractor shall not be relieved thereby from responsibility for the due performance of the works in all respects.
Damage to Railway Property or Private Life and Property:- The Contractor shall be responsible for all risk to the work and for trespass and shall make good at his own expense all loss or damage whether to the works themselves or to any other property of the Railway or the lives, persons or property of others on account of any negligence of contractor in connection with the works until they are taken over by the Railway and in case the Railway shall be called upon to make good any costs, loss or damages, or to pay any compensation, including that payable under the provisions of the Workmens Compensation Act or any statutory amendments therefore to any person or persons sustaining damages as aforesaid by reason o f any act , or any negligence or omissions on the part of the Contractor the amount of any costs or charges including costs and charges in connection with legal proceedings, which the Railway may incur in reference thereto, shall be charged to the Contractor. The Railway shall have the power and right to pay or to defend or compromise any claim of threatened legal proceedings or in anticipation of legal proceedings being instituted consequent on the action or default of the Contractor, to take such steps as may be considered necessary or desirable to ward off or mitigate the effect of such proceedings charging to Contractor, as aforesaid, any sum or sums of money which may be paid and any expenses whether for reinstatement or otherwise which may be incurred and the propriety of any such payment, Defence or compromise, and the incurring of any such expenses shall not be called in question by the Contractor.
Reporting of Accidents: The Contractor shall be responsible for the safety of all employees directly or through petty Contractors or sub Contractors employed by him on the works and shall report serious accidents to any of them however and wherever occurring on the works to the engineer or the engineers representative and shall make every arrangements to render all possible assistance.
The quality of work will be closely monitored and shall be inspected daily by Railway Authority. The contractor will not employ any unethical practices to compromise the quality of work. Contractor or his men will not use any such means, which will affect the quality of work and may cause damage to Railway property due to such practice, for which contractor will be solely responsible. If any such incident takes place and the Contractor is found responsible, Railways will reserve the right to terminate the Contract immediately.
The submission of a Tender by a tenderer(s) shall be deemed to imply and will be considered as he has read, understood and abided by all the terms and conditions, specification, rules/Laws stated therein.
OTHER CONDITIONS: If there is any item, which is not covered in this tender paper, terms & condition mentioned in General Conditions of Contract (GCC) applicable to works contract of S.E. Railway and the other circulars of Railway Board, Ministry of Railway issued from time to time shall apply. In case there is any contradiction between special condition and general condition of contract, the special terms & condition of contract shall prevail.
Adherence to Specifications: - The whole of the works shall be executed in perfect conformity with the specifications, scope of work and special terms and conditions of contract. If Contractor performs any works in a manner contrary to the specifications or any of them and without such reference to the Sr.DME/TRS/IPTE, he shall bear all the costs arising or ensuing there from and shall be responsible for all losses of the Railway.
Damage from Accidents: The Contractor shall take all precautions against damages from accidents. No compensation will be allowed to the Contractor for his staff, tools, plants, materials, machines and other equipment lost or damaged by any cause whatsoever. The Contractor shall be liable to make good the damages. No claims in this regard will be arbitral.
Dispute in specification: Any dispute arising out of interpretation of Drawings, specifications or any terms and conditions including special condition of the contract or arising during the execution of the work/contract, shall be settled by Railways and his decision shall be final and binding on the contractor/tenderer(s).
TERMINATION OF CONTRACT: As per latest GCC with all of its correction slips to be followed.
The option of payment through LC has been enabled for all tenders published after 06.06.2018 18.00 Hrs whose value is equal to or greater than Rs.10 Lakhs as per board's letter no . 2018/CE-I/CT/9 dated 04.06.2018.
Omissions & Discrepancies:Should a tenderer find discrepancies in or omissions from the drawings or any of the tender forms or should be in doubt as to their meaning, he should at once notify the authority inviting tenders who may issue a corrigendum. It shall be understood that every endeavor has been made to avoid any error which can materially affect the basis of the tender and the successful tenders shall take upon himself and provide for therisk of any error which may subsequently be discovered and shall make no subsequent claim on account thereof.
Shramikkalyan portal:- (i) Contractor is to abide by the provisions of various labour laws in terms of above clause 54,55, 55-A and 55-B of Indian Railways Standard General Conditions of Contract. In order to ensure the same, an application has been developed and hosted on website 'www.shramikkalyan.indianrailways.gov.in'. Contractor shall register his firm/company etc. and upload requisite details of labour and their payment in this portal. These details shall be available in public domain. The registration /updation in Portal shall be done as under: (a)Contractor shall apply for one time registration of his company/firm etc. in the Shramikkalyan portal with requisite details subsequent to issue of Letter of Acceptance. Engineer shall approve the contractor's registration in the portal within 7 days of receipt of such request. (b)Contractor once approved by any Engineer, can create password with login ID (PAN No.) for subsequent use of portal for all Letter of Acceptances (LOAs) issued in his favour. (c)The contractor once registered on the portal, shall provide details of his Letter of Acceptances (LOAs)/ Contract Agreements on Shramikkalyan portal within 15 days of issue of any LoA for approval of concerned Engineer. Engineer shall update (if required) and approve the details of LOA filled by contractor within 7 days of receipt of such request. (d)After approval of LOA by Engineer, contractor shall fill the salient details of contract labours engaged in the contract and ensure updating of each wage payment to them on Shramikkalyan portal on monthly basis. (e)It shall be mandatory upon the contractor to ensure correct and prompt uploading of all salient details of engaged contractual labour & payments made thereof after each wage period. (ii)While processing payment of any 'On Account Bill' or 'Final Bill' or release of 'Advances' or 'Performance Guarantee / Security deposit', contractor shall submit a certificate to the Engineer or Engineer's representatives that "I have uploaded the correct details of contract labours engaged in connection with this contract and payments made to them during the wage period in Railway's Shramikkalyan portal at 'www.shramikkalyan.indianrailways.gov.in' till____Month,____Year.
The firm should ensure that minimum wages is to be paid to their employee as per the extant Government rule. It will be firm's responsibility to resolve the issues if any dispute arises regarding non payment of minimum wages to their employees and Railway will not be responsible for this.
For settlements of disputes Arbitration provision of relevant clauses of S.E.Railway Standard General Conditions of contract of 2022 with up to date correction slip will be followed. Tenderer should comply with all the provisions with respect to labour given in this tender document, IR Standard General Condition Of Contract 2022 updated with correction slips Issued up to date, relevant statues of government w.r.t labour laws.
Powers of Modification to Contract: The Engineer on behalf of the Railway shall be entitled by order in writing to enlarge or extend, diminish or reduce the works or make any alterations in their design, character position, site, quantities, dimensions or in the method of their execution or in the combination and use of materials for the execution thereof or to order any additional work to be done or any works not to be done and the Contractor will not be entitled, to any compensation for any increase/reduction in the quantities of work but will be paid only for the actual amount of work done and for approved materials supplied against a specific order.
i) Unless otherwise specified in the special conditions of the contract, the accepted variation in quantity of each individual item of the contract would be upto 25% of the quantity originally contracted, except in case of foundation work. (ii) The Contractor shall be bound to carry out the work at the agreed rates and shall not be entitled to any claim or any compensation whatsoever upto the limit of 25% variation in quantity of individual item of works. (iii) In case an increase in quantity of an individual item by more than 25% of the agreement quantity is considered unavoidable, then same shall be executed at following rates (a) Quantities operated in excess of 125% but upto 140% of the agreement quantity of the concerned item, shall be paid at 98% of the rate awarded for that item in that particular tender; (b) Quantities operated in excess of 140% but upto 150% of the agreement quantity of the concerned item shall be paid at 96% of the rate awarded for that item in that particular tender; (c) Variation in quantities of individual items beyond 150% will be avoided and would be permitted only in exceptional unavoidable circumstances and shall be paid at 96% of the rate awarded for that item in that particular tender. (d) Variation to quantities of Minor Value Item: The limit for varying quantities for minor value items shall be 100% (as against 25% prescribed for other items). A minor value item for this purpose is defined as an item whose original agreement value is less than 1 % of the total original agreement value. d.(i) Quantities operated upto and including 100% of the agreement quantity of the concerned minor value item, shall be paid at the rate awarded for that item in that particular tender; d.(ii) Quantities operated in excess of 100% but upto 200% of the agreement quantity of the concerned minor value item, shall be paid at 98% of the rate awarded for that item in that particular tender; d.(iii) Variation in quantities of individual minor value item beyond 200% will be avoided and would be permitted only in exceptional unavoidable circumstances and shall be paid at 96% of the rate awarded for that item in that particular tender. (iv) In case of earthwork, the variation limit of 25% shall apply to the gross quantity of earthwork and variation in the quantities of individual classifications of soil shall not be subject to this limit. (v) As far as SOR items are concerned, the limit of 25% would apply to the value of SOR schedule as a whole and not on individual SOR items. However, in case of NS items, the limit of 25% would apply on the individual items irrespective of the manner of quoting the rate (single percentage rate or individual item rate).
Valuation of Variations: The enlargements, extensions, diminution, reduction, alterations or additions referred to in Sub- Clause (2) of this Clause shall in no degree affect the validity of the contract; but shall be performed by the Contractor as provided therein and be subject to the same conditions, stipulations and obligations as if they had been originally and expressively included and provided for in the Specifications and Drawings and the amounts to be paid therefor shall be calculated in accordance with the accepted Schedule of Rates. Any extra items/quantities of work falling outside the purview of the provisions of Sub-Clause (2) above shall be paid for at the rates determined under Clause-39 of these Conditions.
Details of employees engaged by the contractor before commencing the work, contractor shall submit a list of his employees as would be engaged by him for this work with details of names, address, phone No., age, marital status, election ID No. etc. Moreover, police verification of each and every staff/supervisor/supervisor-in-charge to be engaged for this work must be got done by the contractor at his own cost and one copy of police verification certificate must be submitted to SSE/consignee along with the details of the employee before starting the work.
Consignee: SSE nominated by Sr. DME/TRS/IPTN, Sr. DME/TRS/KGP & Sr. DEE/TRS/SRC for the respective locomotives of the sheds will be the consignee.
Contractor should issue Identity cards with provision of hanging over neck to all his labour being engaged to carry out the Work, including the Supervisor. These identity cards should be so carried that Railway Security can identify them. The Identity cards should be hanged over neck by the contractors labour every time, during their presence on Railway Premises.
The contractor shall ensure that his men wear Uniforms with distinguished logo and identification with Cap, Shoes and Hand Gloves at all the time while working.
Supply of Water and Electricity : Water required for the work will be provided by the Railway free of cost through taps available and contractor has to take all possible care to avoid any wastage of water. Provision of Electricity as per GCC.
Payment terms: - The standard payment terms subject to recoveries of any amount under the liquidated damages clause of contract will be as per latest rules. Payment as above shall be subject to any deductions of any amount for which the contractor is liable under the contract against this tender including penalty as specified in penalty clause or any other contract in respect of which the President of India is the contracting authority.
Terms of Payment: 100% payment will be arranged through EFT system as per the enclosed mandate format. The firm is advised to submit the format duly filled in the Bank details and payment will be made after filling the measurement book with acceptance of Sr.DME/TRS/IPTE. The Tenderer shall submit a certified copy of tax submitted as per prevailing rates on the bill value is recoverable from the contract bills, if required.
The total yearly payment shall be made in four equal installments and such installments of the payment shall be made immediately against the bill by the contractor every quarter which is certified by the nominated officer for completion of maintenance.
Delay in payment or non-payment of the contractors bill will under no circumstances be accepted as an excuse for contractor's failure to carry out the work as per the terms and conditions of the contract satisfactorily.
Scope of work for MPCS Ver-2 & Ver-3 is as per RDSO SMI No. RDSO/2016/EL/SMI/0288 (REV.'0') dtd. 21.06.2016. However the scope of work will be followed as per latest guidelines of RDSO if modified during execution of contract. No conditional terms & conditions with the offer for the Scope of Work will be accepted.
Quantity: Quantity for CAMC of MPCS Ver-2 & MPCS Ver-3 will be as per figure mentioned in schedule column of tender document for respective sheds for the period of two years.
Penalty Clause is as per RDSO SMI no. RDSO/2016/EL/SMI/0288 (REV.'0') dtd. 21.06.2016. However, the penalties will be charged as per latest guidelines of RDSO if modified during the execution of contract.
Warranty Clause:- Any failure arising out of faulty workmanship on part of the contractor or for the defective material, used by the contractor, the decision of Sr. DME/TRS/IPTE in regard to the cause of failure and nature of rectification to be carried out by the contractor shall be final and binding on part of the contractor.
Other terms and conditions:- (i)The entire cost of transport shall be borne by the contractor. Defaults and delay on account of transport shall not be a reason of for extension of the completion period /Delivery date under any circumstances. (ii) The tenderer should take utmost care to ensure that, there should not be any deviation from the design/dimensional construction of the equipment. (iii)The contractor should have all necessary machinery, plant and testing equipment for execution of work. They should also have all measuring tools instruments properly calibrated with validity of calibration during execution of work. (iv)The contractor will have to use all the materials purchased from Railway/RDSO approved sources as per Railway approved drawings and specifications.
INSPECTION: Initial joint inspection shall be done before commencement of the work and final joint inspection shall be done after completion of work, by the tenderer along with Railway's representative.
Determination of contract: (1) Right of railway to determine the contract: The Railway shall be entitled to determine and terminate the contract at any time should, in the Railways opinion, the cessation of work becomes necessary owing to paucity of funds or from any other cause whatever, in which case the value of approved material at site and of work done to date by the Contractor will be paid for in full at the rate specified in the contract. Notice in writing from the Railway of such determination and the reasons therefore shall be conclusive evidence thereof. (2 )Payment of determination of contract: Should the contract be determined under sub clause (1) of this clause and the Contractor claims payment for expenditure incurred by him in the expectation of completing the whole of the work, the Railway shall admit and consider such claims as are deemed reasonable and are supported by vouchers to the satisfaction of the Engineer. The Railways decision on the necessity and propriety of such expenditure shall be final and conclusive. (3)The Contractor shall have no claim to any payment of compensation or otherwise, howsoever on account of any profit or advantage which he might have derived from the execution of the work in full but which he did not derive in consequence of determination of contract.
CAMC for M/s Medha make Microprocessor based Control and Fault Diagnostic System (MPCS) Ver-2 & Ver-3 fitted in 25 KV AC Electric locomotives of SER (ELS/IPTN, ELS/SRC & ELS/KGP) with OEM for 2 years.
IPTE-TRS-AMC-MPCS-V2-V3
IPTE-TRS-AMC-MPCS-V2-V3
Single
Works - General
24 Months
Bokaro, Jharkhand
₹0
₹4.1 L
10 Apr 2026
17 Mar 2026
27 Mar 2026
5 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 5,21,76,900.32 | ||
| — | 3264.00 | — | — | ||
| CAMC for M/s Medha make Microprocessor based Control and Fault Diagnostic System (MPCS) Ver-2 fitted in 25 KV AC Electric locomotives of SER (ELS/IPTN= 1440 Loco Months, ELS/SRC= 456 Loco Months & ELS/KGP= 1368 Loco Months) with OEM for 2 years.(Total 3264 Loco Months. Loco details attached). | — | — | — | 1,31,18,211.84 | |
| — | 2648.00 | — | — | ||
| CAMC for M/s Medha make Microprocessor based Control and Fault Diagnostic System (MPCS) Ver-3 fitted in 25 KV AC Electric locomotives of SER (ELS/IPTN= 729 Loco Months, ELS/SRC= 599 Loco Months & ELS/KGP= 1320 Loco Months) with OEM for 2 years. (Total 2648 Loco Months. Loco details attached) | — | — | — | 3,90,58,688.48 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Checklist.pdf
ATTACHMENT
ScopeofworkMPCS.pdf
ATTACHMENT
SMInoRDSOMPCS.pdf
ATTACHMENT
LocolistforMPCS.pdf
ATTACHMENT
tenderformfirstsheet.pdf
ATTACHMENT
Annexuretoalltenderer.pdf
ATTACHMENT
detailsoftenderer.pdf
ATTACHMENT
GCC_April-22_1.pdf
ATTACHMENT
correctionslipofGCC1to6.pdf
ATTACHMENT
CorrectionslipIRGCC7to9.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .